KYTC contract 25-2413 bid tabulation
PAVEMENT (WITH ALTERNATES) KY 1072 & KY 1303 IN KENTON COUNTY. Let by Kentucky Transportation Cabinet on December 11, 2025. 3 bids received; low bid $602,750 by Riegler Blacktop Inc, +4.2% against the engineer's estimate of $578,255.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 11 DEC 2025
- Pay items
- 28
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Riegler Blacktop Inc | $602,750 | Low | +4.0% |
| 2 | Eaton Asphalt Paving Co Inc | $613,174 | +2.0% | +6.0% |
| 3 | Strawser Construction Inc | $718,945 | +19% | +24% |
Engineer's estimate: $578,255.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Riegler Blacktop Inc | 2. Eaton Asphalt Paving Co Inc | 3. Strawser Construction Inc |
|---|---|---|---|---|---|---|
| 0010 | Asphalt material for tack | TON A A | 36 | $1.00 | $1.00 | |
| 0020 | Mobilization for mill & text | LS A A | 1 | $5,000.00 | $3,275.00 | |
| 0030 | Mobilization for mill & text | LS A A | 1 | $5,000.00 | $3,275.00 | |
| 0040 | Pave striping-temp paint-4 in | LF A A | 10,000 | $0.20 | $0.35 | |
| 0050 | CL2 asph surf no.4D PG64-22 | TON A A | 575 | $107.00 | $130.00 | |
| 0060 | CL3 asph surf no.4B PG64-22 | TON A A | 2,870 | $122.00 | $123.75 | |
| 0070 | Fine milling | SQYD A A | 8,945 | $4.50 | $4.35 | |
| 0080 | Pave striping-temp paint-4 in | LF A A | 68,400 | $0.20 | ||
| 0090 | Microsurfacing-leveling course | SQYD A A | 13,700 | $3.52 | ||
| 0100 | Microsurfacing-surface course - type B | SQYD A A | 69,571 | $3.28 | ||
| 0110 | Microsurfacing-surface course - type D | SQYD A A | 13,700 | $4.04 | ||
| 0120 | Microsurfacing-leveling course | SQYD A A | 69,571 | $2.61 | ||
| 0130 | Temporary signs | SQFT A A | 600 | $9.75 | $5.00 | $15.00 |
| 0140 | Maintain & control traffic | LS A A | 1 | $4,000.00 | $10,800 | $18,000 |
| 0150 | Maintain & control traffic | LS A A | 1 | $11,000 | $15,125 | $48,000 |
| 0160 | Portable changeable message sign | EACH A A | 4 | $900.00 | $1,225.00 | $860.00 |
| 0170 | Arrow panel | EACH A A | 4 | $550.00 | $200.00 | $600.00 |
| 0180 | Pave striping-perm paint-6 in | LF A A | 63,840 | $0.30 | $0.35 | $0.35 |
| 0190 | Pave marking-thermo X-walk-6 in | LF A A | 1,232 | $6.00 | $4.50 | $7.00 |
| 0200 | Pave marking-thermo stop bar-24IN | LF A A | 332 | $10.00 | $13.00 | $11.50 |
| 0210 | Pave marking-thermo curv arrow | EACH A A | 54 | $125.00 | $123.00 | $145.00 |
| 0220 | Pave marking-thermo comb arrow | EACH A A | 4 | $150.00 | $185.00 | $175.00 |
| 0230 | Pave marking thermo-bike | EACH A A | 43 | $250.00 | $265.00 | $290.00 |
| 0240 | Pave mark temp paint stop bar-24 in | LF A A | 332 | $5.00 | $9.50 | $5.75 |
| 0250 | Overband crack sealing | LB A A | 17,500 | $2.70 | $1.75 | $2.00 |
| 0260 | Pave marking thermo-bike lane arrow | EACH A A | 43 | $140.00 | $126.00 | $165.00 |
| 0270 | Pave mark thermo chevron | SQFT A A | 36 | $7.00 | $6.85 | $8.05 |
| 0280 | Demobilization | LS A A | 1 | $9,000.00 | $9,215.00 | $11,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of December 11, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.