KYTC contract 25-2337 bid tabulation
JPC PAVEMENT PRESTONSBURG STREET (US 460). Let by Kentucky Transportation Cabinet on September 25, 2025. 4 bids received; low bid $330,241 by Mountain Enterprises Inc, +6.2% against the engineer's estimate of $311,051.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 25 SEP 2025
- Pay items
- 24
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Mountain Enterprises Inc | $330,241 | Low | +6.0% |
| 2 | Bluegrass Contracting Corporation | $336,206 | +2.0% | +8.0% |
| 3 | The Harper Company DBA the W L Harper Co | $448,110 | +36% | +44% |
| 4 | Hinkle Construction Services LLC | $479,567 | +45% | +54% |
Engineer's estimate: $311,051.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Mountain Enterprises Inc | 2. Bluegrass Contracting Corporation | 3. The Harper Company DBA the W L Harper Co | 4. Hinkle Construction Services LLC |
|---|---|---|---|---|---|---|---|
| 0010 | Dga base | TON A A | 50 | $55.75 | $36.00 | $62.42 | $70.87 |
| 0020 | CL2 asph surf 0.38B PG64-22 | TON A A | 30 | $785.00 | $887.00 | $785.00 | $826.32 |
| 0030 | Asphalt material for tack | TON A A | 0.50 | $500.00 | $565.00 | $500.00 | $526.32 |
| 0040 | Barricade-type III | EACH A A | 3 | $174.00 | $182.00 | $150.00 | $139.47 |
| 0050 | JPC pavement-10 in | SQYD A A | 1,160 | $158.75 | $166.00 | $186.98 | $234.13 |
| 0060 | Remove pavement | SQYD A A | 1,160 | $19.85 | $28.00 | $41.29 | $23.62 |
| 0070 | Temporary signs | SQFT A A | 300 | $12.85 | $14.50 | $12.00 | $13.39 |
| 0080 | Maintain & control traffic | LS A A | 1 | $28,750 | $11,300 | $55,208 | $77,592 |
| 0090 | Portable changeable message sign | EACH A A | 3 | $845.00 | $846.00 | $833.72 | $781.05 |
| 0100 | Mobilization for mill & text | LS A A | 1 | $6,000.00 | $6,778.00 | $6,000.00 | $6,315.79 |
| 0110 | Asphalt pave milling & texturing | TON A A | 30 | $435.00 | $492.00 | $435.00 | $457.89 |
| 0120 | Staking | LS A A | 1 | $5,750.00 | $1,710.00 | $37,153 | $7,838.15 |
| 0130 | Arrow panel | EACH A A | 2 | $620.00 | $575.00 | $282.87 | $530.00 |
| 0140 | Pave striping-temp rem tape-B | LF A A | 750 | $3.60 | $4.50 | $3.60 | $3.79 |
| 0150 | Pave striping-temp rem tape-W | LF A A | 750 | $3.25 | $4.50 | $3.25 | $3.42 |
| 0160 | Pave striping-temp rem tape-Y | LF A A | 750 | $3.25 | $4.00 | $3.25 | $3.42 |
| 0170 | Pave striping-dur TY 1-6 in W | LF A A | 1,000 | $9.00 | $10.50 | $9.00 | $9.47 |
| 0180 | Pave striping-dur TY 1-6 in Y | LF A A | 1,000 | $9.00 | $10.50 | $9.00 | $9.47 |
| 0190 | Pave marking-thermo stop bar-24IN | LF A A | 76 | $10.00 | $12.00 | $10.00 | $10.53 |
| 0200 | Pave marking-thermo curv arrow | EACH A A | 3 | $120.00 | $14.00 | $120.00 | $126.32 |
| 0210 | Pave marking-thermo comb arrow | EACH A A | 3 | $140.00 | $158.00 | $140.00 | $147.37 |
| 0220 | S manhole adjust to grade | EACH A A | 1 | $1,250.00 | $682.00 | $2,693.58 | $1,399.35 |
| 0230 | Pave mark-thermo-X-walk-24 in | LF A A | 126 | $10.00 | $12.00 | $10.00 | $10.53 |
| 0240 | Demobilization | LS A A | 1 | $5,150.00 | $4,969.50 | $6,800.00 | $7,400.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of September 25, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.