KYTC contract 26-4128 bid tabulation

ASPHALT SURFACE WITH GRADE & DRAIN KY HIGHWAY 90 (KY 90). Let by Kentucky Transportation Cabinet on September 24, 2026. 3 bids received; low bid $3,619,935 by Bluegrass Contracting Corporation, +8.1% against the engineer's estimate of $3,349,970.

Owner
Kentucky Transportation Cabinet
Letting
24 SEP 2026
Pay items
130
Data through
22 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Bluegrass Contracting Corporation$3,619,935Low+8.0%
2Mago Construction Company LLC$3,785,698+5.0%+13%
3Rame Contracting LLC$3,866,045+7.0%+15%
KYTC contract 26-4128: bids by rank

Engineer's estimate: $3,349,970.

Bid tabulation

LinePay itemUnitQuantity1. Bluegrass Contracting Corporation2. Mago Construction Company LLC3. Rame Contracting LLC
0010Crushed stone baseTON A A4,245$41.00$50.00$46.00
0020Asphalt seal aggregateTON A A32$1,000.00$900.00$900.00
0030Asphalt seal coatTON A A3.90$2,825.00$2,500.00$2,500.00
0040Leveling & wedging PG64-22TON A A1,529$271.00$240.00$240.00
0050CL3 asph base 1.00D PG64-22TON A A2,540$215.00$190.00$190.00
0060CL2 asph surf 0.38D PG64-22TON A A576$186.00$165.00$165.00
0070Asphalt material for tackTON A A16.70$1,130.00$1,000.00$1,000.00
0080CL3 asph surf 0.38B PG64-22TON A A1,314$215.00$190.00$190.00
0090JPC pavement-11 inSQYD A A492$215.00$160.00$156.86
0100Mobilization for mill & textLS A A1$4,000.00$25,000$74,500
0110Asphalt pave milling & texturingTON A A1,349$42.00$145.00$55.00
0120Joint adhesiveLF A A4,545$1.70$1.00$1.00
0130Longitudinal edge keyLF A A4,787$4.00$10.00$11.70
0140Electronic delivery MGMT system - aggLS A A1$1.00$1.00$1,000.00
0150Standard curb and gutterLF A A1,276$39.00$33.00$32.55
0160Lip curb and gutterLF A A935$42.00$34.00$33.94
0170Standard header curbLF A A353$46.00$42.00$41.52
0180Barrier header curbLF A A248$47.00$38.00$37.52
0190Standard barrier median type 4SQYD A A1,546$93.50$100.00$98.11
0200Delineator for G/R BI directional whiteEACH A A27$0.01$0.25$10.79
0210Barricade-type IIIEACH A A21$181.00$150.00$423.12
0220Temp ditchLF A A1,268$2.50$1.25$0.25
0230Clean temp ditchLF A A634$3.00$0.25$0.50
0240Embankment in placeCUYD A A2,961$44.00$55.00$90.00
0250Channel lining class IITON A A100$67.00$50.00$51.00
0260Clearing and grubbingLS A A1$23,000$10,000$13,000
0270Temporary signsSQFT A A472$10.00$6.00$6.75
0280Maintain & control trafficLS A A1$230,000$354,000$368,262
0290Portable changeable message signEACH A A6$4,500.00$4,590.00$6,360.00
0300Edgeline rumble stripsLF A A4,337$1.25$2.00$0.90
0310Temp silt fenceLF A A1,268$2.00$3.00$3.25
0320Silt trap type AEACH A A10$273.00$300.00$500.00
0330Silt trap type BEACH A A10$70.00$300.00$260.00
0340Silt trap type CEACH A A10$180.00$300.00$260.00
0350Clean silt trap type AEACH A A10$85.00$12.00$56.00
0360Clean silt trap type BEACH A A10$85.00$12.00$56.00
0370Clean silt trap type CEACH A A10$45.00$12.00$56.00
0380Sidewalk-4 in concreteSQYD A A100$94.00$95.00$93.07
0390StakingLS A A1$95,000$40,000$61,598
0400Erosion control blanketSQYD A A300$2.50$2.20$2.14
0410Temp mulchSQYD A A23,055$0.40$0.36$0.35
0420Temp seeding and protectionSQYD A A17,290$0.40$0.37$0.36
0430Initial fertilizerTON A A1.40$1,720.00$1,567.75$1,522.09
0440Maintenance fertilizerTON A A0.90$1,720.00$1,567.76$1,522.09
0450Seeding and protectionSQYD A A25,005$0.70$0.62$0.60
0460SoddingSQYD A A1,749$12.00$11.23$10.90
0470Agricultural limestoneTON A A17$81.00$73.56$71.42
0480Topsoil furnished and placedCUYD A A541$64.00$57.00$56.20
0490Pave striping-temp paint-4 inLF A A42,000$0.25$0.21$0.20
0500Pave striping-temp paint-8 inLF A A2,500$0.50$0.41$0.40
0510Pave striping-thermo-6 in WLF A A7,672$1.15$1.03$1.00
0520Pave striping-thermo-6 in YLF A A7,847$1.15$1.03$1.00
0530Pave striping-thermo-12 in WLF A A303$3.00$2.58$2.50
0540Pave striping-thermo-12 in YLF A A33$3.00$2.58$2.50
0550Pave striping-temp rem tape-BLF A A1,400$3.50$3.09$3.00
0560Pave striping-temp rem tape-WLF A A850$3.00$2.83$2.75
0570Pave striping-temp rem tape-YLF A A1,000$3.00$2.83$2.75
0580Pave marking-thermo stop bar-24INLF A A85$14.00$12.36$12.00
0590Pave marking-thermo cross-hatchSQFT A A1,082$5.00$4.64$4.50
0600Pave marking-thermo curv arrowEACH A A16$136.00$123.60$120.00
0610Pave marking-thermo comb arrowEACH A A4$181.00$164.80$160.00
0620Pavement marker TY iva-MW tempEACH A A100$6.00$5.15$5.00
0630Pavement marker TY iva-by tempEACH A A100$6.00$5.15$5.00
0640Fuel adjustmentDOLL A A3,128$1.00$1.00$1.00
0650Asphalt adjustmentDOLL A A24,134$1.00$1.00$1.00
0660Object marker TY 3EACH A A2$40.00$35.00$34.29
0670Pave mark-paint arrowsEACH A A22$75.00$66.95$65.00
0680Maintain lightingLS A A1$11,300$10,300$10,000
0690Centerline rumble stripsLF A A1,553$1.25$0.93$0.90
0700Remove traffic islandSQYD A A2,039$12.75$40.00$23.25
0710Pave marking-thermo yield bar-36 inLF A A52$40.00$36.05$35.00
0720Pave mark temp paint stop bar-24 inLF A A111$7.00$6.18$6.00
0730Detectable warningsSQFT A A96$50.00$50.00$44.46
0740Yellow paint for median safety noseSQFT A A54$5.75$5.15$5.00
0750Pave mark thermo chevronSQFT A A413$5.00$4.64$4.50
0760Pave marking-thermo dotted lane extenLF A A88$8.00$7.21$7.00
0770Pave marking-thermo dotted lane extenLF A A52$4.00$3.61$3.50
0780Remove pavement markerEACH A A28$22.00$25.00$122.67
0790Pavement marking-white paintSQFT A A120$5.75$5.15$5.00
0800Storm sewer pipe-15 inLF A A351$98.00$170.00$115.00
0810Storm sewer pipe-18 inLF A A64$175.00$238.00$215.00
0820Pipe culvert headwall-15 inEACH A A7$1,574.00$2,175.00$1,750.00
0830Pipe culvert headwall-18 inEACH A A1$3,400.00$2,190.00$1,850.00
