KYTC contract 25-2247 bid tabulation
JPC PAVEMENT REPAIRS - DIAMOND GRINDING OWENSBORO ROAD (US 60 EASTBOUND ONLY). Let by Kentucky Transportation Cabinet on July 24, 2025. 6 bids received; low bid $5,849,950 by Jbi Construction Inc, -6.1% against the engineer's estimate of $6,227,388.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 24 JUL 2025
- Pay items
- 32
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Jbi Construction Inc | $5,849,950 | Low | -6.0% |
| 2 | Bluegrass Contracting Corporation | $6,278,345 | +7.0% | +1.0% |
| 3 | The Harper Company DBA the W L Harper Co | $6,290,080 | +8.0% | +1.0% |
| 4 | Emery Sapp & Sons Inc | $6,514,943 | +11% | +5.0% |
| 5 | Mac Construction & Excavating Inc | $6,980,000 | +19% | +12% |
| 6 | Hall Contracting of Kentucky Inc | $7,000,000 | +20% | +12% |
Engineer's estimate: $6,227,388.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Jbi Construction Inc | 2. Bluegrass Contracting Corporation | 3. The Harper Company DBA the W L Harper Co | 4. Emery Sapp & Sons Inc | 5. Mac Construction & Excavating Inc | 6. Hall Contracting of Kentucky Inc |
|---|---|---|---|---|---|---|---|---|---|
| 0010 | Dga base | TON A A | 3,000 | $47.00 | $49.00 | $46.80 | $54.00 | $60.00 | $60.00 |
| 0020 | Asphalt seal aggregate | TON A A | 625 | $90.00 | $94.00 | $89.30 | $104.00 | $60.00 | $100.00 |
| 0030 | Asphalt seal coat | TON A A | 75 | $765.00 | $800.00 | $762.75 | $889.00 | $1,610.00 | $800.00 |
| 0040 | Leveling & wedging PG64-22 | TON A A | 800 | $124.00 | $130.00 | $123.45 | $144.00 | $140.00 | $130.00 |
| 0050 | CL2 asph base 1.00D PG64-22 | TON A A | 7,275 | $106.00 | $110.50 | $105.35 | $122.75 | $103.00 | $106.00 |
| 0060 | CL2 asph base 0.75D PG64-22 | TON A A | 7,275 | $106.00 | $110.50 | $105.35 | $122.75 | $107.00 | $106.00 |
| 0070 | Asphalt material for tack | TON A A | 20 | $300.00 | $315.00 | $300.00 | $350.00 | $1.00 | $250.00 |
| 0080 | Barricade-type III | EACH A A | 20 | $130.00 | $133.00 | $110.00 | $136.00 | $120.00 | $110.00 |
| 0090 | Remove PCC pavement | SQYD A A | 6,540 | $55.00 | $45.50 | $44.14 | $58.00 | $45.00 | $55.00 |
| 0100 | PCC pavement diamond grinding | SQYD A A | 111,000 | $4.50 | $5.50 | $4.20 | $3.52 | $7.00 | $5.00 |
| 0110 | JPC pavement-8 in | SQYD A A | 6,540 | $115.00 | $114.00 | $137.13 | $124.00 | $135.00 | $160.00 |
| 0120 | Partial depth patching | CUFT A A | 2,000 | $185.00 | $250.00 | $292.41 | $328.00 | $300.00 | $375.00 |
| 0130 | Saw-clean-reseal tverse joint | LF A A | 20,000 | $2.50 | $2.00 | $4.09 | $4.32 | $4.00 | $2.00 |
| 0140 | Saw-clean-reseal longit joint | LF A A | 40,000 | $2.50 | $2.00 | $3.09 | $2.78 | $4.00 | $2.00 |
| 0150 | Temporary signs | SQFT A A | 470 | $10.00 | $10.80 | $9.00 | $11.00 | $10.00 | $5.00 |
| 0160 | Maintain & control traffic | LS A A | 1 | $125,000 | $253,000 | $241,576 | $56,000 | $433,359 | $700,000 |
| 0170 | Portable changeable message sign | EACH A A | 2 | $9,900.00 | $6,800.00 | $2,500.00 | $3,458.00 | $7,000.00 | $10,000 |
| 0180 | Mobilization for mill & text | LS A A | 1 | $3,500.00 | $3,675.00 | $3,500.00 | $4,077.00 | $1,500.00 | $8,500.00 |
| 0190 | Asphalt pave milling & texturing | TON A A | 14,550 | $18.50 | $19.25 | $18.34 | $21.35 | $19.00 | $20.00 |
| 0200 | Arrow panel | EACH A A | 1 | $3,500.00 | $3,500.00 | $1,500.00 | $2,346.00 | $3,021.00 | $4,500.00 |
| 0210 | Pave striping-temp paint-4 in | LF A A | 75,000 | $0.30 | $0.32 | $0.30 | $0.35 | $0.50 | $0.35 |
| 0220 | Pave striping-dur TY 1-6 in Y | LF A A | 50,000 | $9.00 | $9.45 | $9.00 | $10.50 | $9.00 | $6.50 |
| 0230 | Pave striping-dur TY 1-6 in W | LF A A | 37,200 | $9.00 | $9.45 | $9.00 | $10.50 | $9.00 | $6.50 |
| 0240 | Pave marking-thermo curv arrow | EACH A A | 23 | $115.00 | $120.00 | $115.00 | $134.00 | $115.00 | $125.00 |
| 0250 | Fuel adjustment | DOLL A A | 23,893 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0260 | Asphalt adjustment | DOLL A A | 60,012 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0270 | Shoulder rumble strips-sawed | LF A A | 75,000 | $0.30 | $0.18 | $0.27 | $0.20 | $0.20 | $0.20 |
| 0280 | Saw-clean-reseal random cracks | LF A A | 2,000 | $5.00 | $4.00 | $6.34 | $7.00 | $4.00 | $2.50 |
| 0290 | Water blasting existing stripe | LF A A | 175,000 | $0.70 | $0.71 | $0.68 | $0.80 | $0.68 | $0.36 |
| 0300 | Electronic delivery MGMT system - agg | LS A A | 1 | $1,500.00 | $1,575.00 | $1,500.00 | $1,747.00 | $1,500.00 | $500.00 |
| 0310 | Mobilization | LS A A | 1 | $250,000 | $290,000 | $290,000 | $186,000 | $310,000 | $324,300 |
| 0320 | Demobilization | LS A A | 1 | $87,900 | $87,262 | $95,000 | $105,000 | $110,000 | $98,920 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of July 24, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way