KYTC contract 25-1311 bid tabulation

AIRPORT CONSTRUCTION CAPITAL CITY AIRPORT. Let by Kentucky Transportation Cabinet on May 22, 2025. 3 bids received; low bid $875,000 by Louisville Paving Company Inc, +1.3% against the engineer's estimate of $864,163.

Owner
Kentucky Transportation Cabinet
Letting
22 MAY 2025
Pay items
54
Data through
22 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Louisville Paving Company Inc$875,000Low+1.0%
2Cleary Construction Inc$978,000+12%+13%
3Bluegrass Contracting Corporation$1,344,370+54%+56%
KYTC contract 25-1311: bids by rank

Engineer's estimate: $864,163.

Bid tabulation

LinePay itemUnitQuantity1. Louisville Paving Company Inc2. Cleary Construction Inc3. Bluegrass Contracting Corporation
0010Crushed stone baseTON1,640$32.50$40.00$53.00
0020Geogrid reinforcement for subgradeSY2,150$5.25$4.50$3.25
0030CL2 asph base 1.00D PG64-22TON405$111.00$111.00$130.00
0040CL2 asph surf 0.38D PG64-22TON150$159.00$159.00$190.00
0050Storm sewer pipe-12 inLF55$58.00$90.00$165.00
0060Storm sewer pipe-15 inLF530$60.00$95.00$215.00
0070Storm sewer pipe-18 inLF225$110.00$115.00$220.00
0080Pipe culvert headwall-15 inEACH1$7,700.00$9,000.00$7,300.00
0090Pipe culvert headwall-15 inEACH1$7,700.00$9,000.00$9,950.00
0100Pipe culvert headwall-18 inEACH1$5,300.00$6,500.00$7,000.00
0110Remove pipeLF25$46.00$150.00$65.00
0120S & F box inlet-outlet-15 inEACH2$3,350.00$4,500.00$3,500.00
0130S & F box inlet-outlet-18 inEACH1$6,500.00$4,500.00$3,850.00
0140Drop box inlet type 2EACH1$5,250.00$10,000$4,250.00
0150Drop box inlet type 14EACH1$2,225.00$4,500.00$4,000.00
0160Junction box-18 inEACH2$2,050.00$3,500.00$3,750.00
0170Spring box inlet specialEACH1$5,250.00$5,000.00$7,250.00
0180Standard header curbLF195$75.00$60.91$85.00
0190Paved ditch type 1SY40$285.00$241.92$255.00
0200Borrow excavationCY600$132.00$98.00$60.00
0210Remove fenceLF25$60.00$80.00$180.00
0220Remove trees or stumpsEACH20$352.00$1,200.00$990.00
0230Fabric-geotextile class 2SY2,370$2.75$3.00$2.25
0240Remove headwallEACH2$1,600.00$1,500.00$650.00
0250Temp silt fenceLF1,000$3.84$3.00$4.00
0260Remove concrete sidewalkSY70$55.00$80.00$75.00
0270Conduit-4 inLF180$140.35$50.00$145.00
0280Open cut roadwayLF80$110.00$100.00$85.00
0290Cyclopean stone rip rapTON180$57.00$85.00$120.00
0300S pipe specialLF200$43.00$105.00$215.00
0310S pipe specialLF8$163.00$335.00$250.00
0320S manholeEACH1$4,500.00$6,500.00$7,600.00
0330S manhole tap existingEACH1$3,500.00$10,000$4,500.00
0340EC duct - 06 bank concrete encasedLF40$552.68$200.00$360.00
0350EC directional boreLF180$176.50$300.00$190.00
0360Install pole mounted signEACH2$500.00$1,000.00$1,150.00
0370Asphalt milling and texturingSY140$33.50$65.09$65.00
0380Kpdes permit and temp erosion controlLS1$21,000$25,000$50,000
0390Remove gravel entranceSY105$19.25$35.00$32.00
0400Chain link fenceLF25$200.00$200.00$240.00
0410Overflow structureEACH1$12,500$6,500.00$9,500.00
0420Utility coordinationLS1$50,000$50,000$50,000
0430Site preparationLS1$15,992$50,000$75,000
0440Asphalt pavement removal(all depths)SY587$19.50$12.00$33.50
0450Unsuitable excavationCY500$65.00$60.00$100.00
0460Topsoiling-4 in thick obtained on siteSY9,380$3.25$4.00$7.50
0470Elec JCT STRC CLS 1 L-867-16 X 24 in-insEACH1$13,674$6,500.00$3,750.00
0480Pavement marking-yellow paintSF240$10.00$10.00$12.00
0490Pavement marking-white paintSF50$10.00$10.00$12.00
0500Seeding and mulchingACRE2$4,325.00$2,000.00$16,000
0510Unclassified excavationCY1,350$15.58$65.00$80.00
0520Ornamental vehicular gate - cantileverEACH1$49,200$35,000$41,500
0530DemobilizationLS1$13,125$14,949$19,901
0540MobilizationLS1$87,500$48,000$120,000
KYTC contract 25-1311: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.

Every contract let that day: KYTC letting of May 22, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy