KYTC contract 26-1508 bid tabulation
GRADE & DRAIN WITH ASPHALT SURFACE BROWN RIDGE RD. (KY 32). Let by Kentucky Transportation Cabinet on March 26, 2026. 4 bids received; low bid $9,558,706 by Frederick & May Construction Co, -24% against the engineer's estimate of $12,648,393.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 26 MAR 2026
- Pay items
- 115
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Frederick & May Construction Co | $9,558,706 | Low | -24% |
| 2 | Standafer Builders Inc | $10,151,122 | +6.0% | -20% |
| 3 | Walker Construction & Materials LLC | $12,944,000 | +35% | +2.0% |
| 4 | Hinkle Construction Services LLC | $18,167,384 | +90% | +44% |
Engineer's estimate: $12,648,393.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Frederick & May Construction Co | 2. Standafer Builders Inc | 3. Walker Construction & Materials LLC | 4. Hinkle Construction Services LLC |
|---|---|---|---|---|---|---|---|
| 0010 | Crushed stone base | TON A A | 14,206 | $45.30 | $35.00 | $45.30 | $46.00 |
| 0020 | Cement stabilized roadbed | SQYD A A | 14,955 | $5.74 | $5.40 | $5.40 | $5.60 |
| 0030 | Asphalt seal aggregate | TON A A | 81.84 | $152.50 | $150.00 | $152.50 | $160.00 |
| 0040 | Asphalt seal coat | TON A A | 9.83 | $975.00 | $950.00 | $975.00 | $1,020.00 |
| 0050 | CL2 asph base 0.75D PG64-22 | TON A A | 5,697 | $154.50 | $136.00 | $154.50 | $162.00 |
| 0060 | CL2 asph surf 0.38D PG64-22 | TON A A | 1,972 | $163.75 | $141.00 | $163.75 | $172.00 |
| 0070 | Asphalt material for tack | TON A A | 17 | $835.00 | $50.00 | $835.00 | $878.00 |
| 0075 | Asphalt curing seal | TON A A | 14.96 | $980.30 | $1,078.00 | $980.30 | $1,030.00 |
| 0076 | Cement | TON A A | 309.72 | $265.00 | $265.00 | $265.00 | $279.00 |
| 0077 | Sand for blotter | TON A A | 37.39 | $117.45 | $183.00 | $117.45 | $123.00 |
| 0080 | Crushed aggregate size no 2 | TON A A | 4,770 | $41.00 | $35.00 | $38.00 | $55.00 |
| 0090 | Perforated pipe-4 in | LF A A | 6,810 | $14.00 | $12.36 | $14.00 | $40.00 |
| 0100 | Non-perforated pipe-4 in | LF A A | 328 | $14.00 | $1.43 | $24.00 | $55.00 |
| 0110 | Perf pipe headwall TY 1-4 in | EACH A A | 18 | $1,000.00 | $550.00 | $1,000.00 | $750.00 |
| 0120 | Perf pipe headwall TY 2-4 in | EACH A A | 1 | $1,100.00 | $650.00 | $1,200.00 | $900.00 |
| 0130 | Perf pipe headwall TY 3-4 in | EACH A A | 18 | $1,100.00 | $650.00 | $1,300.00 | $1,040.00 |
| 0140 | Delineator for guardrail BI directional white | EACH A A | 63 | $13.00 | $13.00 | $13.00 | $13.75 |
| 0150 | Barricade-type III | EACH A A | 4 | $100.00 | $200.00 | $159.00 | $600.00 |
| 0160 | Temp ditch | LF A A | 3,150 | $0.10 | $1.00 | $0.01 | $2.00 |
| 0170 | Clean temp ditch | LF A A | 3,150 | $0.01 | $0.50 | $0.01 | $0.01 |
| 0180 | Roadway excavation | CUYD A A | 720,220 | $5.75 | $6.65 | $10.43 | $14.32 |
| 0190 | Water | MGAL A A | 200 | $1.00 | $8.00 | $0.01 | $0.01 |
| 0200 | Guardrail-steel W beam-S face | LF A A | 4,142 | $29.50 | $29.50 | $29.50 | $31.00 |
| 0210 | Guardrail terminal section no 1 | EACH A A | 5 | $85.00 | $85.00 | $85.00 | $89.50 |
| 0220 | Guardrail end treatment type 1 | EACH A A | 7 | $3,700.00 | $3,700.00 | $3,700.00 | $3,900.00 |
| 0230 | Guardrail end treatment type 3 | EACH A A | 9 | $2,100.00 | $2,100.00 | $2,100.00 | $2,210.00 |
| 0240 | Guardrail end treatment type 4A | EACH A A | 1 | $3,700.00 | $3,700.00 | $3,700.00 | $3,900.00 |
| 0250 | Temp guardrail | LF A A | 1,387.50 | $15.00 | $15.00 | $15.00 | $15.75 |
| 0260 | Right-of-way monument type 1 | EACH A A | 63 | $150.00 | $514.00 | $150.00 | $250.00 |
| 0270 | Witness post | EACH A A | 11 | $110.00 | $514.00 | $110.00 | $150.00 |
| 0280 | Plug water well | EACH A A | 1 | $1,500.00 | $1,100.00 | $4,500.00 | $4,500.00 |
| 0290 | Channel lining class II | TON A A | 96 | $46.00 | $41.00 | $85.00 | $75.00 |
| 0300 | Channel lining class III | TON A A | 1,604 | $48.00 | $55.00 | $55.00 | $85.00 |
| 0310 | Clearing and grubbing | LS A A | 1 | $80,000 | $385,700 | $80,000 | $307,000 |
| 0320 | Concrete-class B | CUYD A A | 8 | $500.00 | $220.00 | $650.00 | $800.00 |
| 0330 | Edge key | LF A A | 128.30 | $55.10 | $25.00 | $55.10 | $58.00 |
| 0340 | Fabric-geotextile class 1 | SQYD A A | 2,000 | $2.00 | $3.35 | $2.50 | $3.50 |
| 0350 | Fabric-geotextile class 2 | SQYD A A | 6,805 | $1.80 | $3.25 | $2.00 | $3.50 |
| 0360 | Maintain & control traffic | LS A A | 1 | $125,000 | $30,000 | $20,000 | $250,000 |
| 0370 | Portable changeable message sign | EACH A A | 2 | $9,000.00 | $3,600.00 | $11,000 | $9,400.00 |
| 0380 | Edgeline rumble strips | LF A A | 11,372 | $0.22 | $0.25 | $0.25 | $0.65 |
| 0390 | Temp silt fence | LF A A | 3,150 | $2.50 | $3.50 | $5.00 | $8.00 |
| 0400 | Silt trap type A | EACH A A | 53 | $25.00 | $400.00 | $1.00 | $300.00 |
| 0410 | Silt trap type B | EACH A A | 53 | $25.00 | $35.00 | $1.00 | $400.00 |
| 0420 | Silt trap type C | EACH A A | 53 | $25.00 | $125.00 | $1.00 | $530.00 |
| 0430 | Clean silt trap type A | EACH A A | 53 | $10.00 | $1.00 | $1.00 | $41.00 |
| 0440 | Clean silt trap type B | EACH A A | 53 | $10.00 | $15.00 | $1.00 | $41.00 |
| 0450 | Clean silt trap type C | EACH A A | 53 | $10.00 | $50.00 | $1.00 | $41.00 |
| 0460 | Staking | LS A A | 1 | $30,000 | $26,600 | $20,000 | $70,000 |
| 0470 | Temp signal 2 phase | EACH A A | 2 | $15,000 | $11,000 | $1.00 | $15,000 |
| 0480 | Erosion control blanket | SQYD A A | 114,409 | $2.30 | $2.30 | $2.30 | $2.40 |
| 0490 | Temp mulch | SQYD A A | 107,443 | $0.29 | $0.29 | $0.29 | $0.31 |
| 0500 | Temp seeding and protection | SQYD A A | 80,542 | $0.32 | $0.32 | $0.32 | $0.34 |
| 0510 | Initial fertilizer | TON A A | 7.50 | $1,800.00 | $1,800.00 | $1,800.00 | $1,900.00 |
| 0520 | Maintenance fertilizer | TON A A | 4.50 | $1,800.00 | $1,800.00 | $1,800.00 | $1,900.00 |
| 0530 | Seeding and protection | SQYD A A | 143,269 | $0.63 | $0.63 | $0.63 | $0.70 |
| 0540 | SBM alum sheet signs .080 in | SQFT A A | 176 | $39.00 | $39.00 | $39.00 | $0.41 |
| 0550 | Steel post type 1 | LF A A | 314 | $29.00 | $29.00 | $29.00 | $30.00 |
| 0560 | Pave striping-perm paint-4 in | LF A A | 25,509 | $0.20 | $0.20 | $0.20 | $0.19 |
| 0570 | Pave marking-thermo stop bar-24IN | LF A A | 37 | $12.50 | $12.50 | $12.50 | $10.50 |
| 0580 | Fuel adjustment | DOLL A A | 1 | $264,253 | $264,253 | $264,253 | $264,253 |
| 0590 | Asphalt adjustment | DOLL A A | 1 | $33,789 | $33,789 | $33,789 | $33,789 |
| 0600 | Object marker TY 3 | EACH A A | 7 | $85.00 | $85.00 | $85.00 | $90.00 |
| 0610 | Temp crash cushion | EACH A A | 2 | $2,500.00 | $2,500.00 | $2,500.00 | $3,000.00 |
| 0620 | Longitudinal edge key | LF A A | 350 | $24.40 | $35.00 | $24.40 | $26.00 |
| 0630 | Barcode sign inventory | EACH A A | 39 | $30.00 | $30.00 | $30.00 | $31.50 |
| 0640 | Electronic delivery MGMT system - agg | LS A A | 1 | $500.00 | $5,000.00 | $1.00 | $1,000.00 |
| 0650 | Entrance pipe-15 in | LF A A | 50 | $50.00 | $65.00 | $82.00 | $112.00 |
| 0660 | Entrance pipe-24 in | LF A A | 89 | $60.00 | $83.50 | $125.00 | $123.00 |
| 0670 | Culvert pipe-15 in | LF A A | 146 | $65.00 | $66.00 | $125.00 | $108.00 |
| 0680 | Culvert pipe-24 in | LF A A | 823 | $100.00 | $87.00 | $140.00 | $165.00 |
| 0690 | Culvert pipe-54 in | LF A A | 52 | $250.00 | $692.31 | $590.00 | $916.00 |
| 0700 | Culvert pipe-66 in | LF A A | 110 | $335.00 | $571.36 | $620.00 | $938.00 |
| 0710 | Pipe culvert headwall-24 in | EACH A A | 8 | $1,250.00 | $2,600.00 | $2,000.00 | $2,750.00 |
| 0720 | Pipe culvert headwall-54 in equiv | EACH A A | 2 | $10,000 | $9,425.00 | $15,000 | $43,000 |
| 0730 | Pipe culvert headwall-66 in | EACH A A | 4 | $16,000 | $18,201 | $21,000 | $43,000 |
| 0740 | Metal end section TY 2-15 in | EACH A A | 2 | $3,100.00 | $4,000.00 | $4,750.00 | $4,200.00 |
| 0750 | Metal end section TY 2-24 in | EACH A A | 3 | $4,500.00 | $5,350.00 | $5,350.00 | $5,600.00 |
| 0760 | S & F box inlet-outlet-24 in | EACH A A | 3 | $3,000.00 | $3,500.00 | $5,250.00 | $5,000.00 |
| 0770 | Drop box inlet type 1 | EACH A A | 2 | $4,000.00 | $5,425.00 | $4,850.00 | $9,000.00 |
| 0780 | Fabric-geotextile class 2 for pipe | SQYD A A | 1,426 | $2.00 | $2.00 | $2.00 | $2.00 |
| 0790 | Concrete-class A | CUYD A A | 0.17 | $3,000.00 | $2,500.00 | $6,000.00 | $49,394 |
| 0800 | Structure excav-solid rock | CUYD A A | 13 | $100.00 | $200.00 | $125.00 | $600.00 |
| 0810 | Foundation preparation | LS A A | 1 | $15,000 | $38,000 | $20,000 | $94,000 |
| 0820 | Concrete-class A | CUYD A A | 222 | $770.00 | $1,150.00 | $1,100.00 | $1,400.00 |
| 0830 | Steel reinforcement | LB A A | 27,880 | $1.95 | $3.00 | $2.00 | $4.00 |
| 0840 | Structure excav-solid rock | CUYD A A | 13 | $100.00 | $200.00 | $125.00 | $600.00 |
| 0850 | Foundation preparation | LS A A | 1 | $10,000 | $10,000 | $5,000.00 | $71,000 |
| 0860 | Concrete-class A | CUYD A A | 48 | $650.00 | $1,550.00 | $1,800.00 | $4,800.00 |
| 0870 | Steel reinforcement | LB A A | 4,160 | $1.00 | $3.00 | $2.75 | $3.75 |
| 0880 | W cap existing main | EACH A A | 4 | $2,600.00 | $1,900.00 | $1,900.00 | $1,950.00 |
| 0890 | W directional bore | LF A A | 1,330 | $198.00 | $180.00 | $180.00 | $190.00 |
| 0900 | W encasement steel bored range 1 | LF A A | 30 | $142.00 | $130.00 | $130.00 | $136.00 |
| 0910 | W encasement steel bored range 2 | LF A A | 160 | $200.00 | $155.00 | $155.00 | $163.00 |
| 0920 | W encasement steel bored range 4 | LF A A | 25 | $352.00 | $300.00 | $300.00 | $315.00 |
| 0930 | W encasement steel open cut range 2 | LF A A | 190 | $165.00 | $105.00 | $105.00 | $110.00 |
| 0940 | W flush hydrant assembly | EACH A A | 1 | $8,485.00 | $8,250.00 | $8,250.00 | $8,600.00 |
| 0950 | W flushing assembly | EACH A A | 2 | $6,500.00 | $2,860.00 | $2,860.00 | $3,000.00 |
| 0960 | W meter 3/4 inch | EACH A A | 1 | $2,600.00 | $1,480.00 | $1,480.00 | $1,550.00 |
| 0970 | W pipe PVC 02 inch | LF A A | 100 | $35.00 | $31.60 | $31.60 | $33.00 |
| 0980 | W pipe PVC 03 inch | LF A A | 495 | $42.00 | $32.00 | $32.00 | $33.00 |
| 0990 | W pipe PVC 04 inch | LF A A | 875 | $44.00 | $33.00 | $33.00 | $34.00 |
| 1000 | W pipe PVC 06 inch | LF A A | 150 | $90.00 | $49.80 | $49.80 | $52.00 |
| 1010 | W pipe PVC 10 inch | LF A A | 520 | $190.00 | $96.40 | $96.40 | $101.00 |
| 1020 | W serv PE/PLST short side 3/4 in | EACH A A | 2 | $1,400.00 | $850.00 | $850.00 | $894.00 |
| 1030 | W tapping sleeve and valve size 1 | EACH A A | 5 | $5,400.00 | $4,660.00 | $4,660.00 | $4,900.00 |
| 1040 | W tie-in 02 inch | EACH A A | 1 | $3,200.00 | $1,340.00 | $1,340.00 | $1,400.00 |
| 1050 | W valve 02 inch | EACH A A | 1 | $1,700.00 | $1,330.00 | $1,330.00 | $1,400.00 |
| 1060 | W valve 04 inch | EACH A A | 2 | $2,600.00 | $1,780.00 | $1,780.00 | $1,850.00 |
| 1070 | W valve 06 inch | EACH A A | 2 | $3,200.00 | $2,260.00 | $2,260.00 | $2,300.00 |
| 1080 | W valve 10 inch | EACH A A | 4 | $11,500 | $4,600.00 | $4,600.00 | $4,800.00 |
| 1090 | W leak detection meter | EACH A A | 2 | $3,200.00 | $5,200.00 | $5,200.00 | $5,400.00 |
| 1100 | W meter 1 inch inst | EACH A A | 1 | $3,000.00 | $940.00 | $940.00 | $989.00 |
| 1110 | Mobilization | LS A A | 1 | $269,641 | $200,000 | $228,597 | $830,000 |
| 1120 | Demobilization | LS A A | 1 | $139,864 | $150,000 | $200,000 | $272,495 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of March 26, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.