Todd Johnson Contracting Inc: KYTC bid record

Todd Johnson Contracting Inc submitted 12 bids on Kentucky Transportation Cabinet contracts in the data, from 21 FEB 2020 to 25 SEP 2025, and was the low bidder on 4 of them (33%). When it was not low, its total sat a median +10% above the low bid.

Owner
Kentucky Transportation Cabinet
Low bid volume
$2,210,358
Latest bid
25 SEP 2025
Data through
22 OCT 2026
12Bids
4Low bids
33Win rate, percent
+10%Median gap to the low bid when not low, 8 bids

By year

YearBidsLow bidsWin rate
20203133%
20246233%
20253133%
Todd Johnson Contracting Inc, KYTC: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 5200%
District 722100%
District 42150%
District 6200%
District 3100%
Todd Johnson Contracting Inc, KYTC: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Concrete-class AACY64 (67%)$1,015.00$1,716.02
Cyclopean stone rip rapTON63 (50%)$51.71$60.00
Armored edge for concreteLF62 (33%)$77.83$120.00
Granular embankmentCY52 (40%)$48.30$85.00
Concrete sealingSF71 (14%)$2.33$3.00
Rail system side mounted MGSLF61 (17%)$268.57$231.46
Guardrail-steel W beam-S faceLF51 (20%)$38.40$38.00
Todd Johnson Contracting Inc, KYTC: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Todd Johnson Contracting Inc, KYTC: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
25 SEP 202525-5391BRIDGE REPLACEMENT CR 11174 of 4$644,285+30%
25 SEP 202525-5389BRIDGE REPLACEMENT CR 11101 of 6$660,669Low, 7.0% under the second
21 AUG 202525-2988BRIDGE REPLACEMENT STATE HWY 3630 (KY 3630)6 of 7$793,516+22%
14 NOV 202424-2943District 7BRIDGE REPLACEMENT BIRDIE ROAD (KY 395)1 of 9$710,383Low, 4.0% under the second
14 NOV 202424-2906District 4BRIDGE WITH GRADE & DRAIN SHORT LINE PIKE (KY 1195)1 of 7$432,884Low, 27% under the second
26 SEP 202424-2995District 3BRIDGE WITH GRADE, DRAIN & SURFACE STRINGTOWN FLIPPIN ROAD (KY 678)3 of 4$839,515+4.0%
22 AUG 202424-2952District 6BRIDGE REPLACEMENT ELLISTON-MT. ZION ROAD (KY 1942)3 of 7$984,627+9.0%
18 JUL 202424-5358District 6BRIDGE REPLACEMENT KY 4913 of 8$791,168+9.0%
18 JUL 202424-5356District 5BRIDGE REPLACEMENT CR 10045 of 6$933,264+10%
20 NOV 202020-5188District 4BRIDGE SUPERSTRUCTURE REPLACEMENT WATSON SCHOOL ROAD9 of 10$259,138+46%
23 OCT 202020-5175District 7BRIDGE REPLACEMENT KY 1984 OVER TATES CREEK1 of 11$406,422Low, 18% under the second
21 FEB 202020-5168District 5BRIDGE REPAIRS CR 11283 of 9$498,278+9.0%
Todd Johnson Contracting Inc: latest KYTC bids in the data

How this record was read

KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; KYTC's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy