KYTC contract 25-1028 bid tabulation

GRADE & DRAIN WITH ASPHALT SURFACE BRISTOW ROAD (KY-536). Let by Kentucky Transportation Cabinet on September 25, 2025. 5 bids received; low bid $28,773,411 by Eaton Asphalt Paving Co Inc, -0.3% against the engineer's estimate of $28,861,954.

Owner
Kentucky Transportation Cabinet
Letting
25 SEP 2025
Pay items
225
Data through
22 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Eaton Asphalt Paving Co Inc$28,773,411Low0.0%
2Riegler Blacktop Inc$28,777,2480.0%0.0%
3Louisville Paving Company Inc$31,985,000+11%+11%
4Prus Construction Company$34,421,095+20%+19%
5Sunesis Construction Co$35,883,484+25%+24%
KYTC contract 25-1028: bids by rank

Engineer's estimate: $28,861,954.

Bid tabulation

LinePay itemUnitQuantity1. Eaton Asphalt Paving Co Inc2. Riegler Blacktop Inc3. Louisville Paving Company Inc4. Prus Construction Company5. Sunesis Construction Co
0010Dga baseTON A A32,059$39.10$42.25$45.00$43.00$56.67
0020Lime stabilized roadbedSQYD A A74,312$8.55$8.50$8.50$7.50$8.55
0030LimeTON A A1,404$255.00$255.00$255.00$230.00$256.37
0040Drainage blanket-type II-asphTON A A14,862$83.65$80.00$80.00$88.00$80.88
0050Traffic bound baseTON A A17$210.00$50.00$67.03$160.00$518.29
0060Asphalt seal aggregateTON A A24$381.00$135.00$135.00$148.50$135.72
0070Asphalt seal coatTON A A3$1,393.00$1,250.00$1,250.00$1,375.00$1,256.70
0080Leveling & wedging PG64-22TON A A83$171.50$101.50$103.00$113.50$103.55
0090CL3 asph base 1.00D PG64-22TON A A24,436$83.25$83.75$83.75$92.00$84.39
0100CL3 asph base 1.00D PG76-22TON A A1,993$102.25$90.00$90.00$99.00$90.48
0110CL2 asph base 0.75D PG64-22TON A A3,085$95.35$87.00$87.00$96.00$87.47
0120CL2 asph surf 0.38D PG64-22TON A A1,784$126.00$92.50$92.50$102.00$95.82
0130Asphalt material for tackTON A A82$1.00$885.00$885.00$975.00$889.75
0140Asphalt curing sealTON A A133$835.00$865.00$865.00$715.00$869.64
0150CL3 asph surf 0.38B PG76-22TON A A997$135.60$110.00$112.60$125.00$113.20
0160CL3 asph surf 0.38B PG64-22TON A A6,372$118.00$103.00$103.00$115.00$105.13
0170JPC pavement-8 inSQYD A A1,487$101.00$117.00$117.00$128.00$130.56
0180Asphalt pave milling & texturingTON A A1,594$19.00$22.00$22.00$24.25$22.12
0190Sand for blotterTON A A186$20.00$50.00$50.00$55.00$50.27
0200Stamped concreteSQYD A A952$215.00$235.00$235.00$220.00$259.50
0210Crushed aggregate size no 2TON A A12$185.00$125.00$125.00$140.00$81.18
0220Entrance pipe-15 inLF A A45$125.00$72.00$105.83$86.00$76.47
0230Perforated pipe-4 inLF A A19,588$8.25$9.40$9.40$9.00$13.89
0240Perforated pipe-6 inLF A A5,899$9.20$11.00$11.00$11.18$13.62
0250Non-perforated pipe-4 inLF A A120$42.50$26.00$26.00$21.00$43.35
0260Inspect & certify edge drain systemLS A A1$10,000$10,000$19,900$11,000$10,054
0270Perf pipe headwall TY 1-4 inEACH A A9$1,480.00$700.00$700.00$975.00$849.97
0280Perf pipe headwall TY 3-4 inEACH A A2$1,828.00$750.00$750.00$975.00$925.02
0290Perf pipe headwall TY 4-4 inEACH A A1$1,713.00$750.00$750.00$975.00$963.27
0300Remove pipeLF A A190$16.00$60.00$57.16$65.00$18.48
0310Cored hole drainage box con-4 inEACH A A168$83.00$250.00$250.00$250.00$139.48
0320Cored hole drainage box con-6 inEACH A A19$83.00$275.00$275.00$250.00$166.07
0330Standard curb and gutterLF A A37,382$27.85$28.00$28.50$34.75$30.61
0340Island curb and gutterLF A A3,378$34.25$33.50$33.50$42.50$33.68
0350Standard integral curbLF A A680$34.80$35.00$35.00$28.75$38.32
0360Island integral curbLF A A303$39.50$70.00$70.00$32.50$73.43
0370Standard header curbLF A A384$49.50$55.00$55.00$51.00$58.11
0380Island header curb type 2LF A A790$44.75$32.00$32.00$39.50$53.67
0390Delineator for guardrail mono directional whiteEACH A A89$13.00$15.12$15.12$17.00$20.11
0400Curb to barrier wall transEACH A A2$8,600.00$6,500.00$6,500.00$9,000.00$6,534.86
0410Barricade-type IIIEACH A A5$200.00$240.00$100.00$450.00$196.05
0420Cement concrete islandSQYD A A196$165.00$175.00$175.00$200.00$198.64
0430Remove pavementSQYD A A1,173$10.00$15.00$9.38$17.50$17.19
0440Cem conc ent pavement-8 inSQYD A A188$196.00$180.00$180.00$123.00$308.15
0450Paved ditch type 1SQYD A A6$525.00$750.00$750.00$900.00$800.36
0460Temp ditchLF A A5,690$6.25$1.50$1.81$1.85$4.88
0470Clean temp ditchLF A A2,845$4.85$1.50$1.81$1.35$9.86
0480Roadway excavationCUYD A A428,430$9.95$12.65$16.50$22.25$23.07
0490WaterMGAL A A1,000$3.80$1.00$0.01$1.00$13.23
0500Guardrail-steel W beam-S faceLF A A5,100$29.50$32.61$32.61$36.00$30.16
0510Guardrail end treatment type 1EACH A A7$3,900.00$3,476.20$3,476.20$3,825.00$4,524.14
0520Guardrail end treatment type 2MEACH A A8$2,200.00$1,869.47$1,869.47$2,050.00$2,010.73
0530Guardrail end treatment type 3EACH A A1$2,500.00$1,390.96$1,390.96$1,550.00$3,016.09
0540Remove guardrailLF A A200$5.00$4.31$4.31$4.75$19.32
0550Remove guardrail end treatmentEACH A A2$850.00$922.67$922.67$1,015.00$1,201.55
0560Right-of-way monument type 1EACH A A113$150.00$180.24$180.24$195.00$1,135.70
0570Witness postEACH A A113$150.00$131.37$131.37$195.00$150.80
0580Channel lining class IATON A A517$87.50$110.00$142.69$125.00$87.10
0590Channel lining class IITON A A1,967$72.75$75.00$70.14$105.00$87.15
0600Channel lining class IIITON A A368$87.30$90.00$77.49$110.00$103.12
0610Clearing and grubbingLS A A1$265,000$260,000$289,426$165,000$189,752
0620Temporary signsSQFT A A300$5.00$15.00$6.00$11.00$10.05
0630Edge keyLF A A347$16.00$10.00$10.00$11.00$10.05
0640Fabric-geotextile class 2SQYD A A14,775$1.85$2.00$0.70$1.80$1.41
0650Remove headwallEACH A A2$835.00$150.00$1,020.37$335.00$251.08
0660Maintain & control trafficLS A A1$267,745$175,000$602,709$300,000$200,366
0670Diversions (by-pass detours)LS A A1$13,700$20,000$15,942$80,000$19,710
0680Diversions (by-pass detours)LS A A1$6,900.00$20,000$20,843$37,500$19,710
0690Portable changeable message signEACH A A8$1,350.00$12,000$16,180$23,100$22,591
0700Mobilization for mill & textLS A A1$4,550.00$6,500.00$6,500.00$7,150.00$6,534.86
0710SafeloadingCUYD A A5$695.00$275.00$322.37$625.00$298.48
0720Temp silt fenceLF A A5,690$4.50$1.88$2.00$2.00$1.89
0730Silt trap type AEACH A A57$315.00$200.00$0.01$400.00$1,146.55
0740Silt trap type BEACH A A57$346.00$200.00$577.83$575.00$734.39
0750Silt trap type CEACH A A57$430.00$200.00$293.28$230.00$444.24
0760Clean silt trap type AEACH A A57$5.00$50.00$0.01$36.00$245.19
0770Clean silt trap type BEACH A A57$5.00$50.00$0.01$36.00$447.75
0780Clean silt trap type CEACH A A57$5.00$50.00$0.01$36.00$286.64
0790Sidewalk-4 in concreteSQYD A A420$92.00$115.50$115.50$103.00$137.30
0800StakingLS A A1$367,291$125,000$127,562$175,000$376,609
0810Arrow panelEACH A A4$225.00$4,300.00$10,787$5,500.00$5,373.32
0820Erosion control blanketSQYD A A8,273$2.25$1.73$3.20$1.90$2.17
0830Temp mulchSQYD A A183,662$0.30$0.25$0.41$0.30$0.25
0840Temp seeding and protectionSQYD A A137,746$0.35$0.31$0.43$0.35$0.31
0850Initial fertilizerTON A A6.30$1,650.00$998.00$1,448.16$1,100.00$1,003.35
0860Maintenance fertilizerTON A A10.40$1,650.00$998.00$1,448.16$1,100.00$1,003.35
0870Seeding and protectionSQYD A A192,220$0.59$0.51$0.77$0.60$0.51
0880SoddingSQYD A A27,964$12.10$6.10$12.77$9.00$6.78
0890Agricultural limestoneTON A A170.80$100.00$98.00$86.05$108.00$98.53
0900SBM alum sheet signs .080 inSQFT A A1,143$43.85$43.84$43.84$48.25$36.19
0910SBM alum sheet signs .125 inSQFT A A254$45.45$45.47$45.47$50.00$255.36
0920Steel post type 1LF A A1,766$28.25$28.26$28.26$31.00$30.16
0930Class A concrete for signsCUYD A A34.76$1,585.40$1,585.39$1,585.39$1,750.00$1,005.36
0940Pave striping-temp paint-4 inLF A A68,521$0.18$0.18$0.18$0.20$0.18
0950Pave striping-thermo-6 in WLF A A50,040$1.15$1.15$1.15$1.25$1.16
0960Pave striping-thermo-6 in YLF A A45,340$1.15$1.15$1.15$1.25$1.16
0970Pave striping-thermo-12 in WLF A A98$5.00$5.00$5.00$5.50$5.03
0980Pave striping-dur TY 1-6 in WLF A A850$9.00$9.00$9.00$9.90$9.05
0990Pave striping-dur TY 1-6 in YLF A A680$9.00$9.00$9.00$9.90$9.05
1000Pave marking-thermo X-walk-12 inLF A A2,788$5.00$5.00$5.00$5.50$5.03
1010Pave marking-thermo stop bar-24INLF A A355$10.00$10.00$10.00$11.00$10.05
1020Pave marking-thermo STR arrowEACH A A6$110.00$110.00$110.00$121.00$110.59
1030Pave marking-thermo curv arrowEACH A A20$120.00$120.00$120.00$132.00$120.64
1040Pave marking-thermo comb arrowEACH A A8$140.00$140.00$140.00$154.00$140.75
1050Inlaid pavement marker-MWEACH A A320$36.00$29.00$36.00$40.00$36.19
1060Inlaid pavement marker-MYEACH A A458$36.00$29.00$36.00$40.00$36.19
1070Inlaid pavement marker-byEACH A A290$36.00$29.00$36.00$40.00$36.19
1080Concrete-class ACUYD A A7.68$2,148.00$650.00$1,945.44$2,400.00$1,303.94
1090Steel reinforcementLB A A326$1.95$2.50$10.00$1.30$3.02
1100Crash cushion TY 6 class B TL3EACH A A2$41,000$51,231$51,231$56,350$10,054
1110Fuel adjustmentDOLL A A176,598$1.00$1.00$1.00$1.00$1.00
1120Asphalt adjustmentDOLL A A152,431$1.00$1.00$1.00$1.00$1.00
1130Joint adhesiveLF A A30,800$0.55$0.55$0.55$0.60$0.55
1140Object marker TY 3EACH A A14$300.00$294.28$294.28$325.00$18.10
1150Longitudinal edge keyLF A A800$14.30$6.00$6.00$6.60$6.03
1160Remove signEACH A A2$100.00$90.64$90.64$100.00$100.54
1170GMSS type DEACH A A158$367.75$367.75$367.75$405.00$158.85
1180Pave marking-thermo yield bar-36 inLF A A110$30.00$30.00$30.00$33.00$30.16
1190Detectable warningsSQFT A A1,189$43.00$30.00$30.00$47.25$30.16
1200Pave mark-thermo-yieldEACH A A11$350.00$350.00$350.00$385.00$351.88
1210Roundabout arrowEACH A A16$450.00$450.00$450.00$495.00$804.29
1220Barcode sign inventoryEACH A A245$45.32$45.32$45.32$50.00$20.11
1230Pave mark thermo chevronSQFT A A185$5.00$5.00$5.00$5.50$5.03
1240Pipeline inspectionLF A A10,000$2.35$2.35$2.35$2.60$2.36
1250Longitudinal saw cutLF A A1,193$6.65$3.00$2.00$4.25$2.60
1260Electronic delivery MGMT system - aggLS A A1$0.01$1.00$0.01$1,000.00$10,054
1270Culvert pipe-18 inLF A A377$154.75$68.00$130.00$144.00$144.59
1280Culvert pipe-24 inLF A A754$129.60$80.00$150.00$144.00$180.77
1290Culvert pipe-36 inLF A A296$181.15$190.00$230.00$215.00$313.87
1300Culvert pipe-24 in equivLF A A45$171.20$220.00$160.00$185.00$235.21
1310Culvert pipe-42 in equivLF A A45$343.40$260.00$260.00$300.00$434.14
1320Storm sewer pipe-15 inLF A A2,396$126.00$70.00$115.00$82.00$119.68
1330Storm sewer pipe-18 inLF A A7,131$118.00$92.00$115.00$95.00$145.72
1340Storm sewer pipe-24 inLF A A158$178.00$130.00$130.00$132.00$203.64
1350Pipe culvert headwall-15 inEACH A A3$2,122.00$1,500.00$2,200.00$2,425.00$1,548.83
1360Pipe culvert headwall-18 inEACH A A19$2,181.00$1,600.00$2,200.00$2,875.00$1,692.16
1370Pipe culvert headwall-24 inEACH A A10$2,325.00$2,000.00$2,300.00$4,500.00$2,382.22
1380Pipe culvert headwall-36 inEACH A A2$3,650.00$2,800.00$3,300.00$6,750.00$3,717.54
1390Pipe culvert headwall-42 in equivEACH A A2$7,050.00$4,600.00$3,700.00$8,185.00$5,201.48
1400Curb box inlet type AEACH A A95$7,680.00$7,800.00$7,200.00$6,185.00$8,254.50
1410Curb box inlet type BEACH A A1$7,600.00$7,200.00$6,600.00$6,850.00$6,982.86
1420Drop box inlet type 1EACH A A5$6,660.00$6,800.00$5,400.00$10,000$6,863.17
1430Drop box inlet type 13GEACH A A16$4,065.00$4,800.00$3,000.00$4,600.00$7,853.34
1440Drop box inlet type 13SEACH A A1$5,820.00$6,200.00$3,000.00$5,400.00$6,774.98
1450Manhole type AEACH A A7$4,595.00$7,200.00$4,000.00$6,100.00$4,352.87
1460Structure granular backfillCUYD A A827$85.00$71.14$71.14$115.00$161.90
1470Armored edge for concreteLF A A157.10$90.00$99.50$99.50$100.00$136.98
1480Foundation preparationLS A A1$95,000$80,000$80,000$135,000$1,961.55
1490Crushed aggregate slope protTON A A3,898$0.01$50.23$50.23$72.00$60.85
1500Test pilesLF A A58$500.00$228.00$228.00$210.00$175.96
1510Piles-steel HP12X53LF A A723$90.00$93.76$93.76$130.00$149.57
1520Pile points-12 inEACH A A30$175.00$167.00$167.00$150.00$183.93
1530Concrete-class ACUYD A A582.50$875.00$799.00$799.00$900.00$343.12
1540Concrete-class AACUYD A A1,151.30$950.00$943.76$975.00$750.00$1,084.60
1550Steel reinforcementLB A A89,362$1.79$1.51$1.51$1.75$1.72
1560Steel reinforcement-epoxy coatedLB A A342,788$1.65$1.58$1.58$1.80$1.71
1570Precast PC I beam type 7LF A A2,694.70$725.00$689.91$689.91$652.00$884.53
1580Rock soundingsLF A A62.40$50.00$54.00$54.00$38.50$56.40
1590Rock coringsLF A A236.50$195.00$82.00$82.00$66.00$75.60
1600Drilled shaft-66 in (rock)LF A A88$2,950.00$2,734.00$2,724.00$1,110.00$1,097.42
1610Drilled shaft-72 in commonLF A A57$2,750.00$2,400.00$1,947.00$1,775.00$1,509.87
1620Concrete sealingSQFT A A54,483$1.10$1.45$1.45$1.80$2.02
1630Deck drainEACH A A12$995.00$801.00$801.00$1,550.00$1,992.61
1640Rail system single slope - 40 inLF A A680$115.00$198.84$198.84$235.00$234.13
1650Steel handrailLF A A1,342$75.00$110.27$110.27$121.00$97.11
1660Mobilization for concrete surf treatmentLS A A1$500.00$500.00$500.00$2,835.00$1,005.36
1670Plug pipeEACH A A1$500.00$250.00$1,616.00$900.00$594.91
1680SafeloadingCUYD A A10$695.00$250.00$242.00$300.00$297.97
1690S manholeEACH A A3$7,350.00$10,400$3,962.00$7,900.00$6,357.56
1700S manhole abandon/removeEACH A A2$1,480.00$1,800.00$2,212.00$2,750.00$2,450.84
1710S manhole adjust to gradeEACH A A1$1,550.00$750.00$1,737.00$1,000.00$3,241.34
1720S manhole casting watertightEACH A A3$1,320.00$800.00$844.00$900.00$559.15
1730S manhole tap existingEACH A A1$4,665.00$950.00$2,600.00$550.00$3,284.28
1740S pipe PVC 12 inchLF A A180$288.00$185.00$281.70$250.00$248.98
1750Pole 40 FT MTG HTEACH A A20$2,390.00$2,390.00$2,390.00$2,630.00$2,402.82
1760Bracket 4 FTEACH A A6$450.00$450.00$450.00$500.00$452.41
1770Bracket 10 FTEACH A A10$700.00$700.00$700.00$770.00$703.75
1780Bracket 15 FTEACH A A4$800.00$800.00$800.00$880.00$804.29
1790Pole baseEACH A A20$2,500.00$2,500.00$2,500.00$2,750.00$2,513.41
1800Transformer baseEACH A A20$1,225.00$1,225.00$1,225.00$1,350.00$1,231.57
1810Lighting control equipmentEACH A A2$19,500$19,500$19,500$21,500$19,605
1820Fused connector kitEACH A A64$125.00$125.00$125.00$140.00$125.67
1830Conduit-3 inLF A A865$30.50$30.50$30.50$35.00$30.66
1840Trenching and backfillingLF A A2,980$16.25$16.25$16.25$18.00$16.34
1850Wire-no. 12LF A A3,560$2.00$2.00$2.00$2.25$2.01
1860Cable-no. 14/5CLF A A1,030$2.50$2.50$2.50$2.75$2.51
1870Cable-no. 14/7CLF A A3,960$2.80$2.80$2.80$3.10$2.82
1880Messenger-10800 LBLF A A855$15.10$15.10$15.10$16.60$15.18
1890Install steel strain poleEACH A A8$1,750.00$1,750.00$1,750.00$1,925.00$1,759.39
1900Install pedestrian head-LEDEACH A A16$350.00$350.00$350.00$385.00$351.88
1910Install LED signal-3 sectionEACH A A20$780.00$780.00$780.00$860.00$784.18
1920Install coordinating unitEACH A A2$275.00$275.00$275.00$300.00$276.48
1930Electrical junction box type AEACH A A5$1,150.00$1,150.00$1,150.00$1,265.00$1,156.17
1940Bore and jack conduitLF A A35$175.00$175.00$175.00$192.50$175.94
1950Install pedestrian detectorEACH A A16$200.00$200.00$200.00$220.00$201.07
1960Traffic signal pole baseCUYD A A32.20$1,450.00$1,450.00$1,450.00$1,595.00$1,457.78
1970Install signal pedestalEACH A A8$1,775.00$1,775.00$1,775.00$1,952.50$1,784.52
1980LED luminaireEACH A A20$585.00$585.00$585.00$643.50$588.14
1990Cable-no. 10/3C ductedLF A A3,150$8.50$8.50$8.50$9.35$8.55
2000PVC conduit-1 1/4 in-schedule 80LF A A145$6.40$6.40$6.40$7.00$6.43
2010PVC conduit-2 in-schedule 80LF A A65$7.60$7.60$7.60$8.35$7.64
2020Install signal controller-TY atcEACH A A2$11,325$11,325$11,325$12,500$11,386
2030Install radar presence detector type AEACH A A8$1,385.00$1,385.00$1,385.00$1,525.00$1,392.43
2040Plug pipeEACH A A16$250.00$1,400.00$1,637.00$1,525.00$615.26
2050SafeloadingCUYD A A260$305.00$250.00$242.00$170.00$292.23
2060W air release valve 1 inchEACH A A2$5,195.00$3,500.00$3,673.00$6,250.00$4,677.95
2070W air release valve specialEACH A A3$7,100.00$4,500.00$6,092.00$8,100.00$5,756.90
2080W fire hydrant assemblyEACH A A3$7,120.00$9,800.00$9,511.00$8,550.00$11,018
2090W fire hydrant relocateEACH A A4$3,590.00$5,500.00$3,405.00$3,000.00$2,917.04
2100W meter relocateEACH A A3$1,875.00$1,700.00$2,066.00$2,875.00$1,922.66
2110W pipe ductile iron 08 inchLF A A445$187.00$125.00$148.35$155.00$158.54
2120W pipe ductile iron 12 inchLF A A3,830$206.00$175.00$184.55$175.00$170.73
2130W pipe ductile iron 20 inchLF A A1,400$330.00$380.00$330.10$375.00$330.11
2140W pipe DCTL iron RSTRND joint 12 inLF A A685$262.00$165.00$208.90$240.00$358.51
2150W pipe DCTL iron RSTRND joint 20 inLF A A220$417.00$420.00$390.25$605.00$737.63
2160W tie-in 08 inchEACH A A4$5,100.00$3,800.00$5,938.00$2,800.00$5,839.94
2170W tie-in 12 inchEACH A A8$6,100.00$4,900.00$7,187.00$5,150.00$7,629.28
2180W tie-in 20 inchEACH A A4$15,000$15,000$13,278$6,025.00$12,932
2190W valve 08 inchEACH A A3$2,535.00$2,700.00$3,127.00$4,100.00$3,359.09
2200W valve 12 inchEACH A A15$4,200.00$4,900.00$5,532.00$6,625.00$6,563.24
2210W valve 20 inchEACH A A2$29,220$32,000$27,148$34,000$35,540
2220W valve cut-in 12 inchEACH A A2$9,325.00$7,000.00$6,801.00$9,465.00$15,213
2230W serv copper short side 1 inEACH A A3$2,465.00$5,500.00$1,566.00$4,400.00$3,660.07
2240MobilizationLS A A1$1,300,000$1,150,000$1,470,000$1,230,000$936,448
2250DemobilizationLS A A1$432,675$425,000$449,000$500,000$524,715
KYTC contract 25-1028: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.

Every contract let that day: KYTC letting of September 25, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy