KYTC contract 26-1126 bid tabulation
JPC PAVEMENT I-75 NB REST AREA TRUCK PARKING EXPANSION - SCOTT. Let by Kentucky Transportation Cabinet on June 25, 2026. 4 bids received; low bid $6,819,954 by Fox Enterprises Inc, -21% against the engineer's estimate of $8,621,809.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 25 JUN 2026
- Pay items
- 99
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Fox Enterprises Inc | $6,819,954 | Low | -21% |
| 2 | The Harper Company DBA the W L Harper Co | $7,163,822 | +5.0% | -17% |
| 3 | Bluegrass Contracting Corporation | $7,840,260 | +15% | -9.0% |
| 4 | Sunesis Construction Co | $8,363,874 | +23% | -3.0% |
Engineer's estimate: $8,621,809.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Fox Enterprises Inc | 2. The Harper Company DBA the W L Harper Co | 3. Bluegrass Contracting Corporation | 4. Sunesis Construction Co |
|---|---|---|---|---|---|---|---|
| 0010 | Dga base | TON A A | 10,538 | $41.00 | $36.83 | $46.50 | $55.20 |
| 0020 | Drainage blanket-type II-asph | TON A A | 368 | $160.00 | $160.00 | $177.00 | $150.80 |
| 0030 | Asphalt seal aggregate | TON A A | 68 | $140.00 | $137.07 | $78.50 | $136.00 |
| 0040 | Asphalt seal coat | TON A A | 8 | $2,050.00 | $1,866.20 | $1,690.00 | $1,206.00 |
| 0050 | CL4 asph base 1.00D PG64-22 | TON A A | 655 | $155.00 | $155.00 | $172.00 | $115.60 |
| 0060 | CL4 asph base 1.00D PG76-22 | TON A A | 267 | $175.00 | $175.00 | $194.00 | $171.00 |
| 0070 | CL4 asph surf 0.38A PG76-22 | TON A A | 132 | $220.00 | $220.00 | $244.00 | $211.00 |
| 0080 | Asphalt curing seal | TON A A | 1.50 | $2,850.00 | $2,850.00 | $3,160.00 | $2,865.00 |
| 0090 | JPC pavement-10 in | SQYD A A | 26,742 | $114.55 | $102.09 | $114.00 | $120.00 |
| 0100 | Asphalt material for tack non-tracking | TON A A | 1 | $6,575.00 | $6,575.00 | $7,290.00 | $6,609.75 |
| 0110 | Standard integral curb | LF A A | 1,124 | $34.75 | $39.96 | $14.50 | $12.50 |
| 0120 | Remove curb | LF A A | 1,129 | $12.65 | $14.17 | $21.00 | $7.00 |
| 0130 | Delineator for G/R mono directional white | EACH A A | 5 | $10.00 | $10.00 | $11.00 | $10.00 |
| 0140 | Relocate temp conc barrier | LF A A | 1,440 | $14.50 | $14.39 | $7.75 | $9.70 |
| 0150 | Remove PCC pavement | SQYD A A | 15,119 | $14.50 | $13.52 | $14.50 | $15.00 |
| 0160 | Temp ditch | LF A A | 960 | $1.00 | $5.92 | $1.25 | $5.90 |
| 0170 | Clean temp ditch | LF A A | 960 | $0.10 | $0.25 | $0.01 | $9.00 |
| 0180 | Roadway excavation | CUYD A A | 14,561 | $21.50 | $40.76 | $46.50 | $52.00 |
| 0190 | G/R-W beam-S face TL-3 | LF A A | 25 | $33.00 | $33.00 | $36.50 | $33.00 |
| 0200 | G/R end treatment type 1 | EACH A A | 1 | $4,200.00 | $4,200.00 | $4,650.00 | $4,222.00 |
| 0210 | Remove G/R | LF A A | 50 | $1.00 | $1.00 | $1.00 | $21.00 |
| 0220 | Clearing and grubbing | LS A A | 1 | $15,000 | $22,800 | $24,300 | $22,795 |
| 0230 | Temporary signs | SQFT A A | 200 | $8.48 | $8.00 | $9.50 | $24.00 |
| 0240 | Maintain & control traffic | LS A A | 1 | $90,000 | $142,139 | $39,400 | $42,684 |
| 0250 | Portable changeable message sign | EACH A A | 4 | $3,710.00 | $4,766.45 | $5,490.00 | $4,825.00 |
| 0260 | Temp silt fence | LF A A | 1,300 | $4.00 | $2.53 | $6.75 | $3.80 |
| 0270 | Silt trap type B | EACH A A | 11 | $350.00 | $579.50 | $355.00 | $745.00 |
| 0280 | Silt trap type C | EACH A A | 11 | $325.00 | $239.51 | $626.00 | $376.00 |
| 0290 | Clean silt trap type B | EACH A A | 11 | $45.00 | $150.00 | $44.50 | $125.00 |
| 0300 | Clean silt trap type C | EACH A A | 11 | $45.00 | $150.00 | $44.50 | $112.00 |
| 0310 | Sidewalk-4 in concrete | SQYD A A | 196 | $58.77 | $67.59 | $96.00 | $103.60 |
| 0320 | Staking | LS A A | 1 | $22,500 | $164,520 | $71,700 | $42,222 |
| 0330 | Arrow panel | EACH A A | 1 | $2,517.50 | $3,234.37 | $1,760.00 | $1,910.00 |
| 0340 | Relocate crash cushion | EACH A A | 1 | $3,600.00 | $3,265.00 | $5,640.00 | $3,518.00 |
| 0350 | Conc barrier wall type 9T | LF A A | 1,440 | $35.00 | $28.77 | $39.00 | $82.00 |
| 0360 | Temp mulch | SQYD A A | 15,580 | $0.49 | $0.30 | $0.50 | $0.30 |
| 0370 | Temp seeding and protection | SQYD A A | 11,685 | $0.58 | $0.39 | $0.60 | $0.39 |
| 0380 | Initial fertilizer | TON A A | 1.20 | $1,590.00 | $1,032.00 | $1,760.00 | $1,037.00 |
| 0390 | Maintenance fertilizer | TON A A | 0.70 | $1,590.00 | $1,032.00 | $1,760.00 | $1,037.00 |
| 0400 | Seeding and protection | SQYD A A | 23,370 | $0.65 | $0.58 | $0.70 | $2.00 |
| 0410 | Agricultural limestone | TON A A | 12 | $130.00 | $98.00 | $144.00 | $98.50 |
| 0420 | SBM aluminum panel signs | SQFT A A | 8.25 | $35.00 | $35.00 | $39.00 | $35.00 |
| 0430 | SBM alum sheet signs .080 in | SQFT A A | 18 | $35.00 | $35.00 | $39.00 | $35.00 |
| 0440 | SBM alum sheet signs .125 in | SQFT A A | 292 | $35.00 | $35.00 | $39.00 | $35.00 |
| 0450 | Steel post type 1 | LF A A | 419 | $35.00 | $35.00 | $39.00 | $35.00 |
| 0460 | Class A concrete for signs | CUYD A A | 1.15 | $1,000.00 | $1,000.00 | $1,110.00 | $1,005.00 |
| 0470 | Pave striping-thermo-6 in W | LF A A | 2,666 | $2.25 | $2.25 | $2.50 | $2.00 |
| 0480 | Pave striping-thermo-6 in Y | LF A A | 1,468 | $2.25 | $2.25 | $2.50 | $2.00 |
| 0490 | Pave striping-temp rem tape-W | LF A A | 10,480 | $2.50 | $2.29 | $2.75 | $2.30 |
| 0500 | Pave striping-temp rem tape-Y | LF A A | 2,630 | $2.50 | $2.29 | $2.75 | $2.30 |
| 0510 | Pave marking-thermo X-walk-12 in | LF A A | 331 | $15.00 | $15.00 | $16.50 | $7.00 |
| 0520 | Pave marking-thermo cross-hatch | SQFT A A | 1,997 | $4.00 | $4.00 | $4.50 | $5.50 |
| 0530 | Pave marking-paint parking lot | LF A A | 10,856 | $1.00 | $1.00 | $1.00 | $1.25 |
| 0540 | Fuel adjustment | DOLL A A | 11,698 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0550 | Asphalt adjustment | DOLL A A | 5,759 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0560 | Object marker TY 3 | EACH A A | 1 | $100.00 | $100.00 | $111.00 | $100.50 |
| 0570 | Pave mark handicap symbol | EACH A A | 6 | $300.00 | $300.00 | $332.00 | $251.00 |
| 0580 | Temp crash cushion | EACH A A | 1 | $6,243.40 | $3,265.00 | $5,640.00 | $4,112.00 |
| 0590 | Retaining wall system block and cap | SQFT A A | 6,010 | $66.11 | $75.46 | $103.00 | $94.00 |
| 0600 | Longitudinal edge key | LF A A | 1,638 | $8.10 | $8.10 | $9.00 | $6.00 |
| 0610 | GMSS type D | EACH A A | 5 | $800.00 | $800.00 | $887.00 | $804.00 |
| 0620 | Barcode sign inventory | EACH A A | 35 | $25.00 | $25.00 | $27.50 | $25.00 |
| 0630 | Pave mark thermo-wrong way arrow | EACH A A | 1 | $500.00 | $500.00 | $554.00 | $452.00 |
| 0640 | Longitudinal saw cut | LF A A | 2,332 | $5.10 | $6.70 | $3.75 | $2.20 |
| 0650 | Electronic delivery MGMT system - agg | LS A A | 1 | $590.00 | $250.00 | $1,110.00 | $202.00 |
| 0660 | Rock excavation | CUYD A A | 3,640 | $63.85 | $79.36 | $77.50 | $169.00 |
| 0670 | Crushed aggregate size no 2 | TON A A | 7 | $100.00 | $391.62 | $366.00 | $248.00 |
| 0680 | Storm sewer pipe-18 in | LF A A | 209 | $100.00 | $301.55 | $266.00 | $301.00 |
| 0690 | Perforated pipe-4 in | LF A A | 1,638 | $24.00 | $13.45 | $26.50 | $39.00 |
| 0700 | Inspect & certify edge drain system | LS A A | 1 | $2,500.00 | $2,500.00 | $3,380.00 | $2,513.00 |
| 0710 | Perf pipe headwall TY 3-4 in | EACH A A | 7 | $1,875.00 | $2,081.84 | $942.00 | $988.00 |
| 0720 | Remove pipe | LF A A | 200 | $34.00 | $36.32 | $30.00 | $32.60 |
| 0730 | Curb box inlet type B | EACH A A | 3 | $7,800.00 | $8,451.28 | $9,070.00 | $10,566 |
| 0740 | Cap curb box inlet | EACH A A | 9 | $1,341.00 | $1,536.15 | $2,370.00 | $1,826.00 |
| 0750 | Flume inlet type 2 | EACH A A | 1 | $5,526.78 | $8,279.09 | $7,100.00 | $7,888.00 |
| 0760 | Remove catch basin | EACH A A | 1 | $1,650.00 | $2,039.06 | $2,070.00 | $411.00 |
| 0770 | Pole 120 FT MTG HT high mast | EACH A A | 4 | $68,100 | $68,100 | $75,500 | $68,460 |
| 0780 | Marker | EACH A A | 8 | $428.00 | $428.00 | $474.00 | $430.00 |
| 0790 | Trenching and backfilling | LF A A | 1,786 | $6.00 | $6.00 | $6.75 | $6.00 |
| 0800 | Remove lighting | LS A A | 1 | $24,425 | $24,425 | $27,100 | $24,554 |
| 0810 | Remove and replace sidewalk | SQYD A A | 15 | $84.00 | $296.27 | $152.00 | $155.00 |
| 0820 | Electrical junction box type A | EACH A A | 5 | $1,854.00 | $1,854.00 | $2,050.00 | $1,864.00 |
| 0830 | Bore and jack conduit | LF A A | 370 | $146.00 | $146.00 | $162.00 | $147.00 |
| 0840 | Pole base-high mast | CUYD A A | 35 | $2,732.00 | $2,732.00 | $3,030.00 | $2,746.00 |
| 0850 | High mast LED luminaire | EACH A A | 22 | $1,723.00 | $1,723.00 | $1,910.00 | $1,732.00 |
| 0860 | Cable-no. 10/3C ducted | LF A A | 3,640 | $7.20 | $7.20 | $8.00 | $7.20 |
| 0870 | PVC conduit-3 in-schedule 80 | LF A A | 370 | $15.00 | $15.00 | $16.50 | $15.00 |
| 0880 | Pole 120 FT MTG HT high mast | EACH A A | 3 | $68,100 | $68,100 | $75,500 | $68,997 |
| 0890 | Marker | EACH A A | 8 | $428.00 | $428.00 | $474.00 | $430.00 |
| 0900 | Trenching and backfilling | LF A A | 2,115 | $6.00 | $6.00 | $6.75 | $6.00 |
| 0910 | Remove lighting | LS A A | 1 | $20,888 | $20,888 | $23,100 | $20,998 |
| 0920 | Electrical junction box type A | EACH A A | 6 | $1,854.00 | $1,854.00 | $2,050.00 | $1,864.00 |
| 0930 | Bore and jack conduit | LF A A | 95 | $146.00 | $146.00 | $162.00 | $147.00 |
| 0940 | Pole base-high mast | CUYD A A | 27 | $2,732.00 | $2,732.00 | $3,030.00 | $2,746.00 |
| 0950 | High mast LED luminaire | EACH A A | 22 | $1,723.00 | $1,723.00 | $1,910.00 | $1,732.00 |
| 0960 | Cable-no. 10/3C ducted | LF A A | 2,960 | $7.20 | $7.20 | $8.00 | $7.24 |
| 0970 | PVC conduit-3 in-schedule 80 | LF A A | 95 | $15.00 | $15.00 | $16.50 | $15.00 |
| 0980 | Mobilization | LS A A | 1 | $235,000 | $330,000 | $367,000 | $351,799 |
| 0990 | Demobilization | LS A A | 1 | $97,315 | $105,000 | $110,201 | $126,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of June 25, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way