KYTC contract 26-4128 bid tabulation
ASPHALT SURFACE WITH GRADE & DRAIN KY HIGHWAY 90 (KY 90). Let by Kentucky Transportation Cabinet on September 24, 2026. 3 bids received; low bid $3,619,935 by Bluegrass Contracting Corporation, +8.1% against the engineer's estimate of $3,349,970.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 24 SEP 2026
- Pay items
- 130
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Bluegrass Contracting Corporation | $3,619,935 | Low | +8.0% |
| 2 | Mago Construction Company LLC | $3,785,698 | +5.0% | +13% |
| 3 | Rame Contracting LLC | $3,866,045 | +7.0% | +15% |
Engineer's estimate: $3,349,970.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Bluegrass Contracting Corporation | 2. Mago Construction Company LLC | 3. Rame Contracting LLC |
|---|---|---|---|---|---|---|
| 0010 | Crushed stone base | TON A A | 4,245 | $41.00 | $50.00 | $46.00 |
| 0020 | Asphalt seal aggregate | TON A A | 32 | $1,000.00 | $900.00 | $900.00 |
| 0030 | Asphalt seal coat | TON A A | 3.90 | $2,825.00 | $2,500.00 | $2,500.00 |
| 0040 | Leveling & wedging PG64-22 | TON A A | 1,529 | $271.00 | $240.00 | $240.00 |
| 0050 | CL3 asph base 1.00D PG64-22 | TON A A | 2,540 | $215.00 | $190.00 | $190.00 |
| 0060 | CL2 asph surf 0.38D PG64-22 | TON A A | 576 | $186.00 | $165.00 | $165.00 |
| 0070 | Asphalt material for tack | TON A A | 16.70 | $1,130.00 | $1,000.00 | $1,000.00 |
| 0080 | CL3 asph surf 0.38B PG64-22 | TON A A | 1,314 | $215.00 | $190.00 | $190.00 |
| 0090 | JPC pavement-11 in | SQYD A A | 492 | $215.00 | $160.00 | $156.86 |
| 0100 | Mobilization for mill & text | LS A A | 1 | $4,000.00 | $25,000 | $74,500 |
| 0110 | Asphalt pave milling & texturing | TON A A | 1,349 | $42.00 | $145.00 | $55.00 |
| 0120 | Joint adhesive | LF A A | 4,545 | $1.70 | $1.00 | $1.00 |
| 0130 | Longitudinal edge key | LF A A | 4,787 | $4.00 | $10.00 | $11.70 |
| 0140 | Electronic delivery MGMT system - agg | LS A A | 1 | $1.00 | $1.00 | $1,000.00 |
| 0150 | Standard curb and gutter | LF A A | 1,276 | $39.00 | $33.00 | $32.55 |
| 0160 | Lip curb and gutter | LF A A | 935 | $42.00 | $34.00 | $33.94 |
| 0170 | Standard header curb | LF A A | 353 | $46.00 | $42.00 | $41.52 |
| 0180 | Barrier header curb | LF A A | 248 | $47.00 | $38.00 | $37.52 |
| 0190 | Standard barrier median type 4 | SQYD A A | 1,546 | $93.50 | $100.00 | $98.11 |
| 0200 | Delineator for G/R BI directional white | EACH A A | 27 | $0.01 | $0.25 | $10.79 |
| 0210 | Barricade-type III | EACH A A | 21 | $181.00 | $150.00 | $423.12 |
| 0220 | Temp ditch | LF A A | 1,268 | $2.50 | $1.25 | $0.25 |
| 0230 | Clean temp ditch | LF A A | 634 | $3.00 | $0.25 | $0.50 |
| 0240 | Embankment in place | CUYD A A | 2,961 | $44.00 | $55.00 | $90.00 |
| 0250 | Channel lining class II | TON A A | 100 | $67.00 | $50.00 | $51.00 |
| 0260 | Clearing and grubbing | LS A A | 1 | $23,000 | $10,000 | $13,000 |
| 0270 | Temporary signs | SQFT A A | 472 | $10.00 | $6.00 | $6.75 |
| 0280 | Maintain & control traffic | LS A A | 1 | $230,000 | $354,000 | $368,262 |
| 0290 | Portable changeable message sign | EACH A A | 6 | $4,500.00 | $4,590.00 | $6,360.00 |
| 0300 | Edgeline rumble strips | LF A A | 4,337 | $1.25 | $2.00 | $0.90 |
| 0310 | Temp silt fence | LF A A | 1,268 | $2.00 | $3.00 | $3.25 |
| 0320 | Silt trap type A | EACH A A | 10 | $273.00 | $300.00 | $500.00 |
| 0330 | Silt trap type B | EACH A A | 10 | $70.00 | $300.00 | $260.00 |
| 0340 | Silt trap type C | EACH A A | 10 | $180.00 | $300.00 | $260.00 |
| 0350 | Clean silt trap type A | EACH A A | 10 | $85.00 | $12.00 | $56.00 |
| 0360 | Clean silt trap type B | EACH A A | 10 | $85.00 | $12.00 | $56.00 |
| 0370 | Clean silt trap type C | EACH A A | 10 | $45.00 | $12.00 | $56.00 |
| 0380 | Sidewalk-4 in concrete | SQYD A A | 100 | $94.00 | $95.00 | $93.07 |
| 0390 | Staking | LS A A | 1 | $95,000 | $40,000 | $61,598 |
| 0400 | Erosion control blanket | SQYD A A | 300 | $2.50 | $2.20 | $2.14 |
| 0410 | Temp mulch | SQYD A A | 23,055 | $0.40 | $0.36 | $0.35 |
| 0420 | Temp seeding and protection | SQYD A A | 17,290 | $0.40 | $0.37 | $0.36 |
| 0430 | Initial fertilizer | TON A A | 1.40 | $1,720.00 | $1,567.75 | $1,522.09 |
| 0440 | Maintenance fertilizer | TON A A | 0.90 | $1,720.00 | $1,567.76 | $1,522.09 |
| 0450 | Seeding and protection | SQYD A A | 25,005 | $0.70 | $0.62 | $0.60 |
| 0460 | Sodding | SQYD A A | 1,749 | $12.00 | $11.23 | $10.90 |
| 0470 | Agricultural limestone | TON A A | 17 | $81.00 | $73.56 | $71.42 |
| 0480 | Topsoil furnished and placed | CUYD A A | 541 | $64.00 | $57.00 | $56.20 |
| 0490 | Pave striping-temp paint-4 in | LF A A | 42,000 | $0.25 | $0.21 | $0.20 |
| 0500 | Pave striping-temp paint-8 in | LF A A | 2,500 | $0.50 | $0.41 | $0.40 |
| 0510 | Pave striping-thermo-6 in W | LF A A | 7,672 | $1.15 | $1.03 | $1.00 |
| 0520 | Pave striping-thermo-6 in Y | LF A A | 7,847 | $1.15 | $1.03 | $1.00 |
| 0530 | Pave striping-thermo-12 in W | LF A A | 303 | $3.00 | $2.58 | $2.50 |
| 0540 | Pave striping-thermo-12 in Y | LF A A | 33 | $3.00 | $2.58 | $2.50 |
| 0550 | Pave striping-temp rem tape-B | LF A A | 1,400 | $3.50 | $3.09 | $3.00 |
| 0560 | Pave striping-temp rem tape-W | LF A A | 850 | $3.00 | $2.83 | $2.75 |
| 0570 | Pave striping-temp rem tape-Y | LF A A | 1,000 | $3.00 | $2.83 | $2.75 |
| 0580 | Pave marking-thermo stop bar-24IN | LF A A | 85 | $14.00 | $12.36 | $12.00 |
| 0590 | Pave marking-thermo cross-hatch | SQFT A A | 1,082 | $5.00 | $4.64 | $4.50 |
| 0600 | Pave marking-thermo curv arrow | EACH A A | 16 | $136.00 | $123.60 | $120.00 |
| 0610 | Pave marking-thermo comb arrow | EACH A A | 4 | $181.00 | $164.80 | $160.00 |
| 0620 | Pavement marker TY iva-MW temp | EACH A A | 100 | $6.00 | $5.15 | $5.00 |
| 0630 | Pavement marker TY iva-by temp | EACH A A | 100 | $6.00 | $5.15 | $5.00 |
| 0640 | Fuel adjustment | DOLL A A | 3,128 | $1.00 | $1.00 | $1.00 |
| 0650 | Asphalt adjustment | DOLL A A | 24,134 | $1.00 | $1.00 | $1.00 |
| 0660 | Object marker TY 3 | EACH A A | 2 | $40.00 | $35.00 | $34.29 |
| 0670 | Pave mark-paint arrows | EACH A A | 22 | $75.00 | $66.95 | $65.00 |
| 0680 | Maintain lighting | LS A A | 1 | $11,300 | $10,300 | $10,000 |
| 0690 | Centerline rumble strips | LF A A | 1,553 | $1.25 | $0.93 | $0.90 |
| 0700 | Remove traffic island | SQYD A A | 2,039 | $12.75 | $40.00 | $23.25 |
| 0710 | Pave marking-thermo yield bar-36 in | LF A A | 52 | $40.00 | $36.05 | $35.00 |
| 0720 | Pave mark temp paint stop bar-24 in | LF A A | 111 | $7.00 | $6.18 | $6.00 |
| 0730 | Detectable warnings | SQFT A A | 96 | $50.00 | $50.00 | $44.46 |
| 0740 | Yellow paint for median safety nose | SQFT A A | 54 | $5.75 | $5.15 | $5.00 |
| 0750 | Pave mark thermo chevron | SQFT A A | 413 | $5.00 | $4.64 | $4.50 |
| 0760 | Pave marking-thermo dotted lane exten | LF A A | 88 | $8.00 | $7.21 | $7.00 |
| 0770 | Pave marking-thermo dotted lane exten | LF A A | 52 | $4.00 | $3.61 | $3.50 |
| 0780 | Remove pavement marker | EACH A A | 28 | $22.00 | $25.00 | $122.67 |
| 0790 | Pavement marking-white paint | SQFT A A | 120 | $5.75 | $5.15 | $5.00 |
| 0800 | Storm sewer pipe-15 in | LF A A | 351 | $98.00 | $170.00 | $115.00 |
| 0810 | Storm sewer pipe-18 in | LF A A | 64 | $175.00 | $238.00 | $215.00 |
| 0820 | Pipe culvert headwall-15 in | EACH A A | 7 | $1,574.00 | $2,175.00 | $1,750.00 |
| 0830 | Pipe culvert headwall-18 in | EACH A A | 1 | $3,400.00 | $2,190.00 | $1,850.00 |
| 0840 | Curb box inlet type B | EACH A A | 4 | $7,077.00 | $7,455.00 | $8,650.00 |
| 0850 | Drop box inlet type 13G | EACH A A | 6 | $3,687.00 | $4,500.00 | $4,725.00 |
| 0860 | Drop box inlet type 13S | EACH A A | 3 | $7,300.00 | $6,500.00 | $8,060.00 |
| 0870 | Fill and cap inlet | EACH A A | 3 | $3,000.00 | $3,550.00 | $2,486.30 |
| 0880 | Fabric-geotextile class 2 for pipe | SQYD A A | 500 | $2.00 | $2.00 | $2.00 |
| 0890 | Remove headwall | EACH A A | 3 | $1,935.00 | $630.00 | $1,800.00 |
| 0900 | Safeloading | CUYD A A | 9.70 | $188.00 | $1,180.00 | $925.00 |
| 0910 | Pipeline inspection | LF A A | 250 | $12.00 | $12.00 | $10.40 |
| 0920 | SBM alum sheet signs .080 in | SQFT A A | 368.46 | $38.00 | $34.38 | $72.38 |
| 0930 | SBM alum sheet signs .125 in | SQFT A A | 192 | $42.00 | $37.98 | $76.47 |
| 0940 | Steel post type 1 | LF A A | 827 | $24.00 | $21.67 | $48.44 |
| 0950 | Class A concrete for signs | CUYD A A | 2 | $1,350.00 | $1,231.53 | $2,222.41 |
| 0960 | Remove sign | EACH A A | 16 | $37.00 | $50.00 | $661.63 |
| 0970 | GMSS type D | EACH A A | 8 | $746.00 | $680.23 | $1,228.82 |
| 0980 | GMSS type D | EACH A A | 8 | $490.00 | $446.76 | $1,433.75 |
| 0990 | Barcode sign inventory | EACH A A | 108 | $19.00 | $16.81 | $46.32 |
| 1000 | Remove signal equipment | EACH A A | 1 | $11,300 | $10,300 | $10,000 |
| 1010 | Install radar presence detector type A | EACH A A | 4 | $1,700.00 | $1,545.00 | $1,500.00 |
| 1020 | Install radar advance detector type B | EACH A A | 2 | $1,700.00 | $1,545.00 | $1,500.00 |
| 1030 | Pole 40 FT MTG HT | EACH A A | 12 | $4,000.00 | $3,605.00 | $3,500.00 |
| 1040 | Bracket 8 FT | EACH A A | 5 | $370.00 | $334.75 | $325.00 |
| 1050 | Bracket 10 FT | EACH A A | 3 | $565.00 | $515.00 | $500.00 |
| 1060 | Bracket 15 FT | EACH A A | 4 | $735.00 | $669.50 | $650.00 |
| 1070 | Pole base | EACH A A | 12 | $2,825.00 | $2,575.00 | $2,500.00 |
| 1080 | Transformer base | EACH A A | 12 | $1,700.00 | $1,545.00 | $1,500.00 |
| 1090 | Lighting control equipment | EACH A A | 1 | $17,275 | $15,751 | $15,292 |
| 1100 | Fused connector kit | EACH A A | 24 | $290.00 | $257.50 | $250.00 |
| 1110 | Trenching and backfilling | LF A A | 1,200 | $15.50 | $13.95 | $13.54 |
| 1120 | Wire-no. 12 | LF A A | 2,200 | $0.30 | $0.29 | $0.28 |
| 1130 | Electrical junction box type A | EACH A A | 9 | $4,000.00 | $3,605.00 | $3,500.00 |
| 1140 | Bore and jack conduit | LF A A | 1,050 | $14.50 | $13.25 | $12.86 |
| 1150 | Wire-no. 10 | LF A A | 6,000 | $3.00 | $2.75 | $2.67 |
| 1160 | LED luminaire | EACH A A | 12 | $1,150.00 | $1,030.00 | $1,000.00 |
| 1170 | PVC conduit-1 1/4 in-schedule 80 | LF A A | 1,200 | $1.50 | $1.22 | $1.18 |
| 1180 | PVC conduit-2 in-schedule 80 | LF A A | 1,050 | $2.00 | $1.85 | $1.80 |
| 1190 | Delineator for G/R BI directional white | EACH A A | 27 | $12.00 | $11.11 | $10.79 |
| 1200 | G/R-W beam-S face TL-3 | LF A A | 1,320 | $35.00 | $32.02 | $31.09 |
| 1210 | G/R terminal section no 1 | EACH A A | 2 | $73.00 | $67.20 | $65.24 |
| 1220 | G/R end treatment type 1 | EACH A A | 2 | $3,537.00 | $3,225.48 | $4,293.50 |
| 1230 | Remove G/R | LF A A | 1,450 | $3.00 | $2.99 | $2.90 |
| 1240 | Tree | EACH A A | 3 | $778.00 | $709.46 | $688.80 |
| 1250 | Shrub | EACH A A | 9 | $345.00 | $314.73 | $305.56 |
| 1260 | Shrub | EACH A A | 18 | $227.00 | $206.53 | $200.51 |
| 1270 | Container plants | EACH A A | 54 | $187.00 | $169.90 | $164.95 |
| 1280 | Decorative rock | SQFT A A | 4,738 | $7.00 | $6.24 | $6.06 |
| 1290 | Mobilization | LS A A | 1 | $168,500 | $176,450 | $169,250 |
| 1300 | Demobilization | LS A A | 1 | $51,009 | $52,936 | $57,929 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of September 24, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.