KYTC contract 26-1506 bid tabulation
ASPHALT SURFACE WITH GRADE & DRAIN PEMBROKE OAK GROVE RD. (KY 115). Let by Kentucky Transportation Cabinet on March 26, 2026. 2 bids received; low bid $7,446,834 by Scotty'S Contracting & Stone LLC, -3.7% against the engineer's estimate of $7,734,910.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 26 MAR 2026
- Pay items
- 92
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Scotty'S Contracting & Stone LLC | $7,446,834 | Low | -4.0% |
| 2 | Rogers Group Inc | $7,623,145 | +2.0% | -1.0% |
Engineer's estimate: $7,734,910.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Scotty'S Contracting & Stone LLC | 2. Rogers Group Inc |
|---|---|---|---|---|---|
| 0010 | Crushed stone base | TON A A | 29,947 | $38.39 | $35.03 |
| 0020 | Lime stabilized roadbed | SQYD A A | 56,989 | $6.50 | $7.24 |
| 0030 | Lime | TON A A | 1,057 | $290.00 | $322.92 |
| 0040 | Asphalt seal aggregate | TON A A | 217 | $129.20 | $122.66 |
| 0050 | Asphalt seal coat | TON A A | 26 | $1,128.36 | $1,071.29 |
| 0060 | Leveling & wedging PG64-22 | TON A A | 209 | $100.09 | $95.02 |
| 0070 | CL2 asph base 1.00D PG64-22 | TON A A | 6,997 | $89.59 | $85.05 |
| 0080 | CL3 asph base 1.00D PG64-22 | TON A A | 10,477 | $85.01 | $80.71 |
| 0090 | CL2 asph surf 0.38D PG64-22 | TON A A | 2,461 | $106.68 | $101.28 |
| 0100 | CL3 asph surf 0.50B PG64-22 | TON A A | 2,556 | $118.52 | $112.53 |
| 0110 | Asphalt curing seal | TON A A | 57 | $904.41 | $858.66 |
| 0120 | Fabric-geotextile class 1 | SQYD A A | 4,928 | $2.45 | $2.78 |
| 0130 | Sand for blotter | TON A A | 143 | $37.07 | $35.19 |
| 0140 | Joint adhesive | LF A A | 38,100 | $0.45 | $0.50 |
| 0150 | Asphalt material for tack non-tracking | TON A A | 44 | $1,093.86 | $1,038.52 |
| 0160 | Electronic delivery MGMT system - agg | LS A A | 1 | $0.01 | $1.00 |
| 0170 | Crushed aggregate size no 2 | TON A A | 3,515 | $42.64 | $50.11 |
| 0180 | Perforated pipe-4 in | LF A A | 354 | $23.89 | $38.97 |
| 0190 | Non-perforated pipe-4 in | LF A A | 64 | $25.25 | $55.68 |
| 0200 | Perf pipe headwall TY 3-4 in | EACH A A | 8 | $914.61 | $1,670.25 |
| 0210 | Delineator for guardrail BI directional white | EACH A A | 5 | $15.00 | $16.82 |
| 0220 | Temp ditch | LF A A | 6,400 | $0.01 | $3.90 |
| 0230 | Clean temp ditch | LF A A | 3,200 | $0.01 | $1.11 |
| 0240 | Granular embankment | CUYD A A | 4,525 | $69.30 | $66.81 |
| 0250 | Embankment in place | CUYD A A | 42,209 | $24.31 | $20.71 |
| 0260 | Water | MGAL A A | 480 | $0.01 | $2.23 |
| 0270 | Guardrail-steel W beam-S face | LF A A | 500 | $40.00 | $36.31 |
| 0280 | Guardrail end treatment type 1 | EACH A A | 2 | $4,500.00 | $3,954.56 |
| 0290 | Remove guardrail | LF A A | 1,589 | $2.00 | $3.70 |
| 0300 | Right-of-way monument type 1 | EACH A A | 43 | $244.76 | $207.43 |
| 0310 | Witness post | EACH A A | 3 | $234.06 | $189.01 |
| 0320 | Clean sinkhole | EACH A A | 2 | $6,329.47 | $2,783.75 |
| 0330 | Channel lining class II | TON A A | 1,546 | $68.09 | $61.24 |
| 0340 | Clearing and grubbing | LS A A | 1 | $35,069 | $155,890 |
| 0350 | Temporary signs | SQFT A A | 370 | $8.10 | $9.44 |
| 0360 | Edge key | LF A A | 100 | $118.44 | $97.15 |
| 0370 | Fabric-geotextile class 1 | SQYD A A | 5,790 | $2.45 | $2.78 |
| 0380 | Fabric-geotextile class 2 | SQYD A A | 13,474 | $2.35 | $2.78 |
| 0390 | Fabric-geotextile class 2 for pipe | SQYD A A | 876 | $2.00 | $2.00 |
| 0400 | Maintain & control traffic | LS A A | 1 | $148,658 | $209,571 |
| 0410 | Portable changeable message sign | EACH A A | 4 | $9,662.96 | $11,250 |
| 0420 | Shoulder rumble strips | LF A A | 25,810 | $0.21 | $0.35 |
| 0430 | Temp silt fence | LF A A | 6,400 | $2.95 | $3.34 |
| 0440 | Silt trap type A | EACH A A | 28 | $333.30 | $334.05 |
| 0450 | Silt trap type B | EACH A A | 28 | $296.94 | $334.05 |
| 0460 | Silt trap type C | EACH A A | 28 | $260.42 | $334.05 |
| 0470 | Clean silt trap type A | EACH A A | 28 | $74.79 | $167.03 |
| 0480 | Clean silt trap type B | EACH A A | 28 | $74.79 | $167.03 |
| 0490 | Clean silt trap type C | EACH A A | 28 | $79.62 | $167.03 |
| 0500 | Staking | LS A A | 1 | $96,930 | $225,348 |
| 0510 | Erosion control blanket | SQYD A A | 17,211 | $1.85 | $2.96 |
| 0520 | Temp mulch | SQYD A A | 90,007 | $0.20 | $0.45 |
| 0530 | Temp seeding and protection | SQYD A A | 67,505 | $0.30 | $0.46 |
| 0540 | Initial fertilizer | TON A A | 3 | $1,500.00 | $1,875.80 |
| 0550 | Maintenance fertilizer | TON A A | 5 | $1,500.00 | $1,875.80 |
| 0560 | Seeding and protection | SQYD A A | 96,579 | $0.42 | $0.81 |
| 0570 | Agricultural limestone | TON A A | 60 | $85.00 | $99.11 |
| 0580 | SBM alum sheet signs .080 in | SQFT A A | 18 | $50.00 | $57.62 |
| 0590 | SBM alum sheet signs .125 in | SQFT A A | 48 | $50.00 | $59.46 |
| 0600 | Steel post type 1 | LF A A | 130 | $25.00 | $42.18 |
| 0610 | Steel post mile markers | EACH A A | 4 | $500.00 | $422.25 |
| 0620 | Pave striping-temp paint-4 in | LF A A | 50,800 | $0.10 | $0.11 |
| 0630 | Pave striping-perm paint-6 in | LF A A | 38,917 | $0.25 | $0.28 |
| 0640 | Pave marking-thermo stop bar-24IN | LF A A | 31 | $12.50 | $13.92 |
| 0650 | Fuel adjustment | DOLL A A | 64,644 | $1.00 | $1.00 |
| 0660 | Asphalt adjustment | DOLL A A | 89,143 | $1.00 | $1.00 |
| 0670 | Object marker TY 3 | EACH A A | 2 | $75.00 | $32.96 |
| 0680 | Centerline rumble strips | LF A A | 12,700 | $0.24 | $0.38 |
| 0690 | Longitudinal edge key | LF A A | 1,450 | $11.36 | $13.36 |
| 0700 | Barcode sign inventory | EACH A A | 14 | $25.00 | $26.51 |
| 0710 | Entrance pipe-18 in | LF A A | 271 | $121.50 | $144.76 |
| 0720 | Culvert pipe-18 in | LF A A | 199 | $159.36 | $144.76 |
| 0730 | Culvert pipe-24 in | LF A A | 45 | $208.30 | $167.03 |
| 0740 | Channel lining class III | TON A A | 64 | $69.23 | $72.38 |
| 0750 | Clean pipe structure | EACH A A | 8 | $2,400.17 | $1,113.50 |
| 0760 | Pipeline inspection | LF A A | 518 | $4.83 | $6.68 |
| 0770 | Sloped and mitered headwall-18 in | EACH A A | 4 | $2,900.00 | $3,618.88 |
| 0780 | Sloped and mitered headwall-24 in | EACH A A | 1 | $3,500.00 | $4,314.81 |
| 0790 | Remove concrete masonry | CUYD A A | 6.80 | $250.00 | $3,006.45 |
| 0800 | Foundation preparation | LS A A | 1 | $7,800.00 | $11,859 |
| 0810 | Concrete-class A | CUYD A A | 59.90 | $1,721.00 | $1,134.10 |
| 0820 | Steel reinforcement | LB A A | 5,615 | $1.89 | $1.95 |
| 0830 | Remove concrete masonry | CUYD A A | 6.60 | $250.00 | $3,006.45 |
| 0840 | Foundation preparation | LS A A | 1 | $5,000.00 | $11,859 |
| 0850 | Concrete-class A | CUYD A A | 40.50 | $2,185.00 | $1,376.29 |
| 0860 | Steel reinforcement | LB A A | 4,109 | $1.91 | $1.95 |
| 0870 | Remove concrete masonry | CUYD A A | 15.40 | $250.00 | $3,006.45 |
| 0880 | Foundation preparation | LS A A | 1 | $7,200.00 | $15,199 |
| 0890 | Concrete-class A | CUYD A A | 115.50 | $1,186.00 | $1,012.17 |
| 0900 | Steel reinforcement | LB A A | 12,637 | $1.86 | $1.67 |
| 0910 | Mobilization | LS A A | 1 | $276,889 | $228,391 |
| 0920 | Demobilization | LS A A | 1 | $103,687 | $130,403 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of March 26, 2026. Compiled by Mirage Metrics.