KYTC contract 25-2240 bid tabulation
FLOOD REPAIR FOR FEMA FEMA FLOOD REPAIRS KY 1862, KY 3402, & KY 3410. Let by Kentucky Transportation Cabinet on May 22, 2025. 3 bids received; low bid $1,114,495 by Nattco Inc, -26% against the engineer's estimate of $1,506,088.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 22 MAY 2025
- Pay items
- 65
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Nattco Inc | $1,114,495 | Low | -26% |
| 2 | Hinkle Environmental Services LLC | $1,189,602 | +7.0% | -21% |
| 3 | Blue Rock LLC | $1,258,608 | +13% | -16% |
Engineer's estimate: $1,506,088.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Nattco Inc | 2. Hinkle Environmental Services LLC | 3. Blue Rock LLC |
|---|---|---|---|---|---|---|
| 0010 | Dga base | TON A A | 331 | $75.00 | $95.00 | $90.00 |
| 0020 | Delineator for guardrail BI directional white | EACH A A | 47 | $15.00 | $15.00 | $20.00 |
| 0030 | Site preparation | EACH A A | 1 | $2,300.00 | $800.00 | $2,000.00 |
| 0040 | Site preparation | EACH A A | 1 | $2,300.00 | $800.00 | $2,000.00 |
| 0050 | Site preparation | EACH A A | 1 | $2,300.00 | $1,600.00 | $2,000.00 |
| 0060 | Site preparation | EACH A A | 1 | $2,300.00 | $1,600.00 | $2,000.00 |
| 0070 | Site preparation | EACH A A | 1 | $2,300.00 | $4,000.00 | $2,000.00 |
| 0080 | Site preparation | EACH A A | 1 | $2,300.00 | $800.00 | $2,000.00 |
| 0090 | Site preparation | EACH A A | 1 | $2,300.00 | $800.00 | $2,000.00 |
| 0100 | Site preparation | EACH A A | 1 | $2,300.00 | $800.00 | $2,000.00 |
| 0110 | Site preparation | EACH A A | 1 | $2,300.00 | $800.00 | $2,000.00 |
| 0120 | Site preparation | EACH A A | 1 | $2,300.00 | $800.00 | $2,000.00 |
| 0130 | Site preparation | EACH A A | 1 | $2,300.00 | $4,800.00 | $2,000.00 |
| 0140 | Site preparation | EACH A A | 1 | $2,300.00 | $1,600.00 | $2,000.00 |
| 0150 | Site preparation | EACH A A | 1 | $2,300.00 | $3,200.00 | $2,000.00 |
| 0160 | Site preparation | EACH A A | 1 | $2,300.00 | $3,200.00 | $2,000.00 |
| 0170 | Site preparation | EACH A A | 1 | $2,300.00 | $2,400.00 | $2,000.00 |
| 0180 | Site preparation | EACH A A | 1 | $2,300.00 | $8,000.00 | $2,000.00 |
| 0190 | Site preparation | EACH A A | 1 | $2,300.00 | $1,600.00 | $2,000.00 |
| 0200 | Site preparation | EACH A A | 1 | $2,300.00 | $1,600.00 | $2,000.00 |
| 0210 | Site preparation | EACH A A | 1 | $2,300.00 | $800.00 | $2,000.00 |
| 0220 | Site preparation | EACH A A | 1 | $2,300.00 | $800.00 | $2,000.00 |
| 0230 | Site preparation | EACH A A | 1 | $2,300.00 | $1,600.00 | $2,000.00 |
| 0240 | Site preparation | EACH A A | 1 | $2,300.00 | $800.00 | $2,000.00 |
| 0250 | Guardrail-steel W beam-S face | LF A A | 1,137.50 | $35.00 | $35.00 | $47.50 |
| 0260 | Guardrail end treatment type 1 | EACH A A | 2 | $4,000.00 | $4,000.00 | $5,000.00 |
| 0270 | Guardrail end treatment type 7 | EACH A A | 21 | $1,500.00 | $1,500.00 | $2,000.00 |
| 0280 | Remove & reset guardrail | LF A A | 775 | $20.00 | $20.00 | $50.00 |
| 0290 | Remove guardrail end treatment | EACH A A | 12 | $100.00 | $800.00 | $1,750.00 |
| 0300 | Channel lining class II | TON A A | 300 | $75.00 | $95.00 | $100.00 |
| 0310 | Channel lining class III | TON A A | 1,208 | $75.00 | $90.00 | $105.00 |
| 0320 | Temporary signs | SQFT A A | 1,050 | $2.00 | $7.50 | $6.00 |
| 0330 | Railroad rails-drilled | LF A A | 16,347 | $25.00 | $27.50 | $25.00 |
| 0340 | Excavation and backfill | CUYD A A | 1,342 | $90.00 | $90.00 | $100.00 |
| 0350 | Cribbing | SQFT A A | 8,916 | $10.00 | $10.00 | $10.00 |
| 0360 | Erosion control | LS A A | 1 | $50.00 | $50.00 | $250.00 |
| 0370 | Erosion control | LS A A | 1 | $50.00 | $50.00 | $250.00 |
| 0380 | Erosion control | LS A A | 1 | $50.00 | $50.00 | $250.00 |
| 0390 | Erosion control | LS A A | 1 | $50.00 | $50.00 | $250.00 |
| 0400 | Erosion control | LS A A | 1 | $50.00 | $50.00 | $250.00 |
| 0410 | Erosion control | LS A A | 1 | $50.00 | $50.00 | $250.00 |
| 0420 | Erosion control | LS A A | 1 | $50.00 | $50.00 | $250.00 |
| 0430 | Erosion control | LS A A | 1 | $50.00 | $50.00 | $250.00 |
| 0440 | Erosion control | LS A A | 1 | $50.00 | $50.00 | $250.00 |
| 0450 | Erosion control | LS A A | 1 | $50.00 | $50.00 | $250.00 |
| 0460 | Erosion control | LS A A | 1 | $50.00 | $50.00 | $250.00 |
| 0470 | Erosion control | LS A A | 1 | $50.00 | $50.00 | $250.00 |
| 0480 | Erosion control | LS A A | 1 | $50.00 | $50.00 | $250.00 |
| 0490 | Erosion control | LS A A | 1 | $50.00 | $50.00 | $250.00 |
| 0500 | Erosion control | LS A A | 1 | $50.00 | $50.00 | $250.00 |
| 0510 | Erosion control | LS A A | 1 | $50.00 | $50.00 | $250.00 |
| 0520 | Erosion control | LS A A | 1 | $50.00 | $50.00 | $250.00 |
| 0530 | Erosion control | LS A A | 1 | $50.00 | $50.00 | $250.00 |
| 0540 | Erosion control | LS A A | 1 | $50.00 | $50.00 | $250.00 |
| 0550 | Erosion control | LS A A | 1 | $50.00 | $50.00 | $250.00 |
| 0560 | Erosion control | LS A A | 1 | $50.00 | $50.00 | $250.00 |
| 0570 | Excavation | CUYD A A | 166 | $50.00 | $50.00 | $95.00 |
| 0580 | Excavation | CUYD A A | 302 | $50.00 | $50.00 | $95.00 |
| 0590 | Maintain & control traffic | EACH A A | 1 | $50,000 | $50,000 | $40,000 |
| 0600 | Maintain & control traffic | EACH A A | 1 | $50,000 | $50,000 | $40,000 |
| 0610 | Maintain & control traffic | EACH A A | 1 | $50,000 | $50,000 | $40,000 |
| 0620 | Fabric-geotextile class 1 | SQYD A A | 1,692 | $4.00 | $3.00 | $3.00 |
| 0630 | Fabric-geotextile class 1 | SQYD A A | 2,150 | $4.00 | $3.00 | $3.00 |
| 0640 | Fabric-geotextile class 1 | SQYD A A | 562 | $4.00 | $3.00 | $3.00 |
| 0650 | Demobilization | LS A A | 1 | $16,471 | $17,600 | $40,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of May 22, 2025. Compiled by Mirage Metrics.