KYTC contract 25-1104 bid tabulation
GRADE, DRAIN & SURFACE WITH BRIDGE NEW BURNSIDE CONNECTOR (NEW ROUTE). Let by Kentucky Transportation Cabinet on March 20, 2025, Pulaski, District 8. 2 bids received; low bid $4,377,579 by Rame Contracting LLC, -19% against the engineer's estimate of $5,393,034.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 20 MAR 2025
- Pay items
- 128
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Rame Contracting LLC | $4,377,579 | Low | -19% |
| 2 | Weddle Enterprises Inc | $4,649,304 | +6.0% | -14% |
Engineer's estimate: $5,393,034.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Rame Contracting LLC | 2. Weddle Enterprises Inc |
|---|---|---|---|---|---|
| 0010 | Crushed stone base | TON A | 7,704 | $32.15 | $32.47 |
| 0020 | Asphalt seal aggregate | TON A | 60.20 | $165.75 | $167.41 |
| 0030 | Asphalt seal coat | TON A | 8.10 | $823.85 | $832.09 |
| 0040 | Leveling & wedging PG64-22 | TON A | 65 | $135.00 | $136.35 |
| 0050 | Leveling & wedging PG76-22 | TON A | 351 | $135.00 | $136.35 |
| 0060 | CL2 asph base 1.00D PG64-22 | TON A | 3,348 | $119.25 | $120.44 |
| 0070 | CL3 asph base 1.00D PG64-22 | TON A | 701 | $121.10 | $122.31 |
| 0080 | CL3 asph base 1.00D PG76-22 | TON A | 468 | $125.65 | $126.91 |
| 0090 | CL2 asph surf 0.38D PG64-22 | TON A | 803 | $129.00 | $130.29 |
| 0100 | CL3 asph surf 0.38B PG76-22 | TON A | 812 | $135.00 | $136.35 |
| 0110 | Asphalt pave milling & texturing | TON A | 972 | $31.25 | $31.56 |
| 0120 | Asphalt material for tack non-tracking | TON A | 9.80 | $10.00 | $10.10 |
| 0130 | Crushed aggregate size no 2 | TON A | 3,790 | $31.00 | $27.28 |
| 0140 | Conc median barrier type A TL5 56 in | LF A | 703 | $197.62 | $207.19 |
| 0150 | Delineator for barrier wall-B/Y | EACH A | 5 | $17.00 | $17.51 |
| 0160 | Delineator for guardrail BI directional white | EACH A | 40 | $16.00 | $16.48 |
| 0170 | Barricade-type III | EACH A | 12 | $100.00 | $154.50 |
| 0180 | Remove pavement | SQYD A | 761 | $7.25 | $5.10 |
| 0190 | Temp ditch | LF A | 1,150 | $0.25 | $1.56 |
| 0200 | Clean temp ditch | LF A | 575 | $0.10 | $0.87 |
| 0210 | Embankment in place | CUYD A | 40,777 | $13.35 | $14.73 |
| 0220 | Water | MGAL A | 25 | $1.00 | $515.00 |
| 0230 | Fence-woven wire type 1 | LF A | 337 | $15.90 | $16.06 |
| 0240 | Remove fence | LF A | 337 | $12.59 | $12.72 |
| 0250 | Guardrail-steel W beam-S face | LF A | 762.50 | $31.64 | $32.59 |
| 0260 | Guardrail terminal section no 1 | EACH A | 3 | $90.16 | $92.86 |
| 0270 | Guardrail end treatment type 1 | EACH A | 6 | $3,532.73 | $3,638.71 |
| 0280 | Guardrail end treatment type 7 | EACH A | 1 | $2,032.31 | $2,093.28 |
| 0290 | Remove guardrail | LF A | 2,012 | $3.23 | $3.33 |
| 0300 | Right-of-way monument type 1 | EACH A | 4 | $174.89 | $180.14 |
| 0310 | Right-of-way monument type 1A | EACH A | 3 | $174.89 | $180.14 |
| 0320 | Witness post | EACH A | 4 | $150.06 | $154.56 |
| 0330 | Channel lining class II | TON A | 811 | $68.25 | $33.29 |
| 0340 | Channel lining class III | TON A | 448 | $70.25 | $42.33 |
| 0350 | Clearing and grubbing | LS A | 1 | $28,900 | $27,687 |
| 0360 | Concrete-class B | CUYD A | 1 | $2,570.41 | $2,647.52 |
| 0370 | Temporary signs | SQFT A | 750 | $6.00 | $10.30 |
| 0380 | Fabric-geotextile class 1 | SQYD A | 7,387 | $3.80 | $2.39 |
| 0390 | Fabric-geotextile class 1A | SQYD A | 5,500 | $4.25 | $2.34 |
| 0400 | Maintain & control traffic | LS A | 1 | $87,500 | $194,128 |
| 0410 | Diversions (by-pass detours) | LS A | 1 | $11,200 | $52,033 |
| 0420 | Portable changeable message sign | EACH A | 8 | $4,452.00 | $2,537.20 |
| 0430 | Mobilization for mill & text | LS A | 1 | $10,000 | $10,100 |
| 0440 | Shoulder rumble strips | LF A | 2,100 | $2.40 | $2.47 |
| 0450 | Temp silt fence | LF A | 1,150 | $2.50 | $5.56 |
| 0460 | Silt trap type A | EACH A | 15 | $250.00 | $266.00 |
| 0470 | Silt trap type B | EACH A | 15 | $250.00 | $251.53 |
| 0480 | Silt trap type C | EACH A | 15 | $250.00 | $138.95 |
| 0490 | Clean silt trap type A | EACH A | 15 | $25.00 | $143.01 |
| 0500 | Clean silt trap type B | EACH A | 15 | $25.00 | $143.01 |
| 0510 | Clean silt trap type C | EACH A | 15 | $25.00 | $50.93 |
| 0520 | Staking | LS A | 1 | $27,000 | $47,251 |
| 0530 | Arrow panel | EACH A | 2 | $1,060.00 | $8,993.60 |
| 0540 | Conc barrier wall type 9T | LF A | 2,250 | $32.25 | $105.79 |
| 0550 | Erosion control blanket | SQYD A | 27,548 | $2.79 | $1.40 |
| 0560 | Temp mulch | SQYD A | 48,400 | $0.43 | $0.44 |
| 0570 | Temp seeding and protection | SQYD A | 38,720 | $0.45 | $0.46 |
| 0580 | Initial fertilizer | TON A | 3 | $1,582.14 | $1,629.60 |
| 0590 | Maintenance fertilizer | TON A | 2 | $1,582.14 | $1,629.60 |
| 0600 | Seeding and protection | SQYD A | 38,137 | $0.77 | $0.79 |
| 0610 | Sodding | SQYD A | 1,982 | $11.17 | $11.51 |
| 0620 | Agricultural limestone | TON A | 27 | $85.74 | $88.31 |
| 0630 | Pave striping-temp paint-4 in | LF A | 1,200 | $0.26 | $0.27 |
| 0640 | Pave striping-temp paint-6 in | LF A | 4,000 | $0.34 | $0.35 |
| 0650 | Pave striping-perm paint-4 in | LF A | 2,552 | $0.28 | $0.29 |
| 0660 | Pave striping-thermo-4 in W | LF A | 7,574 | $0.90 | $0.93 |
| 0670 | Pave striping-thermo-4 in Y | LF A | 6,370 | $0.90 | $0.93 |
| 0680 | Pave striping-thermo-6 in W | LF A | 8,048 | $1.10 | $1.13 |
| 0690 | Pave striping-thermo-6 in Y | LF A | 4,947 | $1.10 | $1.13 |
| 0700 | Pave striping-thermo-12 in W | LF A | 939 | $5.00 | $5.15 |
| 0710 | Pave striping-thermo-12 in Y | LF A | 22 | $5.00 | $5.15 |
| 0720 | Pave marking-thermo stop bar-24IN | LF A | 95 | $12.00 | $12.36 |
| 0730 | Pave marking-thermo cross-hatch | SQFT A | 764 | $5.00 | $5.15 |
| 0740 | Pave marking-thermo curv arrow | EACH A | 8 | $120.00 | $123.60 |
| 0750 | Pave marking-thermo only | EACH A | 3 | $300.00 | $309.00 |
| 0760 | Inlaid pavement marker-B W/R | EACH A | 50 | $40.00 | $41.20 |
| 0770 | Crash cushion TY VI class B TL3 | EACH A | 2 | $42,650 | $46,504 |
| 0780 | Crash cushion TY VI class BT TL3 | EACH A | 2 | $7,176.23 | $7,391.52 |
| 0790 | Fuel adjustment | DOLL A | 44,221 | $1.00 | $1.00 |
| 0800 | Asphalt adjustment | DOLL A | 24,498 | $1.00 | $1.00 |
| 0810 | Joint adhesive | LF A | 2,941 | $1.75 | $1.80 |
| 0820 | Temporary pipe | LF A | 250 | $60.00 | $62.24 |
| 0830 | Object marker TY 3 | EACH A | 6 | $87.38 | $90.00 |
| 0840 | Sawcut pavement | LF A | 2,941 | $3.25 | $4.12 |
| 0850 | Longitudinal edge key | LF A | 2,941 | $6.90 | $6.97 |
| 0860 | G/R steel W beam-S face (7 FT post) | LF A | 2,075 | $32.42 | $33.39 |
| 0870 | Water blasting existing stripe | LF A | 3,500 | $0.75 | $0.77 |
| 0880 | Pave stripe-wet ref tape-6 in Y | LF A | 400 | $9.00 | $9.27 |
| 0890 | Pave stripe-wet ref tape-6 in W | LF A | 400 | $9.00 | $9.27 |
| 0900 | Object marker type 1 | EACH A | 2 | $340.45 | $1,051.99 |
| 0910 | Demolition | LS A | 1 | $5,000.00 | $17,500 |
| 0920 | Demolition | LS A | 1 | $5,000.00 | $10,000 |
| 0930 | Demolition | LS A | 1 | $5,000.00 | $10,000 |
| 0940 | Demolition | LS A | 1 | $5,000.00 | $7,500.00 |
| 0950 | Crushed aggregate size no 2 | TON A | 4 | $275.00 | $288.64 |
| 0960 | Culvert pipe-18 in | LF A | 153 | $152.00 | $117.94 |
| 0970 | Culvert pipe-24 in | LF A | 208 | $190.00 | $355.39 |
| 0980 | Storm sewer pipe-15 in | LF A | 251 | $342.75 | $372.46 |
| 0990 | Storm sewer pipe-18 in | LF A | 54 | $91.00 | $164.53 |
| 1000 | Storm sewer pipe-24 in | LF A | 105 | $135.00 | $252.45 |
| 1010 | Perforated pipe-4 in | LF A | 1,250 | $24.00 | $19.12 |
| 1020 | Non-perforated pipe-4 in | LF A | 650 | $26.00 | $24.94 |
| 1030 | Inspect & certify edge drain system | LS A | 1 | $2,500.00 | $2,575.00 |
| 1040 | Perf pipe headwall TY 3-4 in | EACH A | 4 | $1,200.00 | $923.61 |
| 1050 | Pipe culvert headwall-18 in | EACH A | 2 | $2,350.00 | $2,744.67 |
| 1060 | Pipe culvert headwall-24 in | EACH A | 2 | $2,445.00 | $3,422.47 |
| 1070 | S & F box inlet-outlet-18 in | EACH A | 1 | $3,765.00 | $3,916.81 |
| 1080 | Drop box inlet type 1 | EACH A | 1 | $4,825.00 | $7,892.82 |
| 1090 | Conc med barr box inlet TY B1 TL5 56 | EACH A | 2 | $20,580 | $13,680 |
| 1100 | Conc med barr box inlet TY B2 TL5 56 | EACH A | 1 | $18,800 | $16,588 |
| 1110 | Manhole type B | EACH A | 1 | $5,210.00 | $4,955.54 |
| 1120 | Fabric-geotextile class 2 for pipe | SQYD A | 847 | $2.00 | $2.00 |
| 1130 | Bore and jack pipe-24 in | LF A | 98 | $1,015.00 | $658.67 |
| 1140 | Cored hole drainage box con | EACH A | 1 | $2,750.00 | $3,214.63 |
| 1150 | Pipeline inspection | LF A | 869 | $2.88 | $2.97 |
| 1160 | Granular embankment | CUYD A | 330 | $83.00 | $80.02 |
| 1170 | Structure excav-solid rock | CUYD A | 13 | $125.00 | $123.31 |
| 1180 | Foundation preparation | LS A | 1 | $48,000 | $45,186 |
| 1190 | Concrete-class A | CUYD A | 563.40 | $925.00 | $843.57 |
| 1200 | Steel reinforcement | LB A | 52,358 | $1.59 | $1.80 |
| 1210 | SBM alum sheet signs .080 in | SQFT A | 386 | $46.21 | $47.60 |
| 1220 | SBM alum sheet signs .125 in | SQFT A | 113 | $47.86 | $49.30 |
| 1230 | Steel post type 1 | LF A | 90 | $32.03 | $32.99 |
| 1240 | Steel post type 2 | LF A | 910 | $28.72 | $29.58 |
| 1250 | Remove & relocate signs | EACH A | 1 | $699.95 | $720.55 |
| 1260 | Barcode sign inventory | EACH A | 117 | $46.06 | $47.44 |
| 1270 | Mobilization | LS A | 1 | $202,100 | $147,463 |
| 1280 | Demobilization | LS A | 1 | $64,607 | $65,550 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of March 20, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.