KYTC contract 25-1101 bid tabulation
GRADE & DRAIN WITH ASPHALT SURFACE KY 191/US 460 IMPROVEMENTS. Let by Kentucky Transportation Cabinet on January 23, 2025, Morgan, District 10. 2 bids received; low bid $968,976 by Hinkle Contracting Company LLC, -7.7% against the engineer's estimate of $1,049,689.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 23 JAN 2025
- Pay items
- 119
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Hinkle Contracting Company LLC | $968,976 | Low | -8.0% |
| 2 | Bluegrass Contracting Corporation | $1,173,640 | +21% | +12% |
Engineer's estimate: $1,049,689.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Hinkle Contracting Company LLC | 2. Bluegrass Contracting Corporation |
|---|---|---|---|---|---|
| 0010 | Crushed stone base | TON A | 2,195 | $41.50 | $47.00 |
| 0020 | Asphalt seal aggregate | TON A | 5.70 | $1,000.00 | $1,125.00 |
| 0030 | Asphalt seal coat | TON A | 0.70 | $1,500.00 | $1,700.00 |
| 0040 | CL2 asph base 1.00D PG64-22 | TON A | 124 | $153.25 | $173.00 |
| 0050 | CL3 asph base 1.00D PG64-22 | TON A | 1,301 | $153.25 | $173.00 |
| 0060 | Asphalt prime coat | TON A | 2.10 | $1,200.00 | $1,350.00 |
| 0070 | CL2 asph surf 0.38D PG64-22 | TON A | 55 | $205.75 | $235.00 |
| 0080 | CL3 asph surf 0.38B PG64-22 | TON A | 313 | $156.35 | $176.50 |
| 0090 | Cem conc ent pavement-8 in | SQYD A | 248 | $125.00 | $150.00 |
| 0100 | Asphalt material for tack non-tracking | TON A | 3 | $960.00 | $1,100.00 |
| 0110 | Leveling & wedging PG64-22 | TON A | 6.40 | $275.00 | $310.00 |
| 0120 | Perforated pipe-4 in | LF A | 330 | $15.63 | $16.00 |
| 0130 | Cored hole drainage box con-4 in | EACH A | 5 | $23.06 | $565.00 |
| 0140 | Standard curb and gutter | LF A | 228 | $78.13 | $52.00 |
| 0150 | Barrier header curb | LF A | 207 | $83.33 | $65.00 |
| 0160 | Barricade-type III | EACH A | 4 | $165.63 | $215.00 |
| 0170 | Temp ditch | LF A | 944 | $3.13 | $3.00 |
| 0180 | Clean temp ditch | LF A | 472 | $3.13 | $2.50 |
| 0190 | Roadway excavation | CUYD A | 1,480 | $12.50 | $46.00 |
| 0200 | Water | MGAL A | 13 | $1.04 | $55.00 |
| 0210 | Right-of-way monument type 1 | EACH A | 8 | $156.25 | $200.00 |
| 0220 | Right-of-way monument type 1A | EACH A | 3 | $156.25 | $200.00 |
| 0230 | Witness post | EACH A | 3 | $156.25 | $200.00 |
| 0240 | Channel lining class II | TON A | 35 | $72.92 | $110.00 |
| 0250 | Clearing and grubbing | LS A | 1 | $8,333.33 | $13,250 |
| 0260 | Temporary signs | SQFT A | 216 | $20.21 | $16.75 |
| 0270 | Edge key | LF A | 24 | $54.75 | $62.00 |
| 0280 | Fabric-geotextile class 2 for pipe | SQYD A | 1,179 | $2.00 | $2.00 |
| 0290 | Maintain & control traffic | LS A | 1 | $55,000 | $52,000 |
| 0300 | Portable changeable message sign | EACH A | 4 | $6,500.00 | $4,500.00 |
| 0310 | Mobilization for mill & text | LS A | 1 | $9,850.00 | $8,500.00 |
| 0320 | Asphalt pave milling & texturing | TON A | 56.20 | $163.45 | $185.00 |
