KYTC contract 25-2339 bid tabulation
JPC PAVEMENT JACKSON - CAMPTON ROAD (KY 15). Let by Kentucky Transportation Cabinet on September 25, 2025. 4 bids received; low bid $465,530 by Bluegrass Contracting Corporation, -2.6% against the engineer's estimate of $477,727.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 25 SEP 2025
- Pay items
- 22
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Bluegrass Contracting Corporation | $465,530 | Low | -3.0% |
| 2 | Mountain Enterprises Inc | $476,926 | +2.0% | 0.0% |
| 3 | The Harper Company DBA the W L Harper Co | $586,245 | +26% | +23% |
| 4 | Hinkle Construction Services LLC | $787,816 | +69% | +65% |
Engineer's estimate: $477,727.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Bluegrass Contracting Corporation | 2. Mountain Enterprises Inc | 3. The Harper Company DBA the W L Harper Co | 4. Hinkle Construction Services LLC |
|---|---|---|---|---|---|---|---|
| 0010 | Dga base | TON A A | 150 | $44.00 | $49.75 | $70.45 | $83.20 |
| 0020 | CL2 asph surf 0.38D PG64-22 | TON A A | 370 | $260.00 | $228.85 | $228.85 | $240.89 |
| 0030 | Barricade-type III | EACH A A | 10 | $181.00 | $159.70 | $150.00 | $167.37 |
| 0040 | JPC pavement-11 in/24 | SQYD A A | 1,560 | $163.00 | $167.75 | $194.44 | $252.61 |
| 0050 | Remove pavement | SQYD A A | 1,822 | $22.50 | $13.85 | $31.72 | $15.62 |
| 0060 | Temporary signs | SQFT A A | 400 | $14.50 | $12.85 | $12.00 | $13.39 |
| 0070 | Fabric-geotextile class 2 | SQYD A A | 1,560 | $2.00 | $2.00 | $2.71 | $3.95 |
| 0080 | Maintain & control traffic | LS A A | 1 | $12,800 | $28,750 | $48,775 | $119,293 |
| 0090 | Portable changeable message sign | EACH A A | 3 | $850.00 | $845.00 | $833.70 | $781.05 |
| 0100 | Staking | LS A A | 1 | $2,850.00 | $5,750.00 | $21,652 | $7,849.51 |
| 0110 | Arrow panel | EACH A A | 2 | $575.00 | $625.00 | $282.87 | $530.00 |
| 0120 | Pave striping-dur TY 1-6 in W | LF A A | 500 | $12.00 | $10.00 | $10.00 | $10.53 |
| 0130 | Pave striping-dur TY 1-6 in Y | LF A A | 400 | $11.50 | $10.00 | $10.00 | $10.53 |
| 0140 | Pave marking-thermo X-walk-6 in | LF A A | 130 | $9.00 | $8.00 | $8.00 | $8.42 |
| 0150 | Pave marking-thermo stop bar-24IN | LF A A | 30 | $13.50 | $12.00 | $12.00 | $12.63 |
| 0160 | Pave marking-thermo curv arrow | EACH A A | 3 | $140.00 | $125.00 | $125.00 | $131.58 |
| 0170 | Shoulder rumble strips-sawed | LF A A | 550 | $13.00 | $7.50 | $10.00 | $10.53 |
| 0180 | Pave marking-thermo yield bar-36 in | LF A A | 20 | $68.00 | $60.00 | $60.00 | $63.16 |
| 0190 | Asphalt/concrete lap joint | LF A A | 80 | $40.00 | $265.50 | $186.92 | $1,054.99 |
| 0200 | Install radar presence detector type A | EACH A A | 1 | $5,250.00 | $4,632.00 | $4,632.00 | $4,875.79 |
| 0210 | Electronic delivery MGMT system - agg | LS A A | 1 | $570.00 | $600.00 | $1.00 | $263.16 |
| 0220 | Demobilization | LS A A | 1 | $7,250.00 | $7,150.00 | $8,800.00 | $12,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of September 25, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.