KYTC contract 25-1311 bid tabulation
AIRPORT CONSTRUCTION CAPITAL CITY AIRPORT. Let by Kentucky Transportation Cabinet on May 22, 2025. 3 bids received; low bid $875,000 by Louisville Paving Company Inc, +1.3% against the engineer's estimate of $864,163.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 22 MAY 2025
- Pay items
- 54
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Louisville Paving Company Inc | $875,000 | Low | +1.0% |
| 2 | Cleary Construction Inc | $978,000 | +12% | +13% |
| 3 | Bluegrass Contracting Corporation | $1,344,370 | +54% | +56% |
Engineer's estimate: $864,163.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Louisville Paving Company Inc | 2. Cleary Construction Inc | 3. Bluegrass Contracting Corporation |
|---|---|---|---|---|---|---|
| 0010 | Crushed stone base | TON | 1,640 | $32.50 | $40.00 | $53.00 |
| 0020 | Geogrid reinforcement for subgrade | SY | 2,150 | $5.25 | $4.50 | $3.25 |
| 0030 | CL2 asph base 1.00D PG64-22 | TON | 405 | $111.00 | $111.00 | $130.00 |
| 0040 | CL2 asph surf 0.38D PG64-22 | TON | 150 | $159.00 | $159.00 | $190.00 |
| 0050 | Storm sewer pipe-12 in | LF | 55 | $58.00 | $90.00 | $165.00 |
| 0060 | Storm sewer pipe-15 in | LF | 530 | $60.00 | $95.00 | $215.00 |
| 0070 | Storm sewer pipe-18 in | LF | 225 | $110.00 | $115.00 | $220.00 |
| 0080 | Pipe culvert headwall-15 in | EACH | 1 | $7,700.00 | $9,000.00 | $7,300.00 |
| 0090 | Pipe culvert headwall-15 in | EACH | 1 | $7,700.00 | $9,000.00 | $9,950.00 |
| 0100 | Pipe culvert headwall-18 in | EACH | 1 | $5,300.00 | $6,500.00 | $7,000.00 |
| 0110 | Remove pipe | LF | 25 | $46.00 | $150.00 | $65.00 |
| 0120 | S & F box inlet-outlet-15 in | EACH | 2 | $3,350.00 | $4,500.00 | $3,500.00 |
| 0130 | S & F box inlet-outlet-18 in | EACH | 1 | $6,500.00 | $4,500.00 | $3,850.00 |
| 0140 | Drop box inlet type 2 | EACH | 1 | $5,250.00 | $10,000 | $4,250.00 |
| 0150 | Drop box inlet type 14 | EACH | 1 | $2,225.00 | $4,500.00 | $4,000.00 |
| 0160 | Junction box-18 in | EACH | 2 | $2,050.00 | $3,500.00 | $3,750.00 |
| 0170 | Spring box inlet special | EACH | 1 | $5,250.00 | $5,000.00 | $7,250.00 |
| 0180 | Standard header curb | LF | 195 | $75.00 | $60.91 | $85.00 |
| 0190 | Paved ditch type 1 | SY | 40 | $285.00 | $241.92 | $255.00 |
| 0200 | Borrow excavation | CY | 600 | $132.00 | $98.00 | $60.00 |
| 0210 | Remove fence | LF | 25 | $60.00 | $80.00 | $180.00 |
| 0220 | Remove trees or stumps | EACH | 20 | $352.00 | $1,200.00 | $990.00 |
| 0230 | Fabric-geotextile class 2 | SY | 2,370 | $2.75 | $3.00 | $2.25 |
| 0240 | Remove headwall | EACH | 2 | $1,600.00 | $1,500.00 | $650.00 |
| 0250 | Temp silt fence | LF | 1,000 | $3.84 | $3.00 | $4.00 |
| 0260 | Remove concrete sidewalk | SY | 70 | $55.00 | $80.00 | $75.00 |
| 0270 | Conduit-4 in | LF | 180 | $140.35 | $50.00 | $145.00 |
| 0280 | Open cut roadway | LF | 80 | $110.00 | $100.00 | $85.00 |
| 0290 | Cyclopean stone rip rap | TON | 180 | $57.00 | $85.00 | $120.00 |
| 0300 | S pipe special | LF | 200 | $43.00 | $105.00 | $215.00 |
| 0310 | S pipe special | LF | 8 | $163.00 | $335.00 | $250.00 |
| 0320 | S manhole | EACH | 1 | $4,500.00 | $6,500.00 | $7,600.00 |
| 0330 | S manhole tap existing | EACH | 1 | $3,500.00 | $10,000 | $4,500.00 |
| 0340 | EC duct - 06 bank concrete encased | LF | 40 | $552.68 | $200.00 | $360.00 |
| 0350 | EC directional bore | LF | 180 | $176.50 | $300.00 | $190.00 |
| 0360 | Install pole mounted sign | EACH | 2 | $500.00 | $1,000.00 | $1,150.00 |
| 0370 | Asphalt milling and texturing | SY | 140 | $33.50 | $65.09 | $65.00 |
| 0380 | Kpdes permit and temp erosion control | LS | 1 | $21,000 | $25,000 | $50,000 |
| 0390 | Remove gravel entrance | SY | 105 | $19.25 | $35.00 | $32.00 |
| 0400 | Chain link fence | LF | 25 | $200.00 | $200.00 | $240.00 |
| 0410 | Overflow structure | EACH | 1 | $12,500 | $6,500.00 | $9,500.00 |
| 0420 | Utility coordination | LS | 1 | $50,000 | $50,000 | $50,000 |
| 0430 | Site preparation | LS | 1 | $15,992 | $50,000 | $75,000 |
| 0440 | Asphalt pavement removal(all depths) | SY | 587 | $19.50 | $12.00 | $33.50 |
| 0450 | Unsuitable excavation | CY | 500 | $65.00 | $60.00 | $100.00 |
| 0460 | Topsoiling-4 in thick obtained on site | SY | 9,380 | $3.25 | $4.00 | $7.50 |
| 0470 | Elec JCT STRC CLS 1 L-867-16 X 24 in-ins | EACH | 1 | $13,674 | $6,500.00 | $3,750.00 |
| 0480 | Pavement marking-yellow paint | SF | 240 | $10.00 | $10.00 | $12.00 |
| 0490 | Pavement marking-white paint | SF | 50 | $10.00 | $10.00 | $12.00 |
| 0500 | Seeding and mulching | ACRE | 2 | $4,325.00 | $2,000.00 | $16,000 |
| 0510 | Unclassified excavation | CY | 1,350 | $15.58 | $65.00 | $80.00 |
| 0520 | Ornamental vehicular gate - cantilever | EACH | 1 | $49,200 | $35,000 | $41,500 |
| 0530 | Demobilization | LS | 1 | $13,125 | $14,949 | $19,901 |
| 0540 | Mobilization | LS | 1 | $87,500 | $48,000 | $120,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of May 22, 2025. Compiled by Mirage Metrics.