KYTC contract 26-1505 bid tabulation
GRADE & DRAIN WITH ASPHALT SURFACE KY 393. Let by Kentucky Transportation Cabinet on March 26, 2026. 3 bids received; low bid $66,800,000 by Cleary Construction Inc, +4.3% against the engineer's estimate of $64,029,993.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 26 MAR 2026
- Pay items
- 379
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Cleary Construction Inc | $66,800,000 | Low | +4.0% |
| 2 | Mac Construction & Excavating Inc | $68,900,000 | +3.0% | +8.0% |
| 3 | Louisville Paving Company Inc | $75,178,000 | +13% | +17% |
Engineer's estimate: $64,029,993.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Cleary Construction Inc | 2. Mac Construction & Excavating Inc | 3. Louisville Paving Company Inc |
|---|---|---|---|---|---|---|
| 0010 | Dga base | TON A A | 8,546 | $38.00 | $50.00 | $51.75 |
| 0020 | Crushed stone base | TON A A | 21,563 | $38.00 | $47.00 | $37.50 |
| 0030 | Drainage blanket-type II-asph | TON A A | 849 | $98.70 | $98.00 | $97.00 |
| 0040 | Traffic bound base | TON A A | 642 | $65.00 | $66.00 | $80.00 |
| 0050 | Asphalt seal aggregate | TON A A | 63 | $195.75 | $395.00 | $178.53 |
| 0060 | Asphalt seal coat | TON A A | 7 | $1,381.08 | $1,140.00 | $1,100.00 |
| 0070 | Leveling & wedging PG64-22 | TON A A | 498 | $88.35 | $150.00 | $120.00 |
| 0080 | CL2 asph base 1.00D PG64-22 | TON A A | 9,844 | $93.35 | $81.50 | $79.00 |
| 0090 | CL3 asph base 1.00D PG64-22 | TON A A | 23,338 | $71.20 | $80.00 | $79.00 |
| 0100 | CL2 asph base 0.75D PG64-22 | TON A A | 742 | $92.35 | $106.00 | $125.00 |
| 0110 | CL2 asph surf 0.38D PG64-22 | TON A A | 2,438 | $97.35 | $121.00 | $114.00 |
| 0120 | CL2 asph surf 0.38B PG64-22 | TON A A | 229 | $123.55 | $146.00 | $165.00 |
| 0130 | CL3 asph surf 0.38D PG64-22 | TON A A | 713 | $93.45 | $92.00 | $88.00 |
| 0140 | CL3 asph surf 0.38B PG64-22 | TON A A | 4,091 | $87.45 | $100.00 | $88.00 |
| 0150 | Cem conc ent pavement-6 in | SQYD A A | 3,324 | $79.03 | $79.03 | $79.03 |
| 0160 | Cem conc ent pavement-8 in | SQYD A A | 1,878 | $110.42 | $110.42 | $110.42 |
| 0170 | Joint adhesive | LF A A | 27,760 | $0.55 | $0.40 | $0.66 |
| 0180 | CL3 asph surf 0.38A PG64-22 | TON A A | 749 | $91.45 | $123.00 | $95.00 |
| 0190 | Pave mount infrared temp equipment | SF A A | 210,726 | $0.02 | $0.02 | $0.01 |
| 0200 | Asphalt material for tack non-tracking | TON A A | 77.70 | $480.00 | $0.01 | $0.01 |
| 0210 | Asphalt seal aggregate | TON A A | 1.50 | $195.75 | $1,575.00 | $178.53 |
| 0220 | Asphalt seal coat | TON A A | 1 | $1,381.08 | $1,140.00 | $1,100.00 |
| 0230 | Plug pipe | EACH A A | 2 | $1,500.00 | $1,750.00 | $1,629.71 |
| 0240 | Standard curb and gutter mod | LF A A | 15,420 | $36.45 | $37.13 | $36.45 |
| 0250 | Standard header curb | LF A A | 754 | $46.28 | $47.67 | $46.28 |
| 0260 | Lip header curb | LF A A | 64 | $47.39 | $51.50 | $47.39 |
| 0270 | Standard barrier median type 2 | SQYD A A | 1,645 | $145.95 | $145.95 | $145.95 |
| 0280 | Delineator for guardrail mono directional white | EACH A A | 47 | $15.00 | $14.50 | $14.50 |
| 0290 | Delineator for barrier - white | EACH A A | 13 | $16.91 | $14.75 | $14.75 |
| 0300 | Delineator for barrier wall-B/Y | EACH A A | 5 | $55.08 | $15.96 | $15.96 |
| 0310 | Delineator for guardrail BI directional white | EACH A A | 12 | $15.00 | $17.57 | $17.57 |
| 0320 | Barricade-type III | EACH A A | 44 | $265.00 | $250.00 | $265.00 |
| 0330 | Remove pavement | SQYD A A | 2,410 | $15.00 | $20.00 | $16.87 |
| 0340 | Cem conc ent pavement-8 in | SQYD A A | 1,024 | $116.67 | $116.67 | $116.67 |
| 0350 | Temp ditch | LF A A | 11,226 | $1.00 | $3.50 | $2.29 |
| 0360 | Clean temp ditch | LF A A | 3,575 | $0.01 | $3.00 | $2.29 |
| 0370 | Roadway excavation | CUYD A A | 381,404 | $36.00 | $27.50 | $56.50 |
| 0380 | Structure excav-unclassified | CUYD A A | 1,156 | $104.93 | $43.00 | $25.00 |
| 0390 | Granular embankment | CUYD A A | 4,086 | $65.00 | $69.00 | $54.68 |