| 0330 | Temp silt fence | LF A | 944 | $3.13 | $4.00 |
| 0340 | Silt trap type A | EACH A | 1 | $156.25 | $300.00 |
| 0350 | Silt trap type B | EACH A | 1 | $156.25 | $300.00 |
| 0360 | Silt trap type C | EACH A | 1 | $156.25 | $300.00 |
| 0370 | Clean silt trap type A | EACH A | 1 | $52.08 | $75.00 |
| 0380 | Clean silt trap type B | EACH A | 1 | $52.08 | $75.00 |
| 0390 | Clean silt trap type C | EACH A | 1 | $52.08 | $75.00 |
| 0400 | Sidewalk-4 in concrete | SQYD A | 48 | $98.96 | $170.00 |
| 0410 | Staking | LS A | 1 | $36,875 | $15,000 |
| 0420 | Remove pole | EACH A | 1 | $4,611.80 | $5,000.00 |
| 0430 | Erosion control blanket | SQYD A | 1,212 | $5.21 | $10.00 |
| 0440 | Temp mulch | SQYD A | 2,895 | $0.52 | $0.45 |
| 0450 | Temp seeding and protection | SQYD A | 2,172 | $0.52 | $0.50 |
| 0460 | Initial fertilizer | TON A | 0.19 | $1,562.53 | $2,000.00 |
| 0470 | Maintenance fertilizer | TON A | 0.11 | $1,562.55 | $2,000.00 |
| 0480 | Seeding and protection | SQYD A | 2,393 | $0.94 | $3.00 |
| 0490 | Agricultural limestone | TON A | 2 | $88.54 | $95.00 |
| 0500 | Pave striping-temp paint-4 in | LF A | 6,585 | $0.31 | $0.35 |
| 0510 | Pave striping-perm paint-4 in | LF A | 4,810 | $0.31 | $0.35 |
| 0520 | Pave striping-perm paint-8 in | LF A | 455 | $0.63 | $0.70 |
| 0530 | Pave marking-thermo X-walk-6 in | LF A | 294 | $4.69 | $5.00 |
| 0540 | Pave marking-thermo stop bar-24IN | LF A | 106 | $12.50 | $13.50 |
| 0550 | Pave marking-thermo cross-hatch | SQFT A | 20 | $10.42 | $11.50 |
| 0560 | Pave marking-thermo curv arrow | EACH A | 10 | $140.63 | $150.00 |
| 0570 | Pave marking-thermo comb arrow | EACH A | 4 | $156.25 | $170.00 |
| 0580 | Pave marking-thermo only | EACH A | 2 | $312.50 | $340.00 |
| 0590 | Concrete-class A | CUYD A | 14 | $895.83 | $1,000.00 |
| 0600 | Joint adhesive | LF A | 1,301 | $2.86 | $3.50 |
| 0610 | Sawcut pavement | LF A | 1,301 | $10.42 | $4.25 |
| 0620 | Longitudinal edge key | LF A | 1,301 | $25.00 | $28.00 |
| 0630 | Water blasting existing stripe | LF A | 358 | $8.85 | $9.60 |
| 0640 | Detectable warnings | SQFT A | 44 | $52.08 | $78.00 |
| 0650 | Pipeline inspection | LF A | 247 | $2.34 | $11.00 |
| 0660 | Entrance pipe-15 in | LF A | 54 | $67.71 | $180.00 |
| 0670 | Storm sewer pipe-15 in | LF A | 59 | $64.58 | $230.00 |
| 0680 | Storm sewer pipe-18 in | LF A | 18 | $78.13 | $390.00 |
| 0690 | Storm sewer pipe-24 in | LF A | 161 | $83.33 | $275.00 |
| 0700 | Storm sewer pipe-30 in | LF A | 8 | $135.42 | $450.00 |
| 0710 | Storm sewer pipe-36 in | LF A | 40 | $312.50 | $380.00 |
| 0720 | Pipe culvert headwall-15 in | EACH A | 1 | $1,562.50 | $2,650.00 |
| 0730 | Remove pipe | LF A | 98 | $26.04 | $15.00 |
| 0740 | Curb box inlet type A | EACH A | 3 | $4,687.50 | $6,300.00 |
| 0750 | Curb box inlet type F | EACH A | 2 | $7,812.50 | $3,250.00 |
| 0760 | Drop box inlet type 1 | EACH A | 1 | $6,250.00 | $3,100.00 |
| 0770 | Drop box inlet type 2 | EACH A | 1 | $6,250.00 | $3,600.00 |
| 0780 | Remove drop box inlet | EACH A | 1 | $104.17 | $1,000.00 |
| 0790 | Remove headwall | EACH A | 1 | $520.83 | $750.00 |
| 0800 | Concrete-class A | CUYD A | 3.06 | $1,640.62 | $900.00 |
| 0810 | SBM alum sheet signs .080 in | SQFT A | 36.25 | $62.50 | $58.00 |
| 0820 | SBM alum sheet signs .125 in | SQFT A | 12.25 | $62.50 | $58.00 |
| 0830 | Steel post type 1 | LF A | 87 | $62.50 | $58.00 |
| 0840 | Remove sign | EACH A | 1 | $104.17 | $115.00 |
| 0850 | Barcode sign inventory | EACH A | 10 | $26.04 | $34.00 |
| 0860 | Remove store & reinstall | EACH A | 3 | $1,041.67 | $900.00 |
| 0870 | Fused connector kit | EACH A | 2 | $343.01 | $375.00 |
| 0880 | Conduit-1 1/4 in | LF A | 30 | $17.81 | $20.00 |
| 0890 | Trenching and backfilling | LF A | 30 | $7.77 | $8.50 |
| 0900 | Cable-no. 14/2C | LF A | 440 | $4.14 | $4.50 |
| 0910 | Cable-no. 14/5C | LF A | 435 | $4.14 | $4.50 |
| 0920 | Cable-no. 14/7C | LF A | 315 | $4.14 | $4.50 |
| 0930 | Messenger-10800 LB | LF A | 160 | $10.66 | $12.00 |
| 0940 | Install steel strain pole | EACH A | 1 | $4,069.06 | $4,400.00 |
| 0950 | Install pedestrian head-LED | EACH A | 2 | $334.36 | $365.00 |
| 0960 | Install LED signal-3 section | EACH A | 3 | $434.66 | $475.00 |
| 0970 | Install LED signal-5 section | EACH A | 4 | $434.66 | $475.00 |
| 0980 | Install pedestrian detector | EACH A | 2 | $334.36 | $365.00 |
| 0990 | Install luminaire pole | EACH A | 1 | $4,040.78 | $4,400.00 |
| 1000 | Traffic signal pole base | CUYD A | 5.10 | $1,606.83 | $1,750.00 |
| 1010 | Install pedestal post | EACH A | 1 | $1,511.58 | $1,650.00 |
| 1020 | Install | EACH A | 1 | $2,519.65 | $2,750.00 |
| 1030 | Remove signal equipment | EACH A | 1 | $4,060.03 | $4,400.00 |
| 1040 | G encasement steel open cut range 1 | LF A | 65 | $135.42 | $270.00 |
| 1050 | G pipe polyethylene/plastic 02 inch | LF A | 183 | $44.27 | $140.00 |
| 1060 | G tie-in polyethylene/plastic 02 inch | EACH A | 2 | $2,291.67 | $2,825.00 |
| 1070 | G valve polyethylene/plastic 02 inch | EACH A | 1 | $1,250.00 | $2,000.00 |
| 1080 | S bypass pumping | EACH A | 1 | $4,166.67 | $11,300 |
| 1090 | S manhole adjust to grade | EACH A | 1 | $1,562.50 | $7,700.00 |
| 1100 | S lateral locate | EACH A | 1 | $1,562.50 | $5,100.00 |
| 1110 | W encasement steel open cut range 1 | LF A | 70 | $234.38 | $270.00 |
| 1120 | W encasement steel open cut range 2 | LF A | 50 | $130.21 | $270.00 |
| 1130 | W pipe PVC 02 inch | LF A | 125 | $46.88 | $55.00 |
| 1140 | W pipe PVC 06 inch | LF A | 70 | $67.71 | $75.00 |
| 1150 | W tie-in 02 inch | EACH A | 2 | $1,562.50 | $2,825.00 |
| 1160 | W tie-in 06 inch | EACH A | 2 | $3,333.34 | $3,950.00 |
| 1170 | W valve 02 inch | EACH A | 1 | $2,604.17 | $2,825.00 |
| 1180 | W valve 06 inch | EACH A | 1 | $2,916.67 | $5,100.00 |
| 1190 | Demobilization | LS A | 1 | $14,320 | $17,349 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of January 23, 2025. Compiled by Mirage Metrics.