KYTC contract 25-4206 bid tabulation
GRADE & DRAIN WITH ASPHALT SURFACE ALEXANDRIA PIKE (US 27). Let by Kentucky Transportation Cabinet on October 23, 2025. 3 bids received; low bid $786,434 by Eaton Asphalt Paving Co Inc, -18% against the engineer's estimate of $954,676.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 23 OCT 2025
- Pay items
- 91
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Eaton Asphalt Paving Co Inc | $786,434 | Low | -18% |
| 2 | Riegler Blacktop Inc | $883,495 | +12% | -7.0% |
| 3 | Sunesis Construction Co | $953,126 | +21% | 0.0% |
Engineer's estimate: $954,676.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Eaton Asphalt Paving Co Inc | 2. Riegler Blacktop Inc | 3. Sunesis Construction Co |
|---|---|---|---|---|---|---|
| 0010 | Crushed stone base | TON A A | 1,231 | $54.25 | $46.25 | $59.04 |
| 0020 | Geogrid reinforcement for subgrade | SQYD A A | 2,057 | $3.90 | $5.00 | $2.70 |
| 0030 | Asphalt seal aggregate | TON A A | 14 | $526.50 | $270.00 | $272.02 |
| 0040 | Asphalt seal coat | TON A A | 2 | $1,400.00 | $2,200.00 | $2,216.42 |
| 0050 | Leveling & wedging PG64-22 | TON A A | 20 | $475.00 | $190.00 | $191.42 |
| 0060 | CL3 asph base 1.00D PG64-22 | TON A A | 813 | $128.00 | $118.00 | $119.10 |
| 0070 | Asphalt material for tack | TON A A | 3.70 | $1.00 | $1.00 | $1.01 |
| 0080 | CL3 asph surf 0.38B PG64-22 | TON A A | 237 | $198.00 | $190.00 | $193.25 |
| 0090 | Mobilization for mill & text | LS A A | 1 | $3,950.00 | $8,500.00 | $8,563.43 |
| 0100 | Asphalt pave milling & texturing | TON A A | 94 | $106.00 | $20.00 | $20.15 |
| 0110 | Joint adhesive | LF A A | 2,991 | $1.20 | $0.50 | $0.50 |
| 0120 | Longitudinal edge key | LF A A | 1,533 | $6.55 | $5.00 | $5.04 |
| 0130 | Storm sewer pipe-18 in | LF A A | 399 | $78.00 | $110.00 | $136.25 |
| 0140 | Storm sewer pipe-24 in | LF A A | 8 | $422.00 | $200.00 | $581.18 |
| 0150 | Non-perforated pipe-4 in | LF A A | 6 | $225.00 | $100.00 | $85.75 |
| 0160 | Drop box inlet type 5D | EACH A A | 3 | $4,765.00 | $9,500.00 | $11,528 |
| 0170 | Remove drop box inlet | EACH A A | 1 | $1,225.00 | $500.00 | $585.45 |
| 0180 | Standard header curb | LF A A | 240 | $47.50 | $120.00 | $59.60 |
| 0190 | Standard barrier median type 2 | SQYD A A | 437 | $139.50 | $130.00 | $178.56 |
| 0200 | Standard barrier median type 3 | SQYD A A | 90 | $140.75 | $210.00 | $182.27 |
| 0210 | Standard barrier median type 4 | SQYD A A | 182 | $153.00 | $140.00 | $182.04 |
| 0220 | Delineator for guardrail mono directional white | EACH A A | 5 | $20.00 | $15.00 | $20.15 |
| 0230 | Barricade-type III | EACH A A | 4 | $168.50 | $90.00 | $281.77 |
| 0240 | Temp ditch | LF A A | 553 | $7.50 | $2.00 | $7.44 |
| 0250 | Clean temp ditch | LF A A | 276 | $5.50 | $2.00 | $11.44 |
| 0260 | Roadway excavation | CUYD A A | 2,217 | $47.00 | $35.00 | $51.65 |
| 0270 | Ditching | LF A A | 250 | $13.50 | $10.00 | $8.23 |
| 0280 | Guardrail-steel W beam-S face | LF A A | 350 | $31.00 | $48.50 | $31.23 |
| 0290 | Guardrail end treatment type 1 | EACH A A | 1 | $5,000.00 | $4,200.00 | $5,037.31 |
| 0300 | Remove guardrail | LF A A | 205 | $2.00 | $5.00 | $2.01 |
| 0310 | Channel lining class II | TON A A | 350 | $113.00 | $387.00 | $109.96 |
| 0320 | Clearing and grubbing | LS A A | 1 | $3,500.00 | $20,000 | $11,533 |
| 0330 | Temporary signs | SQFT A A | 600 | $5.00 | $10.25 | $6.94 |
| 0340 | Fabric-geotextile class 1 | SQYD A A | 450 | $3.25 | $2.00 | $2.04 |
| 0350 | Fabric-geotextile class 2 for pipe | SQYD A A | 699 | $2.00 | $2.00 | $2.00 |
| 0360 | Maintain & control traffic | LS A A | 1 | $17,150 | $14,000 | $65,350 |
| 0370 | Lane closure | EACH A A | 3 | $1,950.00 | $1,000.00 | $5,922.30 |
| 0380 | Truck mounted attenuator | EACH A A | 1 | $12,750 | $9,000.00 | $4,029.85 |
| 0390 | Portable changeable message sign | EACH A A | 4 | $1,150.00 | $3,700.00 | $3,779.88 |
| 0400 | Edgeline rumble strips | LF A A | 1,079 | $4.60 | $4.60 | $6.04 |
| 0410 | Temp silt fence | LF A A | 553 | $4.85 | $8.00 | $3.25 |
| 0420 | Silt trap type A | EACH A A | 1 | $202.00 | $175.00 | $1,304.18 |
| 0430 | Silt trap type B | EACH A A | 1 | $202.00 | $175.00 | $817.36 |
| 0440 | Silt trap type C | EACH A A | 3 | $220.00 | $175.00 | $506.42 |
| 0450 | Clean silt trap type A | EACH A A | 1 | $130.00 | $40.00 | $278.12 |
| 0460 | Clean silt trap type B | EACH A A | 1 | $130.00 | $40.00 | $491.32 |
| 0470 | Clean silt trap type C | EACH A A | 3 | $130.00 | $40.00 | $326.05 |
| 0480 | Staking | LS A A | 1 | $14,395 | $5,000.00 | $27,705 |
| 0490 | Arrow panel | EACH A A | 2 | $200.00 | $2,000.00 | $1,635.36 |
| 0500 | Tubular markers | EACH A A | 12 | $425.00 | $400.00 | $125.30 |
| 0510 | Erosion control blanket | SQYD A A | 2,500 | $2.45 | $2.45 | $3.27 |
| 0520 | Temp mulch | SQYD A A | 3,467 | $0.40 | $0.40 | $0.40 |
| 0530 | Temp seeding and protection | SQYD A A | 2,600 | $0.43 | $0.43 | $0.92 |
| 0540 | Initial fertilizer | TON A A | 0.30 | $1,900.00 | $1,900.00 | $1,914.17 |
| 0550 | Maintenance fertilizer | TON A A | 0.20 | $1,900.00 | $1,900.00 | $1,914.20 |
| 0560 | Seeding and protection | SQYD A A | 2,700 | $1.05 | $1.05 | $1.06 |
| 0570 | Agricultural limestone | TON A A | 3 | $165.00 | $165.00 | $166.23 |
| 0580 | Pave striping-thermo-6 in W | LF A A | 5,816 | $1.15 | $1.15 | $1.72 |
| 0590 | Pave striping-thermo-6 in Y | LF A A | 2,957 | $1.15 | $1.15 | $1.74 |
| 0600 | Pave striping-thermo-12 in W | LF A A | 122 | $4.00 | $4.00 | $7.96 |
| 0610 | Pave striping-temp rem tape-B | LF A A | 210 | $3.50 | $3.50 | $3.07 |
| 0620 | Pave striping-temp rem tape-W | LF A A | 1,350 | $2.65 | $2.65 | $2.74 |
| 0630 | Pave striping-temp rem tape-Y | LF A A | 5,875 | $2.65 | $2.65 | $2.71 |
| 0640 | Pave striping-dur TY 1-6 in W | LF A A | 596 | $10.00 | $10.00 | $10.28 |
| 0650 | Pave striping-dur TY 1-6 in Y | LF A A | 216 | $10.00 | $10.00 | $10.28 |
| 0660 | Pave marking-thermo stop bar-24IN | LF A A | 56 | $13.00 | $13.00 | $5.89 |
| 0670 | Pave marking-thermo cross-hatch | SQFT A A | 346 | $4.00 | $4.00 | $5.54 |
| 0680 | Pave marking-thermo curv arrow | EACH A A | 12 | $125.00 | $125.00 | $302.24 |
| 0690 | Pave marking-thermo only | EACH A A | 1 | $400.00 | $400.00 | $352.61 |
| 0700 | Concrete-class A | CUYD A A | 2 | $675.00 | $750.00 | $1,346.55 |
| 0710 | Remove and reset perf pipe headwall | EACH A A | 1 | $725.00 | $500.00 | $246.38 |
| 0720 | Water blasting existing stripe | LF A A | 350 | $6.00 | $6.00 | $9.17 |
| 0730 | Pave mark TY 1 tape dotted lane ext | LF A A | 4 | $4.00 | $4.00 | $10.28 |
| 0740 | Pave mark TY 1 tape-curv arrow | EACH A A | 1 | $500.00 | $500.00 | $705.22 |
| 0750 | Pave mark TY 1 tape-curv arrow | EACH A A | 1 | $800.00 | $800.00 | $1,052.80 |
| 0760 | Pave mark thermo chevron | SQFT A A | 103 | $4.00 | $4.00 | $5.54 |
| 0770 | Pave marking-thermo dotted lane exten | LF A A | 106 | $12.00 | $12.00 | $6.95 |
| 0780 | Pave marking-thermo dotted lane exten | LF A A | 103 | $8.00 | $8.00 | $6.95 |
| 0790 | Pave marking-thermo U-turn | EACH A A | 11 | $500.00 | $500.00 | $402.98 |
| 0800 | Thrie beam guardrail transition TL-3 | EACH A A | 1 | $3,500.00 | $4,100.00 | $3,526.12 |
| 0810 | Pave mark TY 1 tape chevron | SQFT A A | 45 | $25.00 | $25.00 | $20.15 |
| 0820 | Electronic delivery MGMT system - agg | LS A A | 1 | $0.01 | $1.00 | $151.12 |
| 0830 | SBM alum sheet signs .125 in | SQFT A A | 54 | $35.00 | $40.00 | $42.99 |
| 0840 | Steel post type 1 | LF A A | 155 | $25.00 | $40.00 | $31.44 |
| 0850 | Class A concrete for signs | CUYD A A | 1 | $1,000.00 | $2,000.00 | $2,699.46 |
| 0860 | Remove & relocate signs | EACH A A | 4 | $1,000.00 | $500.00 | $251.78 |
| 0870 | Remove sign | EACH A A | 6 | $100.00 | $200.00 | $42.45 |
| 0880 | GMSS type D | EACH A A | 1 | $1,000.00 | $1,200.00 | $708.84 |
| 0890 | GMSS type D | EACH A A | 3 | $700.00 | $700.00 | $827.62 |
| 0900 | Barcode sign inventory | EACH A A | 25 | $20.00 | $50.00 | $42.24 |
| 0910 | Demobilization | LS A A | 1 | $11,800 | $13,100 | $15,932 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of October 23, 2025. Compiled by Mirage Metrics.