KYTC contract 26-1127 bid tabulation
JPC PAVEMENT I-75 NB REST AREA TRUCK PARKING EXPANSION - WHITLEY CO. Let by Kentucky Transportation Cabinet on June 25, 2026. 3 bids received; low bid $2,176,324 by Fox Enterprises Inc, -25% against the engineer's estimate of $2,890,890.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 25 JUN 2026
- Pay items
- 80
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Fox Enterprises Inc | $2,176,324 | Low | -25% |
| 2 | Bluegrass Contracting Corporation | $2,379,534 | +9.0% | -18% |
| 3 | The Harper Company DBA the W L Harper Co | $2,415,566 | +11% | -16% |
Engineer's estimate: $2,890,890.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Fox Enterprises Inc | 2. Bluegrass Contracting Corporation | 3. The Harper Company DBA the W L Harper Co |
|---|---|---|---|---|---|---|
| 0010 | Crushed stone base | TON A A | 2,759 | $44.00 | $45.00 | $48.16 |
| 0020 | Asphalt seal aggregate | TON A A | 15 | $290.00 | $225.00 | $283.00 |
| 0030 | Asphalt seal coat | TON A A | 1.80 | $3,500.00 | $1,500.00 | $3,435.00 |
| 0040 | JPC pavement-9 in | SQYD A A | 9,386 | $117.17 | $126.50 | $109.45 |
| 0050 | Asphalt pave milling & texturing | TON A A | 25 | $20.00 | $108.00 | $115.23 |
| 0060 | Curb box inlet type B | EACH A A | 1 | $12,872 | $9,000.00 | $11,105 |
| 0070 | Cap curb box inlet | EACH A A | 2 | $2,050.00 | $4,350.00 | $1,599.12 |
| 0080 | Standard integral curb | LF A A | 755 | $30.20 | $18.50 | $34.73 |
| 0090 | Remove curb | LF A A | 1,032 | $16.95 | $17.00 | $10.28 |
| 0100 | Remove PCC pavement | SQYD A A | 285 | $18.95 | $40.00 | $46.14 |
| 0110 | Temp ditch | LF A A | 1,325 | $2.00 | $3.40 | $4.98 |
| 0120 | Clean temp ditch | LF A A | 663 | $2.00 | $1.00 | $0.25 |
| 0130 | Roadway excavation | CUYD A A | 2,880 | $24.85 | $45.00 | $37.75 |
| 0140 | G/R-W beam-S face TL-3 | LF A A | 375 | $35.00 | $40.00 | $35.00 |
| 0150 | G/R end treatment type 1 | EACH A A | 1 | $4,500.00 | $5,100.00 | $4,500.00 |
| 0160 | Remove G/R | LF A A | 225 | $2.00 | $2.25 | $2.00 |
| 0170 | G/R end treatment type 4A | EACH A A | 1 | $4,500.00 | $5,100.00 | $4,500.00 |
| 0180 | Clearing and grubbing | LS A A | 1 | $15,000 | $35,100 | $18,000 |
| 0190 | Temporary signs | SQFT A A | 640 | $8.48 | $10.00 | $8.00 |
| 0200 | Maintain & control traffic | LS A A | 1 | $122,220 | $20,000 | $316,350 |
| 0210 | Portable changeable message sign | EACH A A | 4 | $3,710.00 | $5,080.00 | $4,766.40 |
| 0220 | Mobilization for mill & text | LS A A | 1 | $3,700.00 | $1,500.00 | $3,700.00 |
| 0230 | Temp silt fence | LF A A | 1,325 | $5.35 | $5.00 | $2.60 |
| 0240 | Silt trap type B | EACH A A | 7 | $620.15 | $66.00 | $608.99 |
| 0250 | Silt trap type C | EACH A A | 4 | $495.00 | $176.00 | $233.37 |
| 0260 | Clean silt trap type B | EACH A A | 7 | $111.70 | $100.00 | $50.00 |
| 0270 | Clean silt trap type C | EACH A A | 4 | $132.00 | $50.00 | $50.00 |
| 0280 | Sidewalk-4 in concrete | SQYD A A | 417 | $54.23 | $90.00 | $62.36 |
| 0290 | Staking | LS A A | 1 | $25,000 | $48,700 | $83,008 |
| 0300 | Arrow panel | EACH A A | 1 | $2,517.50 | $2,870.00 | $3,234.34 |
| 0310 | Temp mulch | SQYD A A | 5,683 | $0.49 | $0.55 | $0.60 |
| 0320 | Temp seeding and protection | SQYD A A | 4,260 | $0.58 | $0.70 | $0.79 |
| 0330 | Initial fertilizer | TON A A | 0.50 | $1,590.00 | $1,800.00 | $1,032.00 |
| 0340 | Maintenance fertilizer | TON A A | 0.30 | $1,590.00 | $1,800.00 | $1,032.00 |
| 0350 | Seeding and protection | SQYD A A | 8,525 | $0.65 | $0.74 | $0.94 |
| 0360 | Agricultural limestone | TON A A | 5 | $130.00 | $150.00 | $98.00 |
| 0370 | SBM aluminum panel signs | SQFT A A | 45 | $45.00 | $50.00 | $45.00 |
| 0380 | SBM alum sheet signs .080 in | SQFT A A | 18 | $35.00 | $40.00 | $35.00 |
| 0390 | SBM alum sheet signs .125 in | SQFT A A | 358 | $35.00 | $40.00 | $35.00 |
| 0400 | Steel post type 1 | LF A A | 373 | $35.00 | $40.00 | $35.00 |
| 0410 | GMSS galv steel type C | LB A A | 234 | $18.00 | $20.00 | $18.00 |
| 0420 | Class A concrete for signs | CUYD A A | 3.23 | $1,000.00 | $1,130.00 | $1,000.00 |
| 0430 | Steel reinforcement for signs | LB A A | 114 | $3.00 | $3.50 | $3.00 |
| 0440 | Pave striping-thermo-6 in W | LF A A | 3,009 | $2.25 | $2.50 | $1.95 |
| 0450 | Pave striping-thermo-6 in Y | LF A A | 705 | $2.25 | $2.50 | $1.95 |
| 0460 | Pave striping-temp rem tape-W | LF A A | 7,880 | $2.50 | $2.85 | $2.29 |
| 0470 | Pave striping-temp rem tape-Y | LF A A | 5,960 | $2.50 | $2.85 | $2.29 |
| 0480 | Pave marking-thermo X-walk-12 in | LF A A | 113 | $15.00 | $17.00 | $7.10 |
| 0490 | Pave marking-thermo cross-hatch | SQFT A A | 2,130 | $5.00 | $5.65 | $5.50 |
| 0500 | Pave marking-paint parking lot | LF A A | 4,939 | $1.25 | $1.50 | $1.25 |
| 0510 | Fuel adjustment | DOLL A A | 2,759 | $1.00 | $1.00 | $1.00 |
| 0520 | Object marker TY 3 | EACH A A | 2 | $100.00 | $115.00 | $100.00 |
| 0530 | Pave mark handicap symbol | EACH A A | 6 | $300.00 | $340.00 | $250.00 |
| 0540 | Remove asphalt shoulder | SQYD A A | 1,963 | $22.30 | $22.50 | $11.46 |
| 0550 | GMSS type D | EACH A A | 9 | $800.00 | $900.00 | $800.00 |
| 0560 | Barcode sign inventory | EACH A A | 39 | $25.00 | $28.00 | $25.00 |
| 0570 | Pave mark thermo-wrong way arrow | EACH A A | 2 | $500.00 | $565.00 | $450.00 |
| 0580 | Longitudinal saw cut | LF A A | 3,805 | $8.60 | $2.50 | $3.68 |
| 0590 | Thrie beam G/R transition TL-2 | EACH A A | 2 | $3,500.00 | $4,550.00 | $3,500.00 |
| 0600 | Electronic delivery MGMT system - agg | LS A A | 1 | $911.20 | $1,250.00 | $250.00 |
| 0610 | Rock excavation | CUYD A A | 320 | $104.50 | $226.00 | $114.22 |
| 0620 | Storm sewer pipe-15 in | LF A A | 4 | $136.75 | $282.00 | $1,181.15 |
| 0630 | Remove pipe | LF A A | 65 | $64.65 | $115.00 | $37.90 |
| 0640 | Flume inlet type 2 | EACH A A | 1 | $5,046.46 | $9,040.00 | $8,336.83 |
| 0650 | Pole 30 FT MTG HT | EACH A A | 3 | $4,500.00 | $5,084.00 | $4,500.00 |
| 0660 | Bracket 15 FT | EACH A A | 3 | $2,000.00 | $2,260.00 | $2,000.00 |
| 0670 | Pole base | EACH A A | 9 | $2,500.00 | $2,825.00 | $2,500.00 |
| 0680 | Transformer base | EACH A A | 3 | $1,000.00 | $1,130.00 | $1,000.00 |
| 0690 | Fused connector kit | EACH A A | 18 | $250.00 | $282.00 | $250.00 |
| 0700 | Conduit-1 in | LF A A | 2,660 | $0.83 | $1.00 | $0.83 |
| 0710 | Electrical junction box | EACH A A | 4 | $3,500.00 | $3,955.00 | $3,500.00 |
| 0720 | Trenching and backfilling | LF A A | 2,660 | $12.42 | $14.00 | $12.42 |
| 0730 | Wire-no. 12 | LF A A | 450 | $0.27 | $0.30 | $0.27 |
| 0740 | Wire-no. 8 | LF A A | 3,220 | $2.06 | $2.30 | $2.06 |
| 0750 | Wire-no. 4 | LF A A | 2,150 | $3.44 | $4.00 | $3.44 |
| 0760 | Remove store & reinstall pole | EACH A A | 6 | $11,733 | $13,225 | $11,733 |
| 0770 | Wire-no. 10 | LF A A | 2,685 | $1.55 | $1.80 | $1.55 |
| 0780 | LED luminaire | EACH A A | 3 | $1,500.00 | $1,694.50 | $1,500.00 |
| 0790 | Mobilization | LS A A | 1 | $82,500 | $111,500 | $110,000 |
| 0800 | Demobilization | LS A A | 1 | $30,943 | $33,546 | $35,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of June 25, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way