KYTC contract 26-1113 bid tabulation

ASPHALT SURFACE WITH GRADE & DRAIN BRANNON ROAD (KY 1980). Let by Kentucky Transportation Cabinet on March 26, 2026. 2 bids received; low bid $28,532,686 by The Allen Company Inc, -22% against the engineer's estimate of $36,491,583.

Owner
Kentucky Transportation Cabinet
Letting
26 MAR 2026
Pay items
280
Data through
22 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1The Allen Company Inc$28,532,686Low-22%
2Louisville Paving Company Inc$35,486,848+24%-3.0%
KYTC contract 26-1113: bids by rank

Engineer's estimate: $36,491,583.

Bid tabulation

LinePay itemUnitQuantity1. The Allen Company Inc2. Louisville Paving Company Inc
0010Crushed stone baseTON A A62,006$32.65$40.50
0020Traffic bound baseTON A A146$32.65$50.00
0030Asphalt seal aggregateTON A A184$150.00$152.00
0040Asphalt seal coatTON A A22$1,150.00$1,127.50
0050Leveling & wedging PG64-22TON A A1,497$114.25$115.00
0060CL2 asph base 1.00D PG64-22TON A A32,024$92.75$91.00
0070CL2 asph base 0.75D PG64-22TON A A2,957$98.00$97.00
0080Asphalt prime coatTON A A98.60$925.00$920.00
0090CL2 asph surf 0.38D PG64-22TON A A4,066$114.25$115.00
0100CL2 asph surf 0.38B PG64-22TON A A6,250$118.75$120.00
0110Asphalt material for tackTON A A82.60$800.00$790.00
0120Cement concrete islandSQYD A A1,266$50.20$50.17
0130JPC pavement-8 inSQYD A A498$143.17$143.09
0140Cem conc ent pavement-8 inSQYD A A3,442$111.84$111.77
0150Mobilization for mill & textLS A A1$4,500.00$4,000.00
0160Asphalt pave milling & texturingTON A A152$85.00$88.00
0170Sand for blotterTON A A293$35.00$32.00
0180Joint adhesiveLF A A3,225$0.85$0.80
0190Crushed aggregate size no 2TON A A94,230$26.00$32.00
0200Perforated pipe-4 inLF A A1,006$16.50$20.00
0210Perforated pipe edge drain-4 inLF A A14,429$8.20$7.50
0220Non-perforated pipe-4 inLF A A690$18.26$20.00
0230Inspect & certify edge drain systemLS A A1$7,500.00$9,000.00
0240Perf pipe headwall TY 1-4 inEACH A A10$1,025.00$550.00
0250Perf pipe headwall TY 2-4 inEACH A A1$1,025.00$575.00
0260Perf pipe headwall TY 3-4 inEACH A A1$1,025.00$600.00
0270Perf pipe headwall TY 4-4 inEACH A A3$1,025.00$600.00
0280Cored hole drainage box con-4 inEACH A A55$125.00$300.00
0290Standard curb and gutterLF A A16,133$29.24$29.22
0300Standard curb and gutter modLF A A241$29.93$29.92
0310Lip curb and gutter modLF A A1,104$22.81$22.80
0320Island curb and gutterLF A A419$48.24$48.21
0330Standard integral curbLF A A340$23.99$23.98
0340Standard header curbLF A A612.50$45.76$45.74
0350Conc terminal section type 1EACH A A1$4,773.88$4,771.15
0360Delineator for guardrail BI directional whiteEACH A A53$14.27$13.00
0370Delineator for barrier wall-B/WEACH A A33$15.50$14.90
0380Curb to barrier wall transEACH A A2$7,602.86$7,598.52
0390Barricade-type IIIEACH A A28$230.00$210.00
0400Remove pavementSQYD A A5,077$8.00$5.50
0410Paved ditch type 1SQYD A A8$350.00$385.04
0420Temp ditchLF A A10,523$0.01$2.29
0430Clean temp ditchLF A A5,261$0.01$2.29
0440Granular embankmentCUYD A A7,444$33.00$55.00
0450Embankment in placeCUYD A A243,992$14.85$23.00
0460WaterMGAL A A791$0.01$1.00
0470Guardrail-steel W beam-S faceLF A A5,260$31.91$29.50
0480Guardrail terminal section no 1EACH A A6$87.06$85.00
0490Guardrail end treatment type 1EACH A A9$3,409.24$3,600.00
0500Guardrail end treatment type 2MEACH A A8$1,915.33$2,200.00
0510Guardrail end treatment type 4AEACH A A1$3,727.28$3,600.00
0520Temp guardrailLF A A387.50$17.83$18.00
0530Extra length guardrail postEACH A A660$14.54$118.00
0540Right-of-way monument type 1EACH A A104$150.00$150.00
0550Witness postEACH A A104$130.00$110.00
0560Channel lining class IITON A A1,040$48.75$59.32
0570Channel lining class IIITON A A5,628$51.75$68.41
0580Clearing and grubbingLS A A1$200,000$400,000
0590Concrete-class BCUYD A A271$798.72$830.59
0600Temporary signsSQFT A A1,450$14.75$14.00
0610Edge keyLF A A1,287$24.50$5.83
0620Fabric-geotextile class 1SQYD A A119,997$1.95$1.56
0630Fabric-geotextile class 2SQYD A A33,789$2.00$1.44
0640Fabric-geotextile class 2 for pipeSQYD A A42,820$2.00$2.00
0650Fabric-geotextile class 4ASQYD A A131,152$2.90$2.56
0660Handrail-type A-1LF A A600$91.00$91.00
0670Maintain & control trafficLS A A1$250,000$1,750,000
0680Diversions (by-pass detours)LS A A1$5,800.00$12,000
0690Diversions (by-pass detours)LS A A1$18,750$105,000
0700Diversions (by-pass detours)LS A A1$15,250$65,000
0710Diversions (by-pass detours)LS A A1$3,400.00$8,000.00
0720Diversions (by-pass detours)LS A A1$5,200.00$5,500.00
0730Portable changeable message signEACH A A3$15,000$11,400
0740SafeloadingCUYD A A85.50$360.00$500.00
0750Settlement platformEACH A A2$2,920.00$7,000.00
0760Edgeline rumble stripsLF A A20,567$0.25$0.25
0770Temp silt fenceLF A A10,523$2.90$1.82
0780Silt trap type AEACH A A76$1.00$319.01
0790Silt trap type BEACH A A76$195.00$866.43
0800Silt trap type CEACH A A76$195.00$131.60
0810Clean silt trap type AEACH A A152$0.01$110.61
0820Clean silt trap type BEACH A A152$35.00$110.61
0830Clean silt trap type CEACH A A152$35.00$13.73
0840Sidewalk-4 in concreteSQYD A A1,015$67.36$67.32
0850StakingLS A A1$50,000$200,000
0860Remove structureLS A A1$6,100.00$4,422.40
0870Remove structureLS A A1$6,100.00$11,913
0880Conc barrier wall type 9TLF A A3,225$33.50$86.73
0890Steel pipe-2 1/2 inLF A A64$100.00$100.00
0900Steel pipe-4 inLF A A60$130.00$100.00
0910Temp relocation of signal headEACH A A17$510.20$250.00
0920Erosion control blanketSQYD A A7,858$2.00$1.78
0930Temp mulchSQYD A A247,588$0.01$0.26
0940Temp seeding and protectionSQYD A A184,767$0.01$0.33
0950Initial fertilizerTON A A11$2,000.00$975.00
0960Maintenance fertilizerTON A A19.10$500.00$975.00
0970Seeding and protectionSQYD A A369,534$0.30$0.54
0980Special seeding crown vetchSQYD A A71,150$0.30$0.40
0990SoddingSQYD A A8,922$13.25$6.33
1000Agricultural limestoneTON A A229.10$5.00$99.00
1010Topsoil furnished and placedCUYD A A81$25.00$7.76
1020Pave striping-temp paint-4 inLF A A160,000$0.16$0.16
1030Pave striping-temp paint-12 inLF A A1,100$0.50$0.50
1040Pave striping-perm paint-4 inLF A A4,870$0.26$0.26
1050Pave striping-thermo-6 in WLF A A38,790$0.90$0.90
1060Pave striping-thermo-6 in YLF A A39,526$0.90$0.90
1070Pave striping-thermo-12 in WLF A A94$6.00$6.00
1080Pave striping-thermo-12 in YLF A A38$6.00$6.00
1090Pave striping-dur TY 1-6 in WLF A A366$8.00$8.00
1100Pave striping-dur TY 1-6 in YLF A A458$8.00$8.00
1110Pave marking-thermo X-walk-12 inLF A A2,412$4.00$4.00
1120Pave marking-thermo stop bar-24INLF A A541$8.00$8.00
1130Pave marking-thermo cross-hatchSQFT A A2,200$3.00$3.00
1140Pave marking-thermo STR arrowEACH A A1$100.00$100.00
1150Pave marking-thermo curv arrowEACH A A133$100.00$100.00
1160Pave marking-thermo comb arrowEACH A A13$145.00$145.00
1170Pave marking-thermo merge arrowEACH A A4$300.00$300.00
1180Inlaid pavement marker-MWEACH A A141$30.00$30.00
1190Inlaid pavement marker-byEACH A A741$30.00$30.00
1200Crash cushion TY 6 class T TL2EACH A A8$4,887.67$3,200.00
1210Fuel adjustmentDOLL A A171,122$1.00$1.00
1220Asphalt adjustmentDOLL A A183,740$1.00$1.00
1230Object marker TY 3EACH A A10$33.34$85.00
1240Sawcut pavementLF A A263$4.50$2.85
1250Rolled curb and gutterLF A A336$25.29$25.27
1260Longitudinal edge keyLF A A3,225$6.50$5.25
1270Pave marking-thermo yield bar-36 inLF A A66$45.00$45.00
1280Detectable warningsSQFT A A771$46.00$45.97
1290Turf reinforcement mat 1SQYD A A21,053$5.50$5.68
1300Stamped concreteSQYD A A178$165.00$96.70
1310Yellow paint for median safety noseSQFT A A240$5.00$6.00
1320Island curb and gutter(modified)LF A A110$56.50$56.46
1330Security plate assemblyEACH A A22$300.00$221.76
1340Railroad coordinationLS A A1$432,000$425,000
1350Pave marking-thermo dotted lane extenLF A A82$7.00$7.00
1360Pipeline inspectionLF A A6,916$2.35$2.35
1370Utility coordinationLS A A1$6,500.00$75,000
1380Thrie beam guardrail transition TL-2EACH A A2$3,550.00$2,500.00
1390Electronic delivery MGMT system - aggLS A A1$1,000.00$0.01
1400Roadway gateEACH A A1$8,350.00$7,500.00
1410Entrance pipe-15 inLF A A1,317$50.75$107.00
1420Entrance pipe-18 inLF A A697$62.60$140.00
1430Entrance pipe-24 inLF A A97$75.01$135.00
1440Culvert pipe-15 inLF A A46$56.85$125.00
1450Culvert pipe-18 inLF A A318$80.50$102.00
1460Culvert pipe-24 inLF A A110$79.30$100.00
1470Culvert pipe-30 inLF A A85$141.58$195.00
1480Culvert pipe-48 inLF A A237$155.23$240.00
1490Culvert pipe-60 inLF A A106$290.75$350.00
1500Culvert pipe-42 in equivLF A A202$307.26$280.00
1510Storm sewer pipe-12 inLF A A61$51.25$110.00
1520Storm sewer pipe-15 inLF A A1,830$52.90$70.00
1530Storm sewer pipe-18 inLF A A4,074$66.30$70.00
1540Storm sewer pipe-24 inLF A A1,906$85.40$82.00
1550Storm sewer pipe-30 inLF A A945$104.50$115.00
1560Storm sewer pipe-36 inLF A A397$171.03$160.00
1570Storm sewer pipe-42 inLF A A137$206.80$205.00
1580Storm sewer pipe-48 inLF A A162$178.78$210.00
1590Pipe culvert headwall-15 inEACH A A1$1,600.00$4,500.00
1600Pipe culvert headwall-18 inEACH A A5$1,825.00$3,000.00
1610Pipe culvert headwall-30 inEACH A A2$3,000.00$6,500.00
1620Pipe culvert headwall-42 inEACH A A2$3,600.00$8,000.00
1630Pipe culvert headwall-48 inEACH A A5$10,750$5,000.00
1640Pipe culvert headwall-60 inEACH A A2$13,500$7,500.00
1650Remove pipeLF A A126$20.00$52.00
1660Plug pipeEACH A A1$1,000.00$1,100.00
1670Sloped box outlet type 1-15 inEACH A A8$2,000.00$4,000.00
1680Sloped box outlet type 1-18 inEACH A A4$2,175.00$4,500.00
1690Sloped box outlet type 1-24 inEACH A A1$2,750.00$5,250.00
1700S & F box inlet-outlet-18 inEACH A A1$2,550.00$5,500.00
1710S & F box inlet-outlet-24 inEACH A A1$4,350.00$7,500.00
1720S & F box inlet-outlet-30 inEACH A A1$6,500.00$10,000
1730S & F box inlet-outlet-36 inEACH A A5$8,000.00$8,000.00
1740Curb box inlet type AEACH A A41$7,525.00$7,000.00
1750Curb box inlet type A modEACH A A3$7,850.00$7,500.00
1760Curb box inlet type BEACH A A3$8,200.00$7,250.00
1770Drop box inlet type 1EACH A A3$7,250.00$10,500
1780Drop box inlet type 2EACH A A1$8,500.00$15,000
1790Drop box inlet type 3EACH A A10$6,800.00$10,000
1800Drop box inlet type 5DEACH A A1$7,850.00$13,000
1810Drop box inlet type 6BEACH A A3$9,050.00$14,000
1820Drop box inlet type 6CEACH A A1$8,450.00$14,500
1830Drop box inlet type 6DEACH A A2$8,450.00$12,500
1840Drop box inlet type 6FEACH A A7$8,550.00$10,500
1850Drop box inlet type 7EACH A A3$7,550.00$13,500
1860Drop box inlet type 11EACH A A15$3,000.00$9,000.00
1870Drop box inlet type 12ALF A A24$750.00$1,500.00
1880Drop box inlet type 13GEACH A A11$4,750.00$3,636.45
1890Drop box inlet type 13SEACH A A2$5,400.00$5,600.00
1900Remove drop box inletEACH A A1$750.00$2,500.00
1910Junction box-24 inEACH A A3$2,300.00$6,000.00
1920Junction box-36 inEACH A A3$3,550.00$5,000.00
1930Junction box-48 inEACH A A1$4,800.00$9,500.00
1940Manhole type AEACH A A1$3,750.00$4,500.00
1950Manhole type BEACH A A3$3,750.00$5,750.00
1960Remove headwallEACH A A2$750.00$1,750.00
1970Concrete-class ACUYD A A79.60$1,290.00$1,044.64
1980Steel reinforcementLB A A1,898$1.15$1.68
1990Curb box inlet type B modifiedEACH A A1$8,700.00$8,000.00
2000Entrance pipe-36 inLF A A39$157.00$275.00
2010Bore and jack pipe-48 inLF A A50$1,484.85$1,560.71
2020Bore and jack pipe-18 inLF A A127$590.63$642.48
2030Drainage junction box TY BEACH A A1$3,000.00$4,500.00
2040Bore and jack pipe-36 inLF A A280$898.54$912.09
2050Bore and jack pipe-60 inLF A A50$2,869.85$2,945.71
2060Structure granular backfillCUYD A A468$85.00$71.00
2070Armored edge for concreteLF A A127.30$125.00$113.50
2080Conduit-3 inLF A A366$50.00$42.00
2090Foundation preparationLS A A1$55,000$77,500
2100Reinf conc slope wall-6 inSQYD A A876$195.00$402.50
2110Test pilesLF A A89$225.00$218.00
2120Piles-steel HP12X53LF A A790$105.00$100.00
2130Pile points-12 inEACH A A22$250.00$188.00
2140Concrete-class ACUYD A A303.40$1,035.00$1,157.50
2150Concrete-class AACUYD A A480$1,360.00$1,386.00
2160Steel reinforcementLB A A33,822$1.87$1.80
2170Steel reinforcement-epoxy coatedLB A A155,279$1.84$1.83
2180Bridge chain link fence-7 FTLF A A183$157.00$182.75
2190Bridge chain link fence-8 FTLF A A183$177.00$205.00
2200Rock soundingsLF A A224$65.00$79.00
2210Rock coringsLF A A224$150.00$115.00
2220Drilled shaft-66 in (common)LF A A128$2,140.00$2,529.38
2230Drilled shaft-60 in (solid rock)LF A A88$2,415.00$3,150.00
2240Concrete sealingSQFT A A26,673$2.10$1.60
2250Bicycle railLF A A183$112.00$187.00
2260PPC I-beam type HN 42-49LF A A1,434.70$851.00$797.00
2270Rail system single slope - 36 inLF A A183$190.00$182.00
2280Rail system single slope - 40 inLF A A183$190.00$189.00
2290Mobilization for concrete surf treatmentLS A A1$2,750.00$125.00
2300Flowable fillCUYD A A75$270.00$375.00
2310Structure excav-solid rockCUYD A A2.70$500.00$165.00
2320Foundation preparationLS A A1$25,000$12,000
2330Concrete-class ACUYD A A132.80$1,095.00$1,910.00
2340Steel reinforcementLB A A14,564$2.05$1.90
2350Flowable fillCUYD A A7.10$795.00$462.00
2360Structure excav-solid rockCUYD A A72.50$155.00$140.00
2370Foundation preparationLS A A1$35,000$25,000
2380Concrete-class ACUYD A A497.70$840.00$860.00
2390Steel reinforcementLB A A41,056$1.87$1.85
2400SBM alum sheet signs .080 inSQFT A A536.60$42.10$37.00
2410SBM alum sheet signs .125 inSQFT A A24$46.09$37.00
2420Steel post type 1LF A A1,002$26.43$24.00
2430Remove-store and reinstall signEACH A A8$170.89$500.00
2450GMSS type DEACH A A9$456.98$450.00
2460Barcode sign inventoryEACH A A129$21.26$34.00
2470Trenching and backfillingLF A A20$8.16$7.00
2480Cable-no. 14/5CLF A A3,075$3.32$3.00
2490Cable-no. 14/7CLF A A2,765$3.32$3.00
2500Messenger-10800 LBLF A A1,225$10.20$10.50
2510Install steel strain poleEACH A A8$11,224$11,500
2520Install pedestrian head-LEDEACH A A8$459.18$500.00
2530Install LED signal-3 sectionEACH A A25$663.27$600.00
2540Install LED signal- 4 sectionEACH A A7$867.35$825.00
2550Install ped detector-audibleEACH A A8$306.12$380.00
2560Span/pole-mounted signEACH A A5$306.12$375.00
2570Remove & reinstall coordinating unitEACH A A2$2,551.02$2,500.00
2580Traffic signal pole baseCUYD A A36$663.27$620.00
2590Tether wireLF A A1,225$10.20$8.00
2600PVC conduit-2 in-schedule 80LF A A80$10.20$9.00
2610Install signal controller-TY atcEACH A A2$20,408$17,500
2620Remove signal equipmentEACH A A2$10,204$14,000
2630Install radar presence detector type AEACH A A8$2,040.82$1,600.00
2640Install radar advance detector type BEACH A A4$2,040.82$1,600.00
2650Pole 40 FT MTG HTEACH A A42$3,571.43$3,800.00
2660Bracket 15 FTEACH A A42$765.31$825.00
2670Pole baseEACH A A42$1,530.61$2,000.00
2680Transformer baseEACH A A42$1,530.61$1,100.00
2690Pole W/secondary control equipEACH A A3$25,510$14,000
2700Fused connector kitEACH A A84$229.59$250.00
2710Conduit-2 inLF A A925$15.31$12.00
2720Trenching and backfillingLF A A4,375$8.16$10.00
2730Open cut roadwayLF A A750$21.43$25.00
2740Wire-no. 12LF A A2,550$1.28$1.07
2750Electrical junction box type AEACH A A14$2,040.82$3,000.00
2760Wire-no. 10LF A A19,000$3.06$2.85
2770LED luminaireEACH A A42$663.27$1,000.00
2780PVC conduit-1 1/4 in-schedule 80LF A A4,435$8.16$7.00
2790PVC conduit-2 in-schedule 80LF A A120$10.20$8.50
2800MobilizationLS A A1$1,300,000$1,600,000
2810DemobilizationLS A A1$397,210$540,000
KYTC contract 26-1113: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.

Every contract let that day: KYTC letting of March 26, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy