KYTC contract 25-2349 bid tabulation
JPC PAVEMENT SEATON AVENUE (US 23). Let by Kentucky Transportation Cabinet on October 23, 2025. 5 bids received; low bid $1,482,504 by Allard Excavation LLC, -0.3% against the engineer's estimate of $1,486,705.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 23 OCT 2025
- Pay items
- 33
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Allard Excavation LLC | $1,482,504 | Low | 0.0% |
| 2 | Bluegrass Contracting Corporation | $1,499,225 | +1.0% | +1.0% |
| 3 | Mountain Enterprises Inc | $1,574,700 | +6.0% | +6.0% |
| 4 | Hinkle Construction Services LLC | $2,031,806 | +37% | +37% |
| 5 | The Harper Company DBA the W L Harper Co | $2,254,213 | +52% | +52% |
Engineer's estimate: $1,486,705.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Allard Excavation LLC | 2. Bluegrass Contracting Corporation | 3. Mountain Enterprises Inc | 4. Hinkle Construction Services LLC | 5. The Harper Company DBA the W L Harper Co |
|---|---|---|---|---|---|---|---|---|
| 0010 | Crushed aggregate size no 2 | TON A A | 25 | $70.00 | $45.00 | $62.25 | $100.00 | $103.34 |
| 0020 | Asphalt material for tack | TON A A | 1.50 | $650.00 | $720.00 | $650.00 | $685.00 | $650.00 |
| 0030 | CL3 asph surf 0.38B PG64-22 | TON A A | 75 | $449.00 | $497.00 | $448.50 | $470.00 | $448.50 |
| 0040 | JPC pavement-10 in | SQYD A A | 7,156 | $150.00 | $155.50 | $160.75 | $213.00 | $235.69 |
| 0050 | Remove pavement | SQYD A A | 7,156 | $12.00 | $13.75 | $11.40 | $15.00 | $28.55 |
| 0060 | Temporary signs | SQFT A A | 344 | $15.00 | $14.00 | $17.75 | $13.40 | $12.00 |
| 0070 | Fabric-geotextile class 1 | SQYD A A | 100 | $2.50 | $2.00 | $2.50 | $3.50 | $11.95 |
| 0080 | Maintain & control traffic | LS A A | 1 | $54,000 | $25,000 | $82,250 | $114,000 | $71,190 |
| 0090 | Portable changeable message sign | EACH A A | 3 | $850.00 | $1,650.00 | $1,875.00 | $1,950.00 | $2,064.66 |
| 0100 | Mobilization for mill & text | LS A A | 1 | $6,000.00 | $5,300.00 | $4,775.00 | $5,025.00 | $4,775.00 |
| 0110 | Asphalt pave milling & texturing | TON A A | 75 | $300.00 | $325.00 | $295.50 | $310.00 | $295.50 |
| 0120 | Staking | LS A A | 1 | $22,000 | $25,725 | $10,500 | $18,880 | $50,764 |
| 0130 | Arrow panel | EACH A A | 2 | $600.00 | $1,125.00 | $1,400.00 | $660.00 | $1,401.02 |
| 0135 | Temp relocation of signal head | EACH A A | 24 | $1,478.00 | $275.00 | $1,476.94 | $1,585.00 | $250.00 |
| 0140 | Pave striping-temp rem tape-B | LF A A | 1,500 | $2.90 | $4.00 | $3.50 | $3.70 | $5.50 |
| 0150 | Pave striping-temp rem tape-W | LF A A | 1,500 | $1.45 | $3.10 | $2.75 | $2.90 | $4.75 |
| 0160 | Pave striping-temp rem tape-Y | LF A A | 1,500 | $1.50 | $3.10 | $2.75 | $2.90 | $4.75 |
| 0170 | Pave striping-dur TY 1-6 in W | LF A A | 2,300 | $8.50 | $9.50 | $8.50 | $9.00 | $8.50 |
| 0180 | Pave striping-dur TY 1-6 in Y | LF A A | 3,200 | $8.50 | $9.50 | $8.50 | $9.00 | $8.50 |
| 0190 | Pave marking-thermo STR arrow | EACH A A | 1 | $115.00 | $130.00 | $115.00 | $120.00 | $115.00 |
| 0200 | Pave marking-thermo curv arrow | EACH A A | 3 | $125.00 | $140.00 | $125.00 | $130.00 | $125.00 |
| 0210 | Pave marking-thermo comb arrow | EACH A A | 1 | $150.00 | $165.00 | $150.00 | $160.00 | $150.00 |
| 0220 | Inlaid pavement marker-MW | EACH A A | 28 | $65.00 | $72.00 | $65.00 | $68.00 | $65.00 |
| 0230 | Inlaid pavement marker-by | EACH A A | 40 | $65.00 | $72.00 | $65.00 | $68.00 | $65.00 |
| 0240 | Pave mark TY 1 tape X-walk-6 in | LF A A | 372 | $10.00 | $11.00 | $10.00 | $11.00 | $10.00 |
| 0250 | Pave mark TY 1 tape cross-hatch | SQFT A A | 720 | $20.00 | $22.00 | $20.00 | $21.00 | $20.00 |
| 0260 | Pave mark TY 1 tape dotted lane ext | LF A A | 120 | $12.00 | $13.25 | $12.00 | $13.00 | $12.00 |
| 0270 | Pave mark TY 1 tape-straight arrow | EACH A A | 3 | $275.00 | $305.00 | $275.00 | $290.00 | $275.00 |
| 0280 | Pave mark TY 1 tape stop bar-24 in | LF A A | 160 | $40.00 | $45.00 | $40.00 | $42.00 | $40.00 |
| 0290 | Pave mark TY 1 tape-curv arrow | EACH A A | 18 | $485.00 | $540.00 | $485.00 | $510.00 | $485.00 |
| 0300 | Install radar presence detector type A | EACH A A | 4 | $2,100.00 | $2,450.00 | $2,097.79 | $2,250.00 | $2,205.00 |
| 0310 | Install radar advance detector type B | EACH A A | 2 | $2,100.00 | $2,450.00 | $2,097.79 | $2,250.00 | $2,205.00 |
| 0320 | Demobilization | LS A A | 1 | $29,000 | $22,158 | $23,299 | $30,050 | $33,850 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of October 23, 2025. Compiled by Mirage Metrics.