| 0400 | Water | MGAL A A | 850 | $0.02 | $1.00 | $1.00 |
| 0410 | Fence-temp | LF A A | 186 | $10.00 | $24.35 | $24.35 |
| 0420 | Fence-woven wire type 1 | LF A A | 2,650 | $12.00 | $8.44 | $8.44 |
| 0430 | Remove fence | LF A A | 186 | $10.00 | $9.99 | $9.99 |
| 0440 | Guardrail-steel W beam-S face | LF A A | 1,446.50 | $32.00 | $34.68 | $34.68 |
| 0450 | Guardrail connector to conc med barr | EACH A A | 3 | $6,000.00 | $7,220.14 | $7,220.14 |
| 0460 | Guardrail terminal section no 1 | EACH A A | 4 | $100.00 | $77.36 | $77.36 |
| 0470 | Guardrail end treatment type 1 | EACH A A | 1 | $4,500.00 | $3,466.23 | $3,466.23 |
| 0480 | Guardrail end treatment type 2M | EACH A A | 1 | $2,000.00 | $2,123.14 | $2,123.14 |
| 0490 | Remove guardrail | LF A A | 385 | $2.00 | $4.57 | $4.57 |
| 0500 | Guardrail end treatment type 4A | EACH A A | 6 | $4,500.00 | $3,789.40 | $3,789.40 |
| 0510 | Temp guardrail | LF A A | 1,637 | $20.00 | $18.99 | $18.99 |
| 0520 | Right-of-way monument type 1 | EACH A A | 146 | $150.00 | $165.66 | $165.66 |
| 0530 | Right-of-way monument type 1A | EACH A A | 2 | $150.00 | $165.66 | $165.66 |
| 0540 | Witness post | EACH A A | 9 | $150.00 | $149.50 | $149.50 |
| 0550 | Clean sinkhole | EACH A A | 3 | $5,000.00 | $5,000.00 | $3,406.92 |
| 0560 | Channel lining class II | TON A A | 846 | $55.00 | $120.00 | $88.54 |
| 0570 | Channel lining class III | TON A A | 654 | $65.00 | $160.00 | $117.38 |
| 0580 | Clearing and grubbing | LS A A | 1 | $400,000 | $1,282,454 | $570,000 |
| 0590 | Clearing and grubbing | LS A A | 1 | $250,000 | $250,000 | $100,000 |
| 0600 | Concrete-class B | CUYD A A | 258 | $861.52 | $800.00 | $921.34 |
| 0610 | Temporary signs | SQFT A A | 2,328 | $12.00 | $12.00 | $6.00 |
| 0620 | Edge key | LF A A | 421 | $1.00 | $25.00 | $11.88 |
| 0630 | Fabric-geotextile class 1 | SQYD A A | 50 | $7.00 | $10.00 | $9.54 |
| 0640 | Fabric-geotextile class 2 | SQYD A A | 444 | $2.42 | $3.00 | $1.60 |
| 0650 | Fabric-geotextile class 1A | SQYD A A | 68,948 | $4.00 | $3.18 | $3.21 |
| 0660 | Fabric-geotextile class 2 for pipe | SQYD A A | 26,979 | $2.00 | $2.00 | $2.00 |
| 0670 | Handrail-type A-2 | LF A A | 307 | $129.50 | $129.50 | $150.00 |
| 0680 | Maintain & control traffic | LS A A | 1 | $500,000 | $900,000 | $3,000,000 |
| 0690 | Maintain & control traffic | LS A A | 1 | $425,000 | $900,000 | $1,250,000 |
| 0700 | Railroad runaround | LS A A | 1 | $3,150,000 | $2,800,000 | $2,780,000 |
| 0710 | Diversions (by-pass detours) | LS A A | 1 | $35,000 | $20,000 | $11,263 |
| 0720 | Diversions (by-pass detours) | LS A A | 1 | $45,000 | $20,000 | $25,000 |
| 0730 | Crossover | LS A A | 1 | $25,000 | $10,000 | $6,000.00 |
| 0740 | Portable changeable message sign | EACH A A | 11 | $10,500 | $10,200 | $11,400 |
| 0750 | Mobilization for mill & text | LS A A | 1 | $5,500.00 | $7,500.00 | $2,500.00 |
| 0760 | Asphalt pave milling & texturing | TON A A | 589 | $3.00 | $26.00 | $16.25 |
| 0770 | Safeloading | CUYD A A | 3 | $380.00 | $1,500.00 | $571.95 |
| 0780 | Settlement platform | EACH A A | 4 | $1,750.00 | $6,025.00 | $7,000.00 |
| 0790 | Edgeline rumble strips | LF A A | 5,656 | $1.20 | $1.20 | $1.50 |
| 0800 | Temp silt fence | LF A A | 11,226 | $2.50 | $2.11 | $1.90 |
| 0810 | Silt trap type A | EACH A A | 47 | $325.00 | $170.00 | $1,533.81 |
| 0820 | Silt trap type B | EACH A A | 76 | $175.00 | $160.00 | $770.13 |
| 0830 | Silt trap type C | EACH A A | 116 | $300.00 | $170.00 | $310.51 |
| 0840 | Clean silt trap type A | EACH A A | 47 | $0.01 | $30.00 | $153.53 |
| 0850 | Clean silt trap type B | EACH A A | 76 | $0.01 | $35.00 | $153.53 |
| 0860 | Clean silt trap type C | EACH A A | 116 | $0.01 | $30.00 | $153.53 |
| 0870 | Sidewalk-4 in concrete | SQYD A A | 3,701 | $64.13 | $64.13 | $64.13 |
| 0880 | Sidewalk-6 in concrete | SQYD A A | 5,226 | $75.49 | $75.49 | $75.49 |
| 0890 | Staking | LS A A | 1 | $400,000 | $160,000 | $250,000 |
| 0900 | Staking | LS A A | 1 | $375,000 | $160,000 | $200,000 |
| 0910 | Conc barrier wall type 9T | LF A A | 750 | $75.00 | $125.00 | $109.60 |
| 0920 | Clean pipe structure | EACH A A | 1 | $3,663.89 | $4,300.00 | $1,500.00 |
| 0930 | Steel pipe-2 1/2 in | LF A A | 40 | $79.64 | $135.00 | $100.00 |
| 0940 | Steel pipe-4 in | LF A A | 32 | $127.32 | $165.00 | $100.00 |
| 0950 | Temp relocation of signal head | EACH A A | 24 | $300.00 | $300.00 | $400.00 |
| 0960 | Erosion control blanket | SQYD A A | 39,315 | $1.74 | $1.74 | $2.05 |
| 0970 | Temp mulch | SQYD A A | 225,194 | $0.24 | $0.24 | $0.22 |
| 0980 | Temp seeding and protection | SQYD A A | 113,744 | $0.36 | $0.36 | $0.30 |
| 0990 | Initial fertilizer | TON A A | 14.78 | $1,032.00 | $1,032.00 | $700.00 |
| 1000 | Maintenance fertilizer | TON A A | 12.77 | $1,032.00 | $1,032.00 | $700.00 |
| 1010 | Seeding and protection | SQYD A A | 185,564 | $0.54 | $0.54 | $0.34 |
| 1020 | Special seeding crown vetch | SQYD A A | 26,454 | $0.40 | $0.40 | $0.72 |
| 1030 | Sodding | SQYD A A | 15,428 | $6.30 | $6.30 | $8.50 |
| 1040 | Agricultural limestone | TON A A | 55.66 | $98.00 | $98.00 | $130.00 |
| 1050 | Pave striping-temp paint-4 in | LF A A | 21,600 | $0.27 | $0.27 | $0.27 |
| 1060 | Pave striping-perm paint-4 in | LF A A | 7,449 | $0.29 | $0.29 | $0.29 |
| 1070 | Pave striping-perm paint-6 in | LF A A | 78,808 | $0.31 | $0.31 | $0.31 |
| 1080 | Pave striping-perm paint-12 in | LF A A | 1,797 | $0.52 | $0.52 | $0.52 |
| 1090 | Pave striping removal-4 in | LF A A | 3,000 | $0.86 | $0.86 | $0.86 |
| 1100 | Pave striping-thermo-6 in W | LF A A | 679 | $2.00 | $2.00 | $2.00 |
| 1110 | Pave striping-thermo-6 in Y | LF A A | 303 | $2.00 | $2.00 | $2.00 |
| 1120 | Pave striping-thermo-12 in Y | LF A A | 183 | $4.00 | $4.00 | $4.00 |
| 1130 | Pave striping-temp rem tape-W | LF A A | 600 | $2.50 | $2.50 | $2.50 |
| 1140 | Pave striping-temp rem tape-Y | LF A A | 300 | $2.50 | $2.50 | $2.50 |
| 1150 | Pave marking-thermo R 6 FT | EACH A A | 8 | $95.00 | $95.00 | $95.00 |
| 1160 | Pave marking-R/R xbucks 16 in | LF A A | 172 | $12.00 | $12.00 | $12.00 |
| 1170 | Pave marking-thermo X-walk-6 in | LF A A | 1,445 | $4.00 | $4.00 | $4.00 |
| 1180 | Pave marking-thermo stop bar-12IN | LF A A | 102 | $7.00 | $7.00 | $7.00 |
| 1190 | Pave marking-thermo stop bar-24IN | LF A A | 675 | $13.50 | $13.50 | $13.50 |
| 1200 | Pave marking-thermo cross-hatch | SQFT A A | 727 | $5.95 | $5.95 | $5.95 |
| 1210 | Pave marking-paint cross-hatch | SQFT A A | 2,019 | $3.25 | $3.25 | $3.25 |
| 1220 | Pave marking-thermo STR arrow | EACH A A | 5 | $120.00 | $120.00 | $120.00 |
| 1230 | Pave marking-thermo curv arrow | EACH A A | 131 | $130.00 | $130.00 | $130.00 |
| 1240 | Pave marking-thermo comb arrow | EACH A A | 12 | $165.00 | $165.00 | $165.00 |
| 1250 | Pave marking-thermo only | EACH A A | 7 | $305.00 | $305.00 | $305.00 |
| 1260 | Pave marking-thermo merge arrow | EACH A A | 3 | $395.00 | $395.00 | $395.00 |
| 1270 | Pavement marking removal | SQFT A A | 480 | $5.00 | $5.00 | $5.00 |
| 1280 | Inlaid pavement marker-MW | EACH A A | 136 | $32.00 | $32.00 | $32.00 |
| 1290 | Inlaid pavement marker-MY | EACH A A | 51 | $32.00 | $32.00 | $32.00 |
| 1300 | Inlaid pavement marker-by | EACH A A | 412 | $32.00 | $32.00 | $32.00 |
| 1310 | Inlaid pavement marker-B W/R | EACH A A | 35 | $32.00 | $32.00 | $32.00 |
| 1320 | Concrete-class A | CUYD A A | 30 | $2,087.01 | $2,410.00 | $1,911.53 |
| 1330 | Steel reinforcement | LB A A | 1,183 | $5.62 | $2.05 | $2.85 |
| 1340 | Crash cushion TY 6 class T TL2 | EACH A A | 4 | $2,650.00 | $5,433.88 | $5,433.88 |
| 1350 | Temporary bridge | EACH A A | 1 | $800,000 | $700,000 | $250,000 |
| 1360 | Fuel adjustment | DOLL A A | 147,193 | $1.00 | $1.00 | $1.00 |
| 1370 | Asphalt adjustment | DOLL A A | 166,698 | $1.00 | $1.00 | $1.00 |
| 1380 | Object marker TY 3 | EACH A A | 7 | $100.00 | $450.00 | $27.03 |
| 1390 | Saw cut | LF A A | 5,041 | $2.25 | $2.10 | $2.25 |
| 1400 | Remove barrier | LF A A | 240 | $120.31 | $40.00 | $56.70 |
| 1410 | Longitudinal edge key | LF A A | 5,816 | $2.59 | $4.00 | $1.72 |
| 1420 | Bollards | EACH A A | 25 | $1,090.71 | $428.28 | $1,090.71 |
| 1430 | Pave mark thermo cone cap-solid yellow | SQFT A A | 202 | $6.95 | $6.95 | $6.95 |
| 1440 | Pave marking-thermo yield bar-36 in | LF A A | 84 | $32.00 | $32.00 | $32.00 |
| 1450 | Pave mark temp paint stop bar-24 in | LF A A | 372 | $7.95 | $7.95 | $7.95 |
| 1460 | Detectable warnings | SQFT A A | 1,262 | $42.22 | $42.22 | $42.22 |
| 1470 | Pave mark-thermo-X-walk-24 in | LF A A | 1,694 | $12.95 | $12.95 | $12.95 |
| 1480 | Turf reinforcement mat 1 | SQYD A A | 10,313 | $5.98 | $5.98 | $5.50 |
| 1490 | Turf reinforcement mat 2 | SQYD A A | 162 | $6.64 | $6.64 | $5.50 |
| 1500 | Crash cushion TY 6 class C TL3 | EACH A A | 2 | $26,500 | $47,947 | $43,447 |
| 1510 | Railroad coordination | LS A A | 1 | $350,000 | $60,000 | $35,000 |
| 1520 | Pave mark thermo chevron | SQFT A A | 1,638 | $4.95 | $4.95 | $4.95 |
| 1530 | Pave marking-thermo dotted lane exten | LF A A | 366 | $3.50 | $3.50 | $3.50 |
| 1540 | Pipeline inspection | LF A A | 7,681 | $2.75 | $2.25 | $2.25 |
| 1550 | Utility coordination | LS A A | 1 | $300,000 | $30,000 | $40,000 |
| 1555 | Thrie beam guardrail transition TL-2 | EACH A A | 4 | $2,500.00 | $1,745.27 | $1,745.27 |
| 1560 | Railroad runaround | LS A A | 1 | $2,850,000 | $1,950,000 | $2,500,000 |
| 1570 | Protective canopy | LS A A | 1 | $200,000 | $58,000 | $65,000 |
| 1580 | Protective canopy | LS A A | 1 | $200,000 | $58,000 | $65,000 |
| 1590 | Removable bollard | EACH A A | 10 | $1,695.28 | $614.10 | $1,695.28 |
| 1600 | Crushed aggregate size no 2 | TON A A | 2 | $330.00 | $100.00 | $400.00 |
| 1610 | Entrance pipe-15 in | LF A A | 404 | $90.00 | $108.00 | $113.49 |
| 1620 | Entrance pipe-18 in | LF A A | 37 | $130.00 | $87.00 | $253.62 |
| 1630 | Culvert pipe-18 in | LF A A | 264 | $125.00 | $169.00 | $128.72 |
| 1640 | Culvert pipe-24 in | LF A A | 218 | $155.00 | $230.00 | $187.19 |
| 1650 | Culvert pipe-36 in | LF A A | 613 | $215.00 | $285.00 | $262.10 |
| 1660 | Storm sewer pipe-12 in | LF A A | 68 | $105.00 | $120.00 | $162.27 |
| 1670 | Storm sewer pipe-15 in | LF A A | 4,474 | $100.00 | $134.00 | $115.96 |
| 1680 | Storm sewer pipe-18 in | LF A A | 3,015 | $110.00 | $161.00 | $126.36 |
| 1690 | Storm sewer pipe-24 in | LF A A | 2,493 | $120.00 | $199.00 | $156.65 |
| 1700 | Storm sewer pipe-30 in | LF A A | 2,118 | $150.00 | $294.00 | $201.10 |
| 1710 | Storm sewer pipe-36 in | LF A A | 273 | $215.00 | $267.00 | $282.82 |
| 1720 | Slotted drain pipe-15 in | LF A A | 61 | $215.00 | $301.00 | $351.92 |
| 1730 | Perforated pipe-4 in | LF A A | 7,867 | $28.00 | $25.00 | $27.50 |
| 1740 | Non-perforated pipe-4 in | LF A A | 568 | $29.00 | $20.00 | $25.00 |
| 1750 | Perf pipe headwall TY 2-4 in | EACH A A | 1 | $1,500.00 | $1,100.00 | $1,000.00 |
| 1760 | Perf pipe headwall TY 3-4 in | EACH A A | 1 | $1,750.00 | $1,255.00 | $1,000.00 |
| 1770 | Pipe culvert headwall-18 in | EACH A A | 5 | $3,250.00 | $1,725.00 | $2,357.49 |
| 1780 | Pipe culvert headwall-24 in | EACH A A | 3 | $3,500.00 | $2,530.00 | $2,808.19 |
| 1790 | Pipe culvert headwall-36 in | EACH A A | 2 | $3,750.00 | $4,875.00 | $3,279.08 |
| 1800 | Sloped box outlet type 1-15 in | EACH A A | 5 | $3,500.00 | $2,750.00 | $2,937.71 |
| 1810 | Sloped box outlet type 1-18 in | EACH A A | 1 | $3,750.00 | $2,750.00 | $4,343.77 |
| 1820 | Sloped box outlet type 1-24 in | EACH A A | 3 | $4,000.00 | $7,225.00 | $3,950.47 |
| 1830 | S & F box inlet-outlet-18 in | EACH A A | 2 | $4,250.00 | $3,420.00 | $4,154.26 |
| 1840 | S & F box inlet-outlet-24 in | EACH A A | 2 | $5,500.00 | $6,265.00 | $5,346.16 |
| 1850 | S & F box inlet-outlet-30 in | EACH A A | 2 | $7,500.00 | $10,925 | $7,140.25 |
| 1860 | S & F box inlet-outlet-36 in | EACH A A | 4 | $8,500.00 | $13,100 | $13,892 |
| 1870 | Curb box inlet type A | EACH A A | 83 | $8,500.00 | $8,215.00 | $5,610.41 |
| 1880 | Curb box inlet type A T | EACH A A | 3 | $7,500.00 | $3,335.00 | $4,512.88 |
| 1890 | Curb box inlet type A mod | EACH A A | 1 | $8,750.00 | $9,950.00 | $5,610.41 |
| 1900 | Drop box inlet type 3 | EACH A A | 29 | $9,250.00 | $7,115.00 | $5,867.94 |
| 1910 | Drop box inlet type 4 | EACH A A | 4 | $10,000 | $10,515 | $6,990.60 |
| 1920 | Drop box inlet type 6F | EACH A A | 1 | $10,250 | $10,870 | $7,401.53 |
| 1930 | Drop box inlet type 11 | EACH A A | 1 | $4,000.00 | $4,115.00 | $4,766.76 |
| 1940 | Drop box inlet type 12A | LF A A | 48 | $485.00 | $1,065.00 | $1,432.44 |
| 1950 | Drop box inlet type 13G | EACH A A | 8 | $4,500.00 | $6,270.00 | $3,322.44 |
| 1960 | Drop box inlet type 16G | EACH A A | 1 | $4,000.00 | $6,100.00 | $5,313.72 |
| 1970 | Junction box | EACH A A | 1 | $8,500.00 | $6,725.00 | $5,807.46 |
| 1980 | Junction box-special | EACH A A | 1 | $4,800.00 | $6,880.00 | $5,807.46 |
| 1990 | Spring box inlet type A | EACH A A | 3 | $5,500.00 | $5,950.00 | $5,435.52 |
| 2000 | Manhole type A | EACH A A | 2 | $5,000.00 | $6,300.00 | $4,300.86 |
| 2010 | Manhole type B | EACH A A | 1 | $5,000.00 | $10,150 | $5,565.12 |
| 2020 | Manhole type C | EACH A A | 5 | $8,000.00 | $11,950 | $5,672.05 |
| 2030 | Remove concrete masonry | CUYD A A | 2 | $1,250.00 | $5,000.00 | $747.48 |
| 2040 | Channel lining class II | TON A A | 53 | $55.00 | $127.00 | $88.54 |
| 2050 | Channel lining class III | TON A A | 124 | $65.00 | $155.00 | $117.38 |
| 2060 | Concrete-class D | CUYD A A | 1 | $1,675.00 | $8,110.00 | $1,500.00 |
| 2070 | Drainage junction box TY B | EACH A A | 2 | $3,500.00 | $6,925.00 | $6,744.94 |
| 2080 | Precast conc box sect-3 X 3 | LF A A | 39 | $2,500.00 | $605.00 | $1,251.98 |
| 2090 | Pipeline inspection | LF A A | 5,735 | $2.75 | $2.25 | $2.25 |
| 2100 | Sidewalk underdrain | EACH A A | 1 | $6,632.64 | $6,632.64 | $6,632.64 |
| 2110 | Structure granular backfill | CUYD A A | 1,184.10 | $72.00 | $90.00 | $125.00 |
| 2120 | Structure excav-solid rock | CUYD A A | 216 | $130.00 | $154.00 | $150.00 |
| 2130 | Foundation preparation | LS A A | 1 | $225,000 | $800,000 | $290,000 |
| 2140 | Concrete-class AA | CUYD A A | 783.10 | $1,025.00 | $820.00 | $950.00 |
| 2150 | Steel reinforcement | LB A A | 71,226 | $1.73 | $1.50 | $1.90 |
| 2160 | Steel reinforcement-epoxy coated | LB A A | 92,499 | $1.92 | $1.65 | $2.00 |
| 2170 | Structural steel | LS A A | 1 | $4,308,718 | $4,345,000 | $4,315,000 |
| 2180 | Drilled shaft 54 in-solid rock | LF A A | 427.20 | $2,162.00 | $1,480.00 | $1,980.00 |
| 2185 | Rock soundings | LF A A | 224 | $89.00 | $55.00 | $70.00 |
| 2190 | Rock corings | LF A A | 734.30 | $142.00 | $85.00 | $125.00 |
| 2200 | CSL testing (4 tubes) | EACH A A | 16 | $1,150.00 | $936.25 | $1,250.00 |
| 2210 | Drilled shaft-60 in (solid rock) | LF A A | 92 | $3,058.00 | $3,380.00 | $2,210.00 |
| 2220 | Concrete sealing | SQFT A A | 7,742 | $2.00 | $2.50 | $2.00 |
| 2225 | Conduit-6 in | LF A A | 605 | $16.89 | $16.89 | $20.00 |
| 2230 | Deck waterproofing | LS A A | 1 | $450,000 | $187,127 | $250,000 |
| 2240 | Deck drain system | LS A A | 1 | $130,949 | $164,000 | $115,000 |
| 2250 | Concrete-railroad superstructure | CUYD A A | 258.30 | $2,872.00 | $1,660.00 | $1,750.00 |
| 2260 | Mobilization for concrete surf treatment | LS A A | 1 | $1,500.00 | $5,000.00 | $350.00 |
| 2270 | Structure granular backfill | CUYD A A | 492 | $135.00 | $91.00 | $125.00 |
| 2280 | Masonry coating | SQYD A A | 1,157 | $29.00 | $25.00 | $12.50 |
| 2290 | Structure excavation-common | CUYD A A | 1,040 | $24.00 | $30.00 | $15.00 |
| 2300 | Crushed aggregate slope prot | TON A A | 225 | $92.00 | $110.00 | $75.00 |
| 2310 | Concrete-class AA | CUYD A A | 477.90 | $1,600.00 | $880.00 | $1,195.00 |
| 2320 | Concrete-class aaa | CUYD A A | 332 | $2,100.00 | $1,560.00 | $1,750.00 |
| 2330 | Steel reinforcement | LB A A | 86,868 | $1.60 | $1.50 | $2.00 |
| 2340 | Steel reinforcement-epoxy coated | LB A A | 43,284 | $1.70 | $1.65 | $2.00 |
| 2350 | Structural steel | LS A A | 1 | $4,921,560 | $4,900,000 | $4,865,000 |
| 2360 | Rock soundings | LF A A | 129 | $58.00 | $55.00 | $70.00 |
| 2370 | Rock corings | LF A A | 502 | $85.00 | $85.00 | $125.00 |
| 2380 | Drilled shaft-72 in-rock | LF A A | 143 | $4,330.00 | $3,200.00 | $2,500.00 |
| 2390 | Drilled shaft-66 in (rock) | LF A A | 112 | $4,090.00 | $2,350.00 | $4,950.00 |
| 2395 | Conduit-6 in | LF A A | 787 | $16.89 | $16.89 | $20.00 |
| 2400 | Drilled shaft-78 in common | LF A A | 126 | $3,970.00 | $3,185.00 | $1,875.00 |
| 2410 | Deck waterproofing | LS A A | 1 | $202,860 | $157,936 | $295,000 |
| 2420 | Deck drain system | LS A A | 1 | $88,400 | $149,913 | $95,000 |
| 2430 | W cap existing main | EACH A A | 12 | $2,524.00 | $1,060.00 | $2,520.00 |
| 2440 | W encasement steel bored range 2 | LF A A | 70 | $547.00 | $1,640.00 | $545.00 |
| 2450 | W encasement steel bored range 3 | LF A A | 220 | $546.00 | $1,730.00 | $548.00 |
| 2460 | W encasement steel bored range 4 | LF A A | 205 | $807.00 | $2,240.00 | $800.00 |
| 2470 | W encasement steel bored range 5 | LF A A | 80 | $946.00 | $1,980.00 | $950.00 |
| 2480 | W encasement steel open cut range 5 | LF A A | 310 | $264.00 | $1,300.00 | $260.00 |
| 2490 | W fire hydrant assembly | EACH A A | 5 | $10,885 | $13,560 | $11,000 |
| 2500 | W fire hydrant remove | EACH A A | 1 | $1,733.00 | $1,300.00 | $1,700.00 |
| 2510 | W flush hydrant assembly | EACH A A | 5 | $4,962.00 | $7,825.00 | $4,975.00 |
| 2520 | W meter relocate | EACH A A | 23 | $1,977.00 | $1,800.00 | $1,950.00 |
| 2530 | W pipe ductile iron 12 inch | LF A A | 365 | $188.10 | $226.00 | $190.00 |
| 2540 | W pipe DCTL iron RSTRND joint 03 in | LF A A | 70 | $143.45 | $140.00 | $140.00 |
| 2550 | W pipe DCTL iron RSTRND joint 06 in | LF A A | 220 | $150.30 | $125.00 | $155.00 |
| 2560 | W pipe DCTL iron RSTRND joint 10 in | LF A A | 205 | $176.10 | $201.00 | $173.00 |
| 2570 | W pipe DCTL iron RSTRND joint 12 in | LF A A | 390 | $218.30 | $222.00 | $220.00 |
| 2580 | W pipe polyethylene/plastic 06 inch | LF A A | 545 | $109.30 | $150.00 | $108.00 |
| 2590 | W pipe polyethylene/plastic 08 inch | LF A A | 10 | $275.80 | $445.00 | $270.00 |
| 2600 | W pipe polyethylene/plastic 10 inch | LF A A | 2,450 | $120.70 | $230.00 | $120.00 |
| 2610 | W pipe polyethylene/plastic 12 inch | LF A A | 3,050 | $134.35 | $171.00 | $133.00 |
| 2620 | W pipe polyethylene/plastic special | LF A A | 1,170 | $89.35 | $138.00 | $90.00 |
| 2630 | W serv PE/PLST long side 1 in | EACH A A | 6 | $13,727 | $11,800 | $13,700 |
| 2640 | W serv PE/PLST short side 1 in | EACH A A | 18 | $1,009.00 | $4,400.00 | $1,010.00 |
| 2650 | W structure removal | EACH A A | 1 | $1,799.00 | $25,000 | $1,800.00 |
| 2660 | W tapping sleeve and valve size 2 | EACH A A | 3 | $9,282.00 | $15,100 | $9,100.00 |
| 2670 | W tie-in 06 inch | EACH A A | 5 | $3,862.00 | $8,400.00 | $3,800.00 |
| 2680 | W tie-in 08 inch | EACH A A | 1 | $4,610.00 | $8,700.00 | $4,700.00 |
| 2690 | W tie-in 10 inch | EACH A A | 2 | $8,204.00 | $8,800.00 | $8,200.00 |
| 2700 | W tie-in 12 inch | EACH A A | 1 | $8,374.00 | $12,600 | $8,350.00 |
| 2710 | W valve 03 inch | EACH A A | 1 | $2,033.00 | $3,225.00 | $2,000.00 |
| 2720 | W valve 06 inch | EACH A A | 6 | $2,840.00 | $3,290.00 | $2,850.00 |
| 2730 | W valve 08 inch | EACH A A | 1 | $3,954.00 | $4,700.00 | $3,950.00 |
| 2740 | W valve 10 inch | EACH A A | 6 | $5,917.00 | $6,625.00 | $5,900.00 |
| 2750 | W valve 12 inch | EACH A A | 8 | $7,063.00 | $8,545.00 | $7,055.00 |
| 2760 | W valve special | EACH A A | 4 | $20,826 | $22,000 | $20,830 |
| 2770 | W vault special | EACH A A | 1 | $68,350 | $74,459 | $70,000 |
| 2780 | Safeloading | CUYD A A | 15 | $319.00 | $2,500.00 | $315.00 |
| 2790 | W cap existing main | EACH A A | 7 | $1,815.00 | $1,310.00 | $1,800.00 |
| 2800 | W encasement steel bored range 3 | LF A A | 125 | $531.00 | $1,665.00 | $535.00 |
| 2810 | W encasement steel bored range 4 | LF A A | 150 | $816.00 | $2,000.00 | $814.00 |
| 2820 | W encasement steel bored range 5 | LF A A | 110 | $918.00 | $1,755.00 | $920.00 |
| 2830 | W encasement steel bored range 6 | LF A A | 195 | $1,128.00 | $2,850.00 | $1,125.00 |
| 2840 | W encasement steel open cut range 5 | LF A A | 120 | $245.00 | $2,800.00 | $245.00 |
| 2850 | W fire hydrant assembly | EACH A A | 6 | $10,607 | $13,000 | $10,600 |
| 2860 | W fire hydrant remove | EACH A A | 6 | $1,253.00 | $1,160.00 | $1,250.00 |
| 2870 | W meter relocate | EACH A A | 9 | $1,326.00 | $1,796.00 | $1,325.00 |
| 2880 | W pipe ductile iron 16 inch | LF A A | 2,505 | $233.25 | $281.00 | $235.00 |
| 2890 | W pipe DCTL iron RSTRND joint 06 in | LF A A | 150 | $138.60 | $123.00 | $137.00 |
| 2900 | W pipe DCTL iron RSTRND joint 10 in | LF A A | 160 | $176.05 | $194.00 | $180.00 |
| 2910 | W pipe DCTL iron RSTRND joint 12 in | LF A A | 300 | $192.10 | $343.00 | $190.00 |
| 2920 | W pipe DCTL iron RSTRND joint 16 in | LF A A | 195 | $236.60 | $371.00 | $240.00 |
| 2930 | W pipe polyethylene/plastic 06 inch | LF A A | 500 | $103.75 | $123.00 | $102.00 |
| 2940 | W pipe polyethylene/plastic 10 inch | LF A A | 760 | $116.40 | $168.00 | $120.00 |
| 2950 | W pipe polyethylene/plastic 12 inch | LF A A | 2,630 | $129.60 | $159.00 | $130.00 |
| 2960 | W serv PE/PLST long side 1 in | EACH A A | 5 | $9,687.00 | $9,400.00 | $9,680.00 |
| 2970 | W serv PE/PLST short side 1 in | EACH A A | 7 | $2,540.00 | $4,326.00 | $2,540.00 |
| 2980 | W structure removal | EACH A A | 1 | $5,453.00 | $60,000 | $5,500.00 |
| 2990 | W tapping sleeve and valve size 2 | EACH A A | 1 | $12,720 | $16,000 | $12,720 |
| 3000 | W tie-in 03 inch | EACH A A | 1 | $4,212.00 | $4,900.00 | $4,210.00 |
| 3010 | W tie-in 06 inch | EACH A A | 1 | $5,453.00 | $8,700.00 | $5,500.00 |
| 3020 | W tie-in 10 inch | EACH A A | 2 | $7,124.00 | $9,200.00 | $7,120.00 |
| 3030 | W tie-in 12 inch | EACH A A | 2 | $7,460.00 | $9,400.00 | $7,460.00 |
| 3040 | W tie-in 16 inch | EACH A A | 1 | $9,970.75 | $14,000 | $9,900.00 |
| 3050 | W valve 06 inch | EACH A A | 2 | $2,719.00 | $3,300.00 | $2,715.00 |
| 3060 | W valve 10 inch | EACH A A | 6 | $5,836.00 | $6,625.00 | $5,840.00 |
| 3070 | W valve 12 inch | EACH A A | 6 | $6,966.00 | $8,545.00 | $6,950.00 |
| 3080 | W valve 16 inch | EACH A A | 6 | $24,069 | $25,000 | $24,100 |
| 3090 | W valve special | EACH A A | 2 | $25,447 | $24,000 | $25,500 |
| 3100 | W line marker | EACH A A | 2 | $70.00 | $570.00 | $70.00 |
| 3110 | Railroad coordination | LS A A | 1 | $25,000 | $2,500.00 | $25,000 |
| 3120 | Safeloading | CUYD A A | 10 | $396.00 | $2,200.00 | $475.00 |
| 3130 | W cap existing main | EACH A A | 9 | $2,222.00 | $1,100.00 | $2,220.00 |
| 3140 | W encasement steel bored range 4 | LF A A | 260 | $655.00 | $1,900.00 | $655.00 |
| 3150 | W fire hydrant assembly | EACH A A | 2 | $10,864 | $13,000 | $10,870 |
| 3160 | W fire hydrant remove | EACH A A | 2 | $1,229.00 | $1,160.00 | $1,225.00 |
| 3170 | W meter relocate | EACH A A | 5 | $1,035.00 | $1,796.00 | $1,035.00 |
| 3180 | W pipe DCTL iron RSTRND joint 08 in | LF A A | 260 | $180.65 | $155.00 | $181.00 |
| 3190 | W pipe PVC 08 inch | LF A A | 910 | $127.40 | $193.00 | $126.00 |
| 3200 | W serv PE/PLST short side 1 in | EACH A A | 5 | $1,325.00 | $4,300.00 | $1,325.00 |
| 3210 | W tapping sleeve and valve size 1 | EACH A A | 4 | $9,270.00 | $15,000 | $9,270.00 |
| 3220 | W tie-in 08 inch | EACH A A | 1 | $5,395.00 | $8,700.00 | $5,395.00 |
| 3230 | W valve 08 inch | EACH A A | 2 | $4,335.00 | $4,700.00 | $4,335.00 |
| 3240 | W valve special | EACH A A | 4 | $18,557 | $19,000 | $18,600 |
| 3250 | W line marker | EACH A A | 2 | $70.00 | $570.00 | $70.00 |
| 3260 | S encasement steel bored range 1 | LF A A | 40 | $242.00 | $1,380.00 | $245.00 |
| 3270 | S force main tie-in special | EACH A A | 1 | $754.00 | $6,075.00 | $750.00 |
| 3280 | S manhole tap existing | EACH A A | 1 | $2,199.00 | $3,200.00 | $2,500.00 |
| 3290 | S pipe special | LF A A | 810 | $84.60 | $160.00 | $84.00 |
| 3300 | S cap existing main | EACH A A | 1 | $494.00 | $1,900.00 | $500.00 |
| 3310 | Railroad coordination | LS A A | 1 | $25,000 | $2,500.00 | $25,000 |
| 3320 | S encasement steel open cut range 6 | LF A A | 2,999 | $603.00 | $1,090.00 | $601.00 |
| 3330 | S force main air RLS/vac VLV 04 in | EACH A A | 1 | $22,790 | $30,000 | $22,700 |
| 3340 | S force main PVC 06 inch | LF A A | 3,056 | $158.15 | $270.00 | $158.00 |
| 3350 | S force main tie-in 06 inch | EACH A A | 6 | $3,747.00 | $10,000 | $3,747.00 |
| 3360 | S manhole | EACH A A | 9 | $5,554.00 | $15,000 | $6,800.00 |
| 3370 | S manhole abandon/remove | EACH A A | 13 | $2,294.00 | $3,600.00 | $2,295.00 |
| 3380 | S manhole with drop | EACH A A | 2 | $7,773.00 | $20,000 | $7,770.00 |
| 3390 | S pipe PVC 08 inch | LF A A | 2,654 | $152.20 | $240.00 | $152.00 |
| 3400 | S pipe PVC 12 inch | LF A A | 307 | $168.35 | $250.00 | $168.00 |
| 3410 | S manhole rehabilitation | EACH A A | 4 | $3,624.00 | $8,500.00 | $3,624.00 |
| 3420 | Flexible delineator post-M/W | EACH A A | 20 | $75.00 | $69.14 | $69.14 |
| 3430 | SBM alum sheet signs .080 in | SQFT A A | 998.90 | $30.00 | $49.74 | $49.74 |
| 3440 | SBM alum sheet signs .125 in | SQFT A A | 256.60 | $30.00 | $52.40 | $52.40 |
| 3450 | Steel post type 1 | LF A A | 2,643 | $20.00 | $24.85 | $24.85 |
| 3460 | Class A concrete for signs | CUYD A A | 0.46 | $1,000.00 | $4,445.26 | $4,445.25 |
| 3470 | Remove & relocate signs | EACH A A | 2 | $500.00 | $428.28 | $428.28 |
| 3480 | Remove sign | EACH A A | 76 | $75.00 | $46.47 | $46.47 |
| 3490 | GMSS type D | EACH A A | 2 | $1,000.00 | $541.12 | $541.12 |
| 3500 | GMSS type D | EACH A A | 9 | $700.00 | $476.71 | $476.71 |
| 3510 | Barcode sign inventory | EACH A A | 253 | $25.00 | $23.24 | $23.24 |
| 3520 | Pole base | EACH A A | 2 | $2,000.00 | $2,000.00 | $2,646.00 |
| 3530 | Trenching and backfilling | LF A A | 100 | $16.14 | $16.14 | $8.44 |
| 3540 | Cable-no. 14/5C | LF A A | 80 | $1.16 | $1.16 | $5.92 |
| 3550 | Cable-no. 14/7C | LF A A | 4,400 | $1.58 | $1.58 | $6.72 |
| 3560 | Messenger-15400 LB | LF A A | 1,025 | $10.00 | $10.00 | $7.45 |
| 3570 | Install steel strain pole | EACH A A | 8 | $12,000 | $12,000 | $2,907.00 |
| 3580 | Temp relocation of signal head | EACH A A | 6 | $300.00 | $300.00 | $400.00 |
| 3590 | Install span mounted sign | EACH A A | 2 | $1,200.00 | $1,200.00 | $397.00 |
| 3600 | Install pedestrian head-LED | EACH A A | 10 | $900.00 | $900.00 | $455.00 |
| 3610 | Install LED signal-3 section | EACH A A | 19 | $600.00 | $600.00 | $402.00 |
| 3620 | Install LED signal- 4 section | EACH A A | 3 | $700.00 | $700.00 | $409.00 |
| 3630 | Install coordinating unit | EACH A A | 1 | $2,500.00 | $2,500.00 | $3,429.00 |
| 3640 | Install pedestrian detector | EACH A A | 10 | $350.00 | $350.00 | $332.00 |
| 3650 | Install luminaire pole | EACH A A | 2 | $320.00 | $320.00 | $1,296.00 |
| 3660 | Remove & reinstall coordinating unit | EACH A A | 1 | $2,500.00 | $2,500.00 | $3,429.00 |
| 3670 | Traffic signal pole base | CUYD A A | 37 | $300.00 | $300.00 | $3,268.00 |
| 3680 | Tether wire | LF A A | 1,025 | $5.00 | $5.00 | $9.18 |
| 3690 | Install | EACH A A | 2 | $12,000 | $12,000 | $2,332.00 |
| 3700 | PVC conduit-2 in-schedule 80 | LF A A | 200 | $1.48 | $1.48 | $14.26 |
| 3710 | Install signal controller-TY atc | EACH A A | 2 | $8,000.00 | $8,000.00 | $10,987 |
| 3720 | Remove signal equipment | EACH A A | 2 | $25,000 | $25,000 | $11,664 |
| 3730 | Install radar presence detector type A | EACH A A | 7 | $1,500.00 | $1,500.00 | $1,135.00 |
| 3740 | Mobilization | LS A A | 1 | $3,049,900 | $3,200,000 | $3,510,502 |
| 3750 | Demobilization | LS A A | 1 | $968,847 | $1,050,000 | $1,070,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of March 26, 2026. Compiled by Mirage Metrics.