R G F Inc: KYTC bid record
R G F Inc submitted 15 bids on Kentucky Transportation Cabinet contracts in the data, from 21 FEB 2020 to 28 APR 2022, and was the low bidder on 3 of them (20%). When it was not low, its total sat a median +47% above the low bid.
- Owner
- Kentucky Transportation Cabinet
- Low bid volume
- $3,894,479
- Latest bid
- 28 APR 2022
- Data through
- 22 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 8 | 0 | 0% |
| 2021 | 5 | 2 | 40% |
| 2022 | 2 | 1 | 50% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 9 | 5 | 3 | 60% |
| District 6 | 3 | 0 | 0% |
| District 7 | 2 | 0 | 0% |
| District 10 | 2 | 0 | 0% |
| District 5 | 1 | 0 | 0% |
| District 2 | 1 | 0 | 0% |
| District 4 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Concrete-class AA | CY | 12 | 5 (42%) | $1,125.00 | $1,716.02 | |
| Asphalt seal coat | TON | 8 | 4 (50%) | $660.00 | $1,370.39 | |
| Concrete-class A | CY | 16 | 3 (19%) | $1,275.59 | $1,088.01 | |
| CL2 asph surf 0.38D PG64-22 | TON | 14 | 3 (21%) | $156.75 | $102.95 | |
| CL2 asph base 1.00D PG64-22 | TON | 10 | 3 (30%) | $101.16 | $135.00 | |
| Delineator for guardrail BI directional white | EACH | 8 | 3 (38%) | $9.46 | $14.19 | |
| Structure excav-solid rock | CY | 8 | 3 (38%) | $100.00 | $125.00 | |
| Remove pavement | SY | 7 | 3 (43%) | $10.00 | $14.00 | |
| Perforated pipe-4 in | LF | 5 | 3 (60%) | $6.00 | $15.00 | |
| Non-perforated pipe-4 in | LF | 5 | 3 (60%) | $6.00 | $20.00 | |
| Steel reinforcement | LB | 14 | 2 (14%) | $1.55 | $1.85 | |
| Steel reinforcement-epoxy coated | LB | 12 | 2 (17%) | $1.50 | $2.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| M & M Services Co Inc | 9 | 3 of 9 |
| Jave LLC | 9 | 5 of 9 |
| Frederick & May Construction Co | 8 | 7 of 8 |
| Walker Construction & Materials LLC | 7 | 4 of 7 |
| Bush & Burchett Inc | 6 | 4 of 6 |
| Scott and Murphy Inc | 4 | 4 of 4 |
| Louisville Paving Company Inc | 4 | 4 of 4 |
| Hinkle Construction Services LLC | 4 | 4 of 4 |
| Sunesis Construction Co | 3 | 1 of 3 |
| Todd Johnson Contracting Inc | 3 | 3 of 3 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 28 APR 2022 | 22-5239 | District 9 | BRIDGE REPLACEMENT CIMARRON ROAD (KY 377) | 1 of 5 | $1,032,347 | Low, 5.0% under the second |
| 27 JAN 2022 | 22-2901 | District 10 | BRIDGE SUPERSTRUCTURE REPLACEMENT WOLFE COUNTY SUPERSTRUCTURE REPLACEMENTS. | 6 of 7 | $600,127 | +52% |
| 23 APR 2021 | 21-1315 | District 9 | BRIDGE REPLACEMENT GERMANTOWN ROAD (KY 3056) | 1 of 6 | $557,894 | Low, 11% under the second |
| 23 APR 2021 | 21-1016 | District 9 | GRADE, DRAIN & SURFACE WITH BRIDGE ELIZAVILLE ROAD(KY-32) | 1 of 2 | $2,304,238 | Low, 2.0% under the second |
| 19 MAR 2021 | 21-1308 | District 6 | GRADE, DRAIN & SURFACE WITH BRIDGE US 27 | 4 of 5 | $6,665,242 | +18% |
| 19 FEB 2021 | 21-1006 | District 9 | BRIDGE REPLACEMENT MOREHEAD-OLIVE HILL ROAD(US-60) | 6 of 6 | $1,656,507 | +26% |
| 29 JAN 2021 | 21-1302 | District 10 | GRADE, DRAIN & SURFACE WITH BRIDGE POMPEII ROAD (KY 2026) | 5 of 6 | $1,506,777 | +23% |
| 20 NOV 2020 | 20-5172 | District 2 | BRIDGE DEMOLITION CR 1324 | 5 of 6 | $125,000 | +129% |
| 20 NOV 2020 | 20-5188 | District 4 | BRIDGE SUPERSTRUCTURE REPLACEMENT WATSON SCHOOL ROAD | 10 of 10 | $271,608 | +53% |
| 23 OCT 2020 | 20-1317 | District 6 | BRIDGE WITH GRADE, DRAIN & SURFACE WEST 11TH STREET (KY 1120) | 4 of 5 | $1,563,101 | +101% |
| 23 OCT 2020 | 20-5175 | District 7 | BRIDGE REPLACEMENT KY 1984 OVER TATES CREEK | 11 of 11 | $622,258 | +53% |
| 24 JUL 2020 | 20-1013 | District 9 | GRADE, DRAIN & SURFACE WITH BRIDGE LITTLE PERRY ROAD(CR-1025) | 3 of 6 | $797,678 | +18% |
| 24 JUL 2020 | 20-5173 | District 7 | BRIDGE REPLACEMENT KY 44 | 9 of 12 | $1,738,992 | +34% |
| 21 FEB 2020 | 20-5155 | District 6 | BRIDGE REPLACEMENT KY 2238 | 3 of 3 | $1,424,214 | +44% |
| 21 FEB 2020 | 20-5168 | District 5 | BRIDGE REPAIRS CR 1128 | 9 of 9 | $687,258 | +51% |
How this record was read
KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; KYTC's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.