KYTC contract 25-1019 bid tabulation
GRADE & DRAIN WITH ASPHALT SURFACE KY-55X AND KY-43. Let by Kentucky Transportation Cabinet on August 21, 2025. 4 bids received; low bid $1,096,531 by Louisville Paving Company Inc, -8.6% against the engineer's estimate of $1,199,094.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 21 AUG 2025
- Pay items
- 82
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Louisville Paving Company Inc | $1,096,531 | Low | -9.0% |
| 2 | Cleary Construction Inc | $1,295,000 | +18% | +8.0% |
| 3 | E & B Paving LLC | $1,342,000 | +22% | +12% |
| 4 | Rame Contracting LLC | $1,350,783 | +23% | +13% |
Engineer's estimate: $1,199,094.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Louisville Paving Company Inc | 2. Cleary Construction Inc | 3. E & B Paving LLC | 4. Rame Contracting LLC |
|---|---|---|---|---|---|---|---|
| 0010 | Crushed stone base | TON A A | 3,750 | $39.00 | $50.00 | $55.00 | $56.00 |
| 0020 | Asphalt seal aggregate | TON A A | 4.60 | $782.43 | $275.00 | $4,325.00 | $990.00 |
| 0030 | Asphalt seal coat | TON A A | 0.60 | $3,126.00 | $1,500.00 | $5,350.00 | $1,500.00 |
| 0040 | Leveling & wedging PG64-22 | TON A A | 150 | $90.00 | $95.50 | $153.00 | $105.00 |
| 0050 | CL3 asph base 1.00D PG64-22 | TON A A | 2,106 | $86.00 | $81.00 | $90.00 | $93.00 |
| 0060 | CL3 asph surf 0.38B PG64-22 | TON A A | 929 | $93.00 | $95.50 | $106.00 | $105.00 |
| 0070 | Joint adhesive | LF A A | 6,922 | $0.55 | $1.00 | $0.51 | $0.40 |
| 0080 | Asphalt material for tack non-tracking | TON A A | 3.90 | $0.01 | $500.00 | $636.00 | $1,000.00 |
| 0090 | Delineator for guardrail BI directional white | EACH A A | 11 | $14.30 | $14.30 | $14.30 | $14.30 |
| 0100 | Delineator for barrier wall-B/W | EACH A A | 20 | $15.13 | $25.78 | $15.13 | $15.13 |
| 0110 | Relocate temp conc barrier | LF A A | 1,340 | $15.00 | $15.00 | $8.00 | $17.03 |
| 0120 | Roadway excavation | CUYD A A | 2,081 | $37.00 | $65.00 | $63.50 | $52.50 |
| 0130 | Guardrail-steel W beam-S face | LF A A | 1,075 | $29.97 | $29.97 | $29.97 | $29.97 |
| 0140 | Remove guardrail | LF A A | 1,075 | $2.20 | $2.20 | $2.20 | $2.20 |
| 0150 | Guardrail end treatment type 4A | EACH A A | 2 | $3,636.24 | $3,636.24 | $3,636.24 | $3,636.24 |
| 0160 | Channel lining class III | TON A A | 114 | $75.00 | $85.00 | $107.00 | $78.00 |
| 0170 | Clearing and grubbing | LS A A | 1 | $22,000 | $38,000 | $24,000 | $6,500.00 |
| 0180 | Maintain & control traffic | LS A A | 1 | $131,561 | $125,000 | $105,000 | $115,000 |
| 0190 | Asphalt pave milling & texturing | TON A A | 504 | $21.04 | $39.60 | $32.00 | $35.00 |
| 0200 | Temp silt fence | LF A A | 2,768 | $1.85 | $2.08 | $2.00 | $4.50 |
| 0210 | Silt trap type A | EACH A A | 2 | $150.00 | $300.00 | $2,000.00 | $375.00 |
| 0220 | Silt trap type B | EACH A A | 2 | $150.00 | $175.00 | $2,400.00 | $375.00 |
| 0230 | Silt trap type C | EACH A A | 2 | $150.00 | $300.00 | $200.00 | $375.00 |
| 0240 | Clean silt trap type A | EACH A A | 2 | $150.00 | $0.01 | $750.00 | $50.00 |
| 0250 | Clean silt trap type B | EACH A A | 2 | $150.00 | $0.01 | $800.00 | $50.00 |
| 0260 | Clean silt trap type C | EACH A A | 2 | $150.00 | $0.01 | $500.00 | $50.00 |
| 0270 | Staking | LS A A | 1 | $25,000 | $50,000 | $46,000 | $30,000 |
| 0280 | Conc barrier wall type 9T | LF A A | 1,420 | $20.00 | $58.00 | $37.50 | $90.00 |
| 0290 | Erosion control blanket | SQYD A A | 2,566 | $2.49 | $2.49 | $2.25 | $2.49 |
| 0300 | Temp mulch | SQYD A A | 5,340 | $0.34 | $0.34 | $0.30 | $0.34 |
| 0310 | Temp seeding and protection | SQYD A A | 4,005 | $0.36 | $0.36 | $0.40 | $0.36 |
| 0320 | Initial fertilizer | TON A A | 0.41 | $1,544.21 | $1,544.22 | $900.00 | $1,544.22 |
| 0330 | Maintenance fertilizer | TON A A | 0.25 | $1,544.21 | $1,544.20 | $600.00 | $1,544.20 |
| 0340 | Seeding and protection | SQYD A A | 8,010 | $0.61 | $0.61 | $0.45 | $0.10 |
| 0350 | Agricultural limestone | TON A A | 5 | $68.48 | $68.48 | $900.00 | $68.48 |
| 0360 | Pave striping-temp paint-6 in | LF A A | 12,000 | $0.30 | $0.26 | $0.30 | $0.26 |
| 0370 | Pave striping-perm paint-6 in | LF A A | 2,966 | $0.35 | $0.28 | $0.35 | $0.28 |
| 0380 | Pave striping-thermo-6 in W | LF A A | 3,312 | $1.50 | $1.35 | $1.50 | $1.35 |
| 0390 | Pave striping-thermo-6 in Y | LF A A | 3,688 | $1.50 | $1.35 | $1.50 | $1.35 |
| 0400 | Pave striping-temp rem tape-W | LF A A | 1,000 | $3.00 | $2.50 | $3.00 | $2.50 |
| 0410 | Pave striping-temp rem tape-Y | LF A A | 500 | $3.00 | $2.50 | $3.00 | $2.50 |
| 0420 | Pave marking-thermo stop bar-24IN | LF A A | 128 | $12.00 | $12.50 | $12.00 | $12.50 |
| 0430 | Pave marking-thermo curv arrow | EACH A A | 18 | $100.00 | $145.00 | $100.00 | $145.00 |
| 0440 | Pave marking-thermo comb arrow | EACH A A | 4 | $125.00 | $175.00 | $125.00 | $175.00 |
| 0450 | Crash cushion TY 6 class T TL2 | EACH A A | 4 | $6,607.22 | $6,607.22 | $6,607.22 | $6,607.22 |
| 0460 | Object marker TY 3 | EACH A A | 2 | $52.38 | $52.38 | $52.38 | $52.38 |
| 0470 | Longitudinal edge key | LF A A | 3,413 | $4.00 | $5.00 | $11.88 | $5.75 |
| 0480 | Water blasting existing stripe | LF A A | 2,752 | $1.50 | $1.28 | $1.50 | $2.40 |
| 0490 | Pave marking-thermo dotted lane exten | LF A A | 70 | $8.00 | $3.25 | $8.00 | $3.25 |
| 0500 | Longitudinal saw cut | LF A A | 3,413 | $1.37 | $1.78 | $1.55 | $4.50 |
| 0510 | Thrie beam guardrail transition TL-3 | EACH A A | 2 | $2,974.01 | $2,974.01 | $2,974.01 | $4,425.00 |
| 0520 | Pave stripe-wet ref cont tape-6 in W | LF A A | 610 | $10.00 | $18.00 | $10.00 | $18.00 |
| 0530 | Pave stripe-wet ref cont tape-6 in Y | LF A A | 180 | $10.00 | $18.00 | $10.00 | $18.00 |
| 0540 | Electronic delivery MGMT system - agg | LS A A | 1 | $0.01 | $1.48 | $1.00 | $475.00 |
| 0550 | Culvert pipe-30 in | LF A A | 70.30 | $162.00 | $190.00 | $330.00 | $200.00 |
| 0560 | S & F box inlet-outlet-30 in | EACH A A | 2 | $7,000.00 | $6,000.00 | $7,800.00 | $9,450.00 |
| 0570 | Junction box-54 in | EACH A A | 1 | $3,250.00 | $4,000.00 | $7,400.00 | $7,000.00 |
| 0580 | Channel lining class III | TON A A | 118 | $69.00 | $80.00 | $107.00 | $78.00 |
| 0590 | Temporary signs | SQFT A A | 150 | $6.36 | $5.50 | $6.36 | $9.50 |
| 0600 | SBM alum sheet signs .080 in | SQFT A A | 144 | $36.72 | $36.72 | $36.72 | $36.72 |
| 0610 | SBM alum sheet signs .125 in | SQFT A A | 78 | $38.38 | $38.38 | $38.38 | $38.38 |
| 0620 | Steel post type 1 | LF A A | 470 | $23.03 | $23.03 | $23.03 | $23.03 |
| 0630 | Steel post mile markers | EACH A A | 2 | $298.75 | $298.75 | $298.75 | $289.75 |
| 0640 | Remove-store and reinstall sign | EACH A A | 3 | $328.00 | $328.00 | $328.00 | $328.00 |
| 0650 | Barcode sign inventory | EACH A A | 37 | $27.09 | $227.09 | $27.09 | $27.09 |
| 0660 | Trenching and backfilling | LF A A | 40 | $17.13 | $9.39 | $9.39 | $9.39 |
| 0670 | Cable-no. 14/5C | LF A A | 825 | $2.72 | $2.71 | $2.71 | $2.71 |
| 0680 | Cable-no. 14/7C | LF A A | 420 | $3.07 | $3.07 | $3.07 | $3.07 |
| 0690 | Messenger-15400 LB | LF A A | 500 | $6.15 | $8.94 | $8.94 | $8.94 |
| 0700 | Install steel strain pole | EACH A A | 4 | $14,235 | $1,820.09 | $1,820.09 | $1,820.09 |
| 0710 | Temp relocation of signal head | EACH A A | 8 | $215.00 | $894.43 | $894.43 | $894.43 |
| 0720 | Install LED signal-3 section | EACH A A | 10 | $750.00 | $671.15 | $671.15 | $671.15 |
| 0730 | Remove & reinstall coordinating unit | EACH A A | 1 | $2,500.00 | $1,762.00 | $1,762.00 | $1,762.00 |
| 0740 | Traffic signal pole base | CUYD A A | 18 | $300.00 | $1,781.46 | $1,781.46 | $1,781.46 |
| 0750 | Tether wire | LF A A | 500 | $2.57 | $7.25 | $7.25 | $7.25 |
| 0760 | PVC conduit-2 in-schedule 80 | LF A A | 100 | $1.60 | $7.11 | $7.11 | $7.11 |
| 0770 | Install signal controller-TY atc | EACH A A | 1 | $8,000.00 | $13,983 | $13,983 | $13,983 |
| 0780 | Remove signal equipment | EACH A A | 1 | $5,000.00 | $3,584.21 | $3,584.21 | $3,584.21 |
| 0790 | Install radar presence detector type A | EACH A A | 4 | $1,600.00 | $1,007.61 | $1,007.61 | $1,007.61 |
| 0800 | Install radar advance detector type B | EACH A A | 2 | $1,600.00 | $1,007.61 | $1,007.61 | $1,007.61 |
| 0810 | Demobilization | LS A A | 1 | $16,448 | $19,569 | $20,334 | $19,962 |
| 0820 | Mobilization for mill & text | LS A A | 1 | $3,500.00 | $1,500.00 | $10,000 | $15,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of August 21, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.