Sunesis Construction Co: KYTC bid record

Sunesis Construction Co submitted 23 bids on Kentucky Transportation Cabinet contracts in the data, from 22 NOV 2019 to 25 JUN 2026, and was the low bidder on 6 of them (26%). When it was not low, its total sat a median +21% above the low bid.

Owner
Kentucky Transportation Cabinet
Low bid volume
$33,691,896
Latest bid
25 JUN 2026
Data through
22 OCT 2026
23Bids
6Low bids
26Win rate, percent
+21%Median gap to the low bid when not low, 15 bids

By year

YearBidsLow bidsWin rate
201911100%
2020300%
20215360%
202211100%
2023400%
20246117%
2025200%
2026100%
Sunesis Construction Co, KYTC: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 619632%
District 9100%
Sunesis Construction Co, KYTC: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Concrete-class ACY2512 (48%)$1,278.82$1,088.01
Concrete sealingSF1612 (75%)$2.25$3.00
Portable changeable message signEACH1711 (65%)$1,980.00$1,750.00
Guardrail-steel W beam-S faceLF128 (67%)$33.62$38.00
Delineator for guardrail BI directional whiteEACH127 (58%)$10.00$14.19
Guardrail end treatment type 1EACH107 (70%)$2,906.81$3,800.00
Perforated pipe-4 inLF107 (70%)$16.91$15.00
Pre-drilling for pilesLF106 (60%)$259.69$388.51
Fuel adjustmentDOL66 (100%)$1.00$1.00
Fabric-geotextile class 2 for pipeSY66 (100%)$2.00$2.00
Concrete-class AACY145 (36%)$1,346.34$1,716.02
Pipe culvert headwall-18 inEACH75 (71%)$1,674.64$1,925.00
Sunesis Construction Co, KYTC: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Sunesis Construction Co, KYTC: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
25 JUN 202626-1126JPC PAVEMENT I-75 NB REST AREA TRUCK PARKING EXPANSION - SCOTT4 of 4$8,363,874+23%
23 OCT 202525-4206GRADE & DRAIN WITH ASPHALT SURFACE ALEXANDRIA PIKE (US 27)3 of 3$953,126+21%
25 SEP 202525-1028GRADE & DRAIN WITH ASPHALT SURFACE BRISTOW ROAD (KY-536)5 of 5$35,883,484+25%
14 NOV 202424-5368District 6BRIDGE REPLACEMENT CR 10211 of 1$3,471,672Low
24 OCT 202424-2997District 6BRIDGE DECK RESTORATION & WATERPROOFING MARY INGLES HIGHWAY (KY 8) AND SANTA FE ROAD (KY 539)5 of 5$1,374,172+241%
22 AUG 202424-2952District 6BRIDGE REPLACEMENT ELLISTON-MT. ZION ROAD (KY 1942)7 of 7$3,403,315+277%
18 JUL 202424-5358District 6BRIDGE REPLACEMENT KY 4917 of 8$913,088+26%
22 FEB 202424-1305District 6GRADE & DRAIN WITH ASPHALT SURFACE MOUNT ZION ROAD (KY 536)3 of 4$35,954,389+17%
25 JAN 202424-2976District 6BRIDGE REPAIR MISCELLANEOUS WORK CLAY WADE BAILEY BRIDGE (US 25, US 42 AND US 127)2 of 2$2,947,505+2.0%
14 DEC 202323-2909District 6BRIDGE REPAIR MISCELLANEOUS WORK CLAY WADE BAILEY BRIDGE (US 25, US 42 AND US 127)2 of 2$3,138,935+13%
28 SEP 202323-2980District 6BRIDGE REPLACEMENT LIKING PIKE (KY 915)5 of 5$511,054+40%
28 SEP 202323-1337District 6GRADE & DRAIN WITH ASPHALT SURFACE HOUSTON ROAD (CS 3000)4 of 5$3,854,737+30%
24 AUG 202323-2988District 6BRIDGE SUPERSTRUCTURE REPLACEMENT JOHNSVILLE FOSTER ROAD (KY 1951)2 of 5$530,143+9.0%
18 AUG 202222-1334District 6GRADE & DRAIN ALEXANDRIA PIKE (US 27)1 of 4$434,391Low, 9.0% under the second
19 NOV 202121-1349District 6JPC PAVEMENT WITH GRADE & DRAIN I-75/I-711 of 2$8,781,411Low, 23% under the second
24 SEP 202121-1334District 6JPC PAVEMENT WITH GRADE & DRAIN I-75/I-711 of 2$9,960,007Low, 35% under the second
23 JUL 202121-5206District 6BRIDGE SUPERSTRUCTURE REPLACEMENT KY 82 of 2$2,266,477+6.0%
23 APR 202121-1315District 9BRIDGE REPLACEMENT GERMANTOWN ROAD (KY 3056)6 of 6$1,088,285+95%
19 MAR 202121-1311District 6BRIDGE WITH GRADE, DRAIN & SURFACE US 421 of 1$3,347,737Low
23 OCT 202020-1317District 6BRIDGE WITH GRADE, DRAIN & SURFACE WEST 11TH STREET (KY 1120)5 of 5$1,612,118+107%
25 SEP 202020-1312District 6GRADE, DRAIN & SURFACE WITH BRIDGE BROMLEY-CRESCENT SPRINGS ROAD (KY 2373)2 of 6$7,896,297+5.0%
21 FEB 202020-5155District 6BRIDGE REPLACEMENT KY 22382 of 3$1,078,540+9.0%
22 NOV 201919-5152District 6ASPHALT REHAB WITH BRIDGE (S) KY-221 of 2$7,696,678Low, 18% under the second
Sunesis Construction Co: latest KYTC bids in the data

How this record was read

KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; KYTC's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy