KYTC contract 25-1127 bid tabulation
ASPHALT REHAB WITH BRIDGE (S) KY-180. Let by Kentucky Transportation Cabinet on December 11, 2025. 1 bid received; low bid $4,456,702 by Mountain Enterprises Inc, +3.1% against the engineer's estimate of $4,321,717.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 11 DEC 2025
- Pay items
- 98
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Mountain Enterprises Inc | $4,456,702 | Low | +3.0% |
Engineer's estimate: $4,321,717.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Mountain Enterprises Inc |
|---|---|---|---|---|
| 0010 | Dga base | TON A A | 1,191 | $49.75 |
| 0020 | Asphalt seal aggregate | TON A A | 132 | $133.50 |
| 0030 | Asphalt seal coat | TON A A | 16 | $825.00 |
| 0040 | Leveling & wedging PG76-22 | TON A A | 500 | $126.25 |
| 0050 | CL2 asph base 1.00D PG64-22 | TON A A | 2,589 | $104.10 |
| 0060 | CL3 asph base 1.00D PG76-22 | TON A A | 7,501 | $113.75 |
| 0070 | CL2 asph surf 0.38D PG64-22 | TON A A | 1,295 | $126.25 |
| 0080 | CL3 asph surf 0.38B PG76-22 | TON A A | 6,810 | $139.75 |
| 0090 | JPC pavement-10 in | SQYD A A | 8 | $445.50 |
| 0100 | Remove pavement | SQYD A A | 8 | $129.75 |
| 0110 | Saw-clean-reseal tverse joint | LF A A | 5,488 | $5.00 |
| 0120 | Saw-clean-reseal longit joint | LF A A | 5,899 | $5.00 |
| 0130 | Mobilization for mill & text | LS A A | 1 | $4,500.00 |
| 0140 | Asphalt pave milling & texturing | TON A A | 15,789 | $21.10 |
| 0150 | Edgeline rumble strips | LF A A | 36,800 | $0.19 |
| 0160 | Joint adhesive | LF A A | 26,357 | $0.44 |
| 0170 | Longitudinal edge key | LF A A | 300 | $26.50 |
| 0180 | Pave mount infrared temp equipment | SF A A | 738,756 | $0.03 |
| 0190 | Asphalt material for tack non-tracking | TON A A | 52 | $650.00 |
| 0200 | Electronic delivery MGMT system - agg | LS A A | 1 | $1,250.00 |
| 0210 | Non-perforated pipe-4 in | LF A A | 15 | $52.35 |
| 0220 | Adjust inlet | EACH A A | 1 | $5,780.00 |
| 0230 | Cored hole drainage box con-4 in | EACH A A | 1 | $789.80 |
| 0240 | Remove curb and gutter | LF A A | 50 | $18.00 |
| 0250 | Lip curb and gutter | LF A A | 50 | $121.50 |
| 0260 | Delineator for guardrail mono directional white | EACH A A | 90 | $13.00 |
| 0270 | Delineator for guardrail BI directional white | EACH A A | 49 | $13.00 |
| 0280 | Barricade-type III | EACH A A | 10 | $360.00 |
| 0290 | Roadway excavation | CUYD A A | 894 | $48.80 |
| 0300 | Guardrail terminal section no 1 | EACH A A | 1 | $85.00 |
| 0310 | Guardrail end treatment type 1 | EACH A A | 10 | $3,500.00 |
| 0320 | Guardrail end treatment type 2M | EACH A A | 7 | $2,300.00 |
| 0330 | Remove guardrail | LF A A | 6,025 | $3.75 |
| 0340 | Channel lining class II | TON A A | 20 | $127.10 |
| 0350 | Temporary signs | SQFT A A | 800 | $12.75 |
| 0360 | Maintain & control traffic | LS A A | 1 | $132,250 |
| 0370 | Truck mounted attenuator | EACH A A | 2 | $19,150 |
| 0380 | Portable changeable message sign | EACH A A | 2 | $4,350.00 |
| 0390 | Temp silt fence | LF A A | 500 | $4.20 |
| 0400 | Silt trap type B | EACH A A | 5 | $306.25 |
| 0410 | Silt trap type C | EACH A A | 5 | $414.15 |
| 0420 | Staking | LS A A | 1 | $32,250 |
| 0430 | Erosion control blanket | SQYD A A | 1,500 | $2.00 |
| 0440 | Steel post mile markers | EACH A A | 4 | $350.00 |
| 0450 | Pave striping-temp paint-6 in | LF A A | 57,419 | $0.24 |
| 0460 | Pave striping-thermo-6 in W | LF A A | 29,914 | $1.05 |
| 0470 | Pave striping-thermo-6 in Y | LF A A | 22,572 | $1.05 |
| 0480 | Pave striping-thermo-12 in Y | LF A A | 1,152 | $3.00 |
| 0490 | Pave striping-temp rem tape-B | LF A A | 3,000 | $3.00 |
| 0500 | Pave striping-temp rem tape-W | LF A A | 1,500 | $3.00 |
| 0510 | Pave striping-temp rem tape-Y | LF A A | 1,500 | $3.00 |
| 0520 | Pave striping-dur TY 1-6 in W | LF A A | 3,244 | $8.00 |
| 0530 | Pave striping-dur TY 1-6 in Y | LF A A | 1,689 | $8.00 |
| 0540 | Pave striping-dur TY 1-12 in Y | LF A A | 56 | $16.00 |
| 0550 | Pave marking-thermo stop bar-24IN | LF A A | 422 | $10.00 |
| 0560 | Pave marking-thermo curv arrow | EACH A A | 38 | $100.00 |
| 0570 | Remove pavement marker type V | EACH A A | 90 | $16.70 |
| 0580 | Inlaid pavement marker-MW | EACH A A | 99 | $35.00 |
| 0590 | Inlaid pavement marker-by | EACH A A | 189 | $35.00 |
| 0600 | Inlaid pavement marker-B W/R | EACH A A | 259 | $35.00 |
| 0610 | Fuel adjustment | DOLL A A | 29,079 | $1.00 |
| 0620 | Asphalt adjustment | DOLL A A | 73,039 | $1.00 |
| 0630 | Law enforcement officer | HOUR A A | 120 | $85.00 |
| 0640 | Remove & relocate signs | EACH A A | 1 | $300.00 |
| 0650 | Remove crash cushion | EACH A A | 4 | $1,000.00 |
| 0660 | Remove perf pipe headwall | EACH A A | 1 | $592.00 |
| 0670 | G/R steel W beam-S face (7 FT post) | LF A A | 5,375 | $28.50 |
| 0680 | Water blasting existing stripe | LF A A | 5,000 | $1.00 |
| 0690 | Pave mark TY 1 tape stop bar-24 in | LF A A | 160 | $40.00 |
| 0700 | Pave mark TY 1 tape-curv arrow | EACH A A | 11 | $475.00 |
| 0710 | Pave mark thermo-lane reduction arrow | EACH A A | 2 | $150.00 |
| 0720 | Crash cushion TY 6 class C TL3 | EACH A A | 4 | $39,250 |
| 0730 | Remove concrete median barrier end | EACH A A | 4 | $3,475.00 |
| 0740 | Pave marking-thermo dotted lane exten | LF A A | 104 | $7.00 |
| 0750 | Partial depth patching-polymer mod | CUFT A A | 20 | $2,040.00 |
| 0760 | Thrie beam guardrail transition TL-3 | EACH A A | 4 | $3,600.00 |
| 0770 | Pave mark TY 1 tape chevron | SQFT A A | 192 | $16.00 |
| 0780 | Mobilization for concrete surf treatment | LS A A | 1 | $5,500.00 |
| 0790 | Connected arrow panel | MONT A A | 10 | $825.00 |
| 0800 | Concrete-class A | CUYD A A | 37.50 | $2,130.00 |
| 0810 | Steel reinforcement | LB A A | 3,031 | $4.55 |
| 0820 | Concrete sealing | SQFT A A | 890 | $6.05 |
| 0830 | Concrete-class A | CUYD A A | 44.50 | $2,130.00 |
| 0840 | Steel reinforcement | LB A A | 3,023 | $4.55 |
| 0850 | Concrete sealing | SQFT A A | 930 | $6.05 |
| 0860 | Install radar presence detector type A | EACH A A | 6 | $1,366.00 |
| 0870 | Install radar advance detector type B | EACH A A | 4 | $1,366.00 |
| 0880 | Conduit-1 1/4 in | LF A A | 80 | $26.77 |
| 0890 | Conduit-2 in | LF A A | 20 | $36.66 |
| 0900 | Trenching and backfilling | LF A A | 90 | $10.52 |
| 0910 | Piezoelectric sensor | EACH A A | 4 | $3,869.00 |
| 0920 | Loop wire | LF A A | 1,650 | $1.89 |
| 0930 | Loop saw slot and fill | LF A A | 350 | $14.94 |
| 0940 | Galvanized steel cabinet | EACH A A | 2 | $2,569.00 |
| 0950 | Wood post | EACH A A | 4 | $742.00 |
| 0960 | Electrical junction box type A | EACH A A | 2 | $2,517.00 |
| 0970 | Mobilization | LS A A | 1 | $187,250 |
| 0980 | Demobilization | LS A A | 1 | $65,875 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of December 11, 2025. Compiled by Mirage Metrics.