0840Curb box inlet type BEACH A A4$7,077.00$7,455.00$8,650.00
0850Drop box inlet type 13GEACH A A6$3,687.00$4,500.00$4,725.00
0860Drop box inlet type 13SEACH A A3$7,300.00$6,500.00$8,060.00
0870Fill and cap inletEACH A A3$3,000.00$3,550.00$2,486.30
0880Fabric-geotextile class 2 for pipeSQYD A A500$2.00$2.00$2.00
0890Remove headwallEACH A A3$1,935.00$630.00$1,800.00
0900SafeloadingCUYD A A9.70$188.00$1,180.00$925.00
0910Pipeline inspectionLF A A250$12.00$12.00$10.40
0920SBM alum sheet signs .080 inSQFT A A368.46$38.00$34.38$72.38
0930SBM alum sheet signs .125 inSQFT A A192$42.00$37.98$76.47
0940Steel post type 1LF A A827$24.00$21.67$48.44
0950Class A concrete for signsCUYD A A2$1,350.00$1,231.53$2,222.41
0960Remove signEACH A A16$37.00$50.00$661.63
0970GMSS type DEACH A A8$746.00$680.23$1,228.82
0980GMSS type DEACH A A8$490.00$446.76$1,433.75
0990Barcode sign inventoryEACH A A108$19.00$16.81$46.32
1000Remove signal equipmentEACH A A1$11,300$10,300$10,000
1010Install radar presence detector type AEACH A A4$1,700.00$1,545.00$1,500.00
1020Install radar advance detector type BEACH A A2$1,700.00$1,545.00$1,500.00
1030Pole 40 FT MTG HTEACH A A12$4,000.00$3,605.00$3,500.00
1040Bracket 8 FTEACH A A5$370.00$334.75$325.00
1050Bracket 10 FTEACH A A3$565.00$515.00$500.00
1060Bracket 15 FTEACH A A4$735.00$669.50$650.00
1070Pole baseEACH A A12$2,825.00$2,575.00$2,500.00
1080Transformer baseEACH A A12$1,700.00$1,545.00$1,500.00
1090Lighting control equipmentEACH A A1$17,275$15,751$15,292
1100Fused connector kitEACH A A24$290.00$257.50$250.00
1110Trenching and backfillingLF A A1,200$15.50$13.95$13.54
1120Wire-no. 12LF A A2,200$0.30$0.29$0.28
1130Electrical junction box type AEACH A A9$4,000.00$3,605.00$3,500.00
1140Bore and jack conduitLF A A1,050$14.50$13.25$12.86
1150Wire-no. 10LF A A6,000$3.00$2.75$2.67
1160LED luminaireEACH A A12$1,150.00$1,030.00$1,000.00
1170PVC conduit-1 1/4 in-schedule 80LF A A1,200$1.50$1.22$1.18
1180PVC conduit-2 in-schedule 80LF A A1,050$2.00$1.85$1.80
1190Delineator for G/R BI directional whiteEACH A A27$12.00$11.11$10.79
1200G/R-W beam-S face TL-3LF A A1,320$35.00$32.02$31.09
1210G/R terminal section no 1EACH A A2$73.00$67.20$65.24
1220G/R end treatment type 1EACH A A2$3,537.00$3,225.48$4,293.50
1230Remove G/RLF A A1,450$3.00$2.99$2.90
1240TreeEACH A A3$778.00$709.46$688.80
1250ShrubEACH A A9$345.00$314.73$305.56
1260ShrubEACH A A18$227.00$206.53$200.51
1270Container plantsEACH A A54$187.00$169.90$164.95
1280Decorative rockSQFT A A4,738$7.00$6.24$6.06
1290MobilizationLS A A1$168,500$176,450$169,250
1300DemobilizationLS A A1$51,009$52,936$57,929
KYTC contract 26-4128: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.

Every contract let that day: KYTC letting of September 24, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy