KYTC contract 25-2365 bid tabulation

FLOOD REPAIR FOR FEMA KY 343, KY 588, KY 1148, KY 1410, KY 1811, KY 2034 & KY 2035. Let by Kentucky Transportation Cabinet on October 23, 2025. 3 bids received; low bid $972,815 by Blue Rock LLC, -12% against the engineer's estimate of $1,110,786.

Owner
Kentucky Transportation Cabinet
Letting
23 OCT 2025
Pay items
37
Data through
22 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Blue Rock LLC$972,815Low-12%
2Nattco Inc$1,009,417+4.0%-9.0%
3Hinkle Environmental Services LLC$1,065,459+10%-4.0%
KYTC contract 25-2365: bids by rank

Engineer's estimate: $1,110,786.

Bid tabulation

LinePay itemUnitQuantity1. Blue Rock LLC2. Nattco Inc3. Hinkle Environmental Services LLC
0010Dga baseTON A A307$90.00$100.00$90.00
0020Delineator for guardrail BI directional whiteEACH A A66$22.00$20.00$14.00
0030Site preparationEACH A A1$2,500.00$9,950.00$6,000.00
0040Site preparationEACH A A1$2,500.00$9,950.00$6,000.00
0050Site preparationEACH A A1$2,500.00$9,950.00$6,000.00
0060Site preparationEACH A A1$2,500.00$9,950.00$6,000.00
0070Site preparationEACH A A1$2,000.00$9,950.00$6,000.00
0080Site preparationEACH A A1$2,000.00$9,950.00$6,000.00
0090Site preparationEACH A A1$2,000.00$9,950.00$6,000.00
0100Guardrail-steel W beam-S faceLF A A737.50$41.00$37.00$36.00
0110Guardrail end treatment type 1EACH A A1$5,500.00$5,000.00$4,075.00
0120Guardrail end treatment type 7EACH A A15$2,097.00$1,500.00$1,525.00
0130Remove & reset guardrailLF A A1,300$21.37$15.00$15.50
0140Remove guardrail end treatmentEACH A A2$200.00$100.00$150.00
0160Channel lining class IITON A A193$90.00$95.00$104.00
0170Channel lining class IIITON A A766$95.00$100.00$82.00
0180Temporary signsSQFT A A2,450$6.00$2.50$8.00
0190Fabric-geotextile class 1SQYD A A3,716$4.00$4.00$3.00
0200Maintain & control trafficLS A A1$11,500$12,775$20,000
0210Maintain & control trafficLS A A1$11,500$12,775$20,000
0220Maintain & control trafficLS A A1$11,500$12,775$20,000
0230Maintain & control trafficLS A A1$11,500$12,775$20,000
0240Maintain & control trafficLS A A1$13,500$12,775$20,000
0250Maintain & control trafficLS A A1$8,000.00$12,775$20,000
0260Maintain & control trafficLS A A1$8,000.00$12,775$20,000
0270Railroad rails-drilledLF A A15,015$25.00$24.00$27.25
0280Excavation and backfillCUYD A A1,475$80.00$95.00$80.00
0290CribbingSQFT A A9,872$10.00$10.00$10.75
0300Erosion controlLS A A1$2,000.00$100.00$100.00
0310Erosion controlLS A A1$2,000.00$100.00$100.00
0320Erosion controlLS A A1$2,000.00$100.00$100.00
0330Erosion controlLS A A1$2,000.00$100.00$100.00
0340Erosion controlLS A A1$3,500.00$100.00$100.00
0345Erosion controlLS A A1$2,500.00$100.00$100.00
0350Erosion controlLS A A1$1,500.00$100.00$100.00
0360ExcavationCUYD A A289$40.00$45.00$60.00
0370DemobilizationLS A A1$18,000$15,000$16,000
KYTC contract 25-2365: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.

Every contract let that day: KYTC letting of October 23, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy