KYTC contract 25-2143 bid tabulation
FLOOD REPAIR FOR FEMA KY 721 & KY 1102 FEMA SLIDE REPAIRS. Let by Kentucky Transportation Cabinet on March 20, 2025, Knott, District 11. 2 bids received; low bid $1,137,239 by Hinkle Environmental Services LLC, -28% against the engineer's estimate of $1,583,952.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 20 MAR 2025
- Pay items
- 41
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Hinkle Environmental Services LLC | $1,137,239 | Low | -28% |
| 2 | Nattco Inc | $1,222,064 | +7.0% | -23% |
Engineer's estimate: $1,583,952.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Hinkle Environmental Services LLC | 2. Nattco Inc |
|---|---|---|---|---|---|
| 0010 | Dga base | TON A | 535 | $60.00 | $175.00 |
| 0020 | Delineator for guardrail BI directional white | EACH A | 63 | $13.00 | $10.00 |
| 0030 | Site preparation | EACH A | 1 | $6,300.00 | $2,500.00 |
| 0040 | Site preparation | EACH A | 1 | $6,300.00 | $2,500.00 |
| 0050 | Site preparation | EACH A | 1 | $2,700.00 | $2,500.00 |
| 0060 | Site preparation | EACH A | 1 | $2,700.00 | $2,500.00 |
| 0070 | Site preparation | EACH A | 1 | $900.00 | $2,500.00 |
| 0080 | Site preparation | EACH A | 1 | $900.00 | $2,500.00 |
| 0090 | Site preparation | EACH A | 1 | $1,800.00 | $2,500.00 |
| 0100 | Site preparation | EACH A | 1 | $5,400.00 | $2,500.00 |
| 0110 | Site preparation | EACH A | 1 | $3,600.00 | $2,500.00 |
| 0120 | Site preparation | EACH A | 1 | $1,800.00 | $2,500.00 |
| 0130 | Site preparation | EACH A | 1 | $8,100.00 | $2,500.00 |
| 0140 | Guardrail-steel W beam-S face | LF A | 237.50 | $67.50 | $50.00 |
| 0150 | Guardrail terminal section no 1 | EACH A | 1 | $115.00 | $100.00 |
| 0160 | Guardrail end treatment type 7 | EACH A | 8 | $1,900.00 | $2,000.00 |
| 0170 | Remove & reset guardrail | LF A | 2,337.50 | $23.50 | $30.00 |
| 0180 | Remove guardrail end treatment | EACH A | 3 | $750.00 | $500.00 |
| 0190 | Channel lining class II | TON A | 210 | $70.00 | $125.00 |
| 0200 | Channel lining class III | TON A | 868 | $68.00 | $150.00 |
| 0210 | Temporary signs | SQFT A | 700 | $8.00 | $2.50 |
| 0220 | Maintain & control traffic | LS A | 1 | $62,500 | $46,000 |
| 0230 | Railroad rails-drilled | LF A | 15,210 | $28.00 | $24.00 |
| 0240 | Excavation and backfill | CUYD A | 1,987 | $85.00 | $100.00 |
| 0250 | Cribbing | SQFT A | 9,947 | $10.00 | $12.00 |
| 0260 | Erosion control | LS A | 1 | $2,130.00 | $50.00 |
| 0270 | Erosion control | LS A | 1 | $4,970.00 | $50.00 |
| 0280 | Erosion control | LS A | 1 | $4,970.00 | $50.00 |
| 0290 | Erosion control | LS A | 1 | $2,130.00 | $50.00 |
| 0300 | Erosion control | LS A | 1 | $710.00 | $50.00 |
| 0310 | Erosion control | LS A | 1 | $710.00 | $50.00 |
| 0320 | Erosion control | LS A | 1 | $4,260.00 | $50.00 |
| 0330 | Erosion control | LS A | 1 | $2,840.00 | $50.00 |
| 0340 | Erosion control | LS A | 1 | $1,420.00 | $50.00 |
| 0350 | Erosion control | LS A | 1 | $1,420.00 | $50.00 |
| 0360 | Erosion control | LS A | 1 | $6,390.00 | $50.00 |
| 0370 | Excavation | CUYD A | 336 | $40.00 | $75.00 |
| 0380 | Maintain & control traffic | LS A | 1 | $62,500 | $46,000 |
| 0390 | Fabric-geotextile class 1 | SQYD A | 1,198 | $3.00 | $5.00 |
| 0400 | Fabric-geotextile class 1 | SQYD A | 3,513 | $3.00 | $5.00 |
| 0410 | Demobilization | LS A | 1 | $17,200 | $18,100 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of March 20, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.