KYTC contract 26-1117 bid tabulation
ASPHALT SURFACE WITH GRADE & DRAIN US 31W / KY 240 INTERSECTION. Let by Kentucky Transportation Cabinet on March 26, 2026. 2 bids received; low bid $2,090,409 by Scotty'S Contracting & Stone LLC, -25% against the engineer's estimate of $2,782,189.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 26 MAR 2026
- Pay items
- 104
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Scotty'S Contracting & Stone LLC | $2,090,409 | Low | -25% |
| 2 | Cleary Construction Inc | $2,250,000 | +8.0% | -19% |
Engineer's estimate: $2,782,189.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Scotty'S Contracting & Stone LLC | 2. Cleary Construction Inc |
|---|---|---|---|---|---|
| 0010 | Crushed stone base | TON A A | 3,953 | $42.77 | $36.00 |
| 0020 | Geogrid reinforcement for subgrade | SQYD A A | 3,504 | $4.20 | $3.00 |
| 0030 | Asphalt seal aggregate | TON A A | 11.90 | $435.65 | $850.00 |
| 0040 | Asphalt seal coat | TON A A | 1.40 | $1,497.07 | $6,500.00 |
| 0050 | Leveling & wedging PG64-22 | TON A A | 53 | $139.53 | $135.00 |
| 0060 | CL2 asph base 1.00D PG64-22 | TON A A | 652 | $98.86 | $100.00 |
| 0070 | CL3 asph base 1.00D PG64-22 | TON A A | 520 | $160.60 | $120.00 |
| 0080 | Asphalt material for tack | TON A A | 3.70 | $690.10 | $650.00 |
| 0090 | CL3 asph surf 0.38B PG64-22 | TON A A | 594 | $131.22 | $138.00 |
| 0100 | JPC pavement-9 in | SQYD A A | 312 | $122.05 | $122.05 |
| 0110 | JPC pavement-8 in | SQYD A A | 258 | $112.23 | $112.23 |
| 0120 | Fabric-geotextile class 1 | SQYD A A | 3,504 | $3.28 | $2.75 |
| 0130 | Mobilization for mill & text | LS A A | 1 | $15,994 | $3,500.00 |
| 0140 | Asphalt pave milling & texturing | TON A A | 537 | $31.46 | $42.00 |
| 0150 | Sawcut pavement | LF A A | 3,242 | $2.39 | $2.50 |
| 0160 | Longitudinal edge key | LF A A | 1,779 | $8.84 | $4.75 |
| 0170 | Stamped concrete | SQYD A A | 312 | $56.59 | $56.59 |
| 0180 | Electronic delivery MGMT system - agg | LS A A | 1 | $1.08 | $0.01 |
| 0190 | Perforated pipe-4 in | LF A A | 1,592 | $20.78 | $25.00 |
| 0200 | Cored hole drainage box con-4 in | EACH A A | 18 | $105.00 | $450.00 |
| 0210 | Standard curb and gutter | LF A A | 1,554 | $33.06 | $30.23 |
| 0220 | Lip curb and gutter | LF A A | 455 | $30.23 | $30.23 |
| 0225 | Island header curb type 2 | LF A A | 146 | $35.42 | $35.42 |
| 0230 | Standard barrier median type 4 | SQYD A A | 97 | $124.20 | $124.20 |
| 0240 | Mountable median type 3 | SQYD A A | 379 | $85.97 | $85.97 |
| 0250 | Remove pavement | SQYD A A | 59 | $11.78 | $38.00 |
| 0260 | Cem conc ent pavement-8 in | SQYD A A | 367 | $78.86 | $78.86 |
| 0270 | Temp ditch | LF A A | 821 | $1.96 | $1.00 |
| 0280 | Clean temp ditch | LF A A | 411 | $1.96 | $0.01 |
| 0290 | Embankment in place | CUYD A A | 1,937 | $48.83 | $70.00 |
| 0300 | Channel lining class II | TON A A | 43 | $80.28 | $55.00 |
| 0310 | Clearing and grubbing | LS A A | 1 | $8,685.61 | $38,000 |
| 0320 | Temporary signs | SQFT A A | 1,270 | $9.13 | $6.00 |
| 0330 | Edge key | LF A A | 132 | $13.82 | $50.00 |
| 0340 | Maintain & control traffic | LS A A | 1 | $78,185 | $92,000 |
| 0350 | Diversions (by-pass detours) | LS A A | 1 | $62,175 | $45,000 |
| 0360 | Portable changeable message sign | EACH A A | 4 | $4,740.75 | $3,180.00 |
| 0370 | Temp silt fence | LF A A | 821 | $4.83 | $2.00 |
| 0380 | Silt trap type A | EACH A A | 6 | $394.30 | $290.00 |
| 0390 | Silt trap type B | EACH A A | 6 | $108.90 | $145.00 |
| 0400 | Silt trap type C | EACH A A | 6 | $197.35 | $275.00 |
| 0410 | Clean silt trap type A | EACH A A | 6 | $95.07 | $0.01 |
| 0420 | Clean silt trap type B | EACH A A | 6 | $71.31 | $0.01 |
| 0430 | Clean silt trap type C | EACH A A | 6 | $61.12 | $0.01 |
| 0440 | Staking | LS A A | 1 | $28,075 | $75,000 |
| 0450 | Arrow panel | EACH A A | 2 | $1,709.25 | $1,750.00 |
| 0460 | Erosion control blanket | SQYD A A | 232 | $2.00 | $2.00 |
| 0470 | Temp mulch | SQYD A A | 19,231 | $0.20 | $0.20 |
| 0480 | Temp seeding and protection | SQYD A A | 14,423 | $0.30 | $0.30 |
| 0490 | Initial fertilizer | TON A A | 2.60 | $1,500.00 | $1,500.00 |
| 0500 | Maintenance fertilizer | TON A A | 1.30 | $1,500.00 | $1,500.00 |
| 0510 | Seeding and protection | SQYD A A | 18,198 | $0.42 | $0.42 |
| 0520 | Sodding | SQYD A A | 6,547 | $8.00 | $8.00 |
| 0530 | Agricultural limestone | TON A A | 16 | $85.00 | $85.00 |
| 0540 | Pave striping-temp paint-6 in | LF A A | 7,250 | $0.32 | $0.32 |
| 0550 | Pave striping-thermo-6 in W | LF A A | 3,022 | $1.35 | $1.35 |
| 0560 | Pave striping-thermo-8 in Y | LF A A | 4,021 | $1.40 | $1.40 |
| 0570 | Pave marking-thermo cross-hatch | SQFT A A | 168 | $8.00 | $8.00 |
| 0580 | Pave marking-thermo comb arrow | EACH A A | 4 | $300.00 | $300.00 |
| 0590 | Pave marking-thermo yield bar-36 in | LF A A | 60 | $25.00 | $25.00 |
| 0600 | Detectable warnings | SQFT A A | 184 | $80.20 | $80.20 |
| 0610 | Pave mark-thermo-yield | EACH A A | 4 | $500.00 | $500.00 |
| 0620 | Pave marking-thermo dotted lane exten | LF A A | 149 | $4.00 | $4.00 |
| 0630 | Entrance pipe-24 in | LF A A | 53 | $87.78 | $125.00 |
| 0640 | Culvert pipe-18 in | LF A A | 47 | $162.87 | $95.00 |
| 0650 | Culvert pipe-36 in | LF A A | 63 | $169.68 | $200.00 |
| 0660 | Storm sewer pipe-18 in | LF A A | 1,511 | $118.79 | $85.00 |
| 0670 | S & F box inlet-outlet-18 in | EACH A A | 1 | $2,546.52 | $4,000.00 |
| 0680 | S & F box inlet-outlet-30 in | EACH A A | 2 | $5,495.80 | $7,000.00 |
| 0690 | S & F box inlet-outlet-36 in | EACH A A | 2 | $7,665.39 | $9,000.00 |
| 0700 | Curb box inlet type B | EACH A A | 11 | $4,976.46 | $7,500.00 |
| 0710 | Drop box inlet type 14 | EACH A A | 3 | $2,643.78 | $7,250.00 |
| 0720 | Manhole type C | EACH A A | 2 | $3,664.99 | $5,000.00 |
| 0730 | Fabric-geotextile class 2 for pipe | SQYD A A | 2,940 | $2.00 | $2.00 |
| 0740 | Bore and jack pipe-30 in | LF A A | 90 | $863.99 | $960.00 |
| 0750 | Bore and jack pipe-36 in | LF A A | 65 | $1,058.05 | $1,300.00 |
| 0760 | Pipeline inspection | LF A A | 1,005 | $2.49 | $2.49 |
| 0770 | SBM alum sheet signs .080 in | SQFT A A | 283 | $35.38 | $40.00 |
| 0780 | Steel post type 1 | LF A A | 560 | $18.50 | $40.00 |
| 0790 | GMSS type D | EACH A A | 6 | $446.15 | $800.00 |
| 0800 | Remove and relocate sheet signs | EACH A A | 5 | $353.37 | $500.00 |
| 0810 | Barcode sign inventory | EACH A A | 75 | $12.20 | $25.00 |
| 0820 | Pole 30 FT MTG HT | EACH A A | 6 | $5,500.00 | $3,059.57 |
| 0830 | Pole 40 FT MTG HT | EACH A A | 10 | $5,000.00 | $3,607.07 |
| 0840 | Bracket 6 FT | EACH A A | 3 | $300.00 | $647.48 |
| 0850 | Bracket 8 FT | EACH A A | 2 | $425.00 | $747.73 |
| 0860 | Bracket 10 FT | EACH A A | 8 | $700.00 | $955.93 |
| 0870 | Bracket 12 FT | EACH A A | 3 | $850.00 | $1,063.88 |
| 0880 | Pole base | EACH A A | 16 | $2,500.00 | $3,102.49 |
| 0890 | Transformer base | EACH A A | 16 | $1,500.00 | $1,727.05 |
| 0900 | Lighting control equipment | EACH A A | 1 | $13,248 | $31,097 |
| 0910 | Fused connector kit | EACH A A | 32 | $150.00 | $253.54 |
| 0920 | Trenching and backfilling | LF A A | 2,600 | $10.80 | $11.78 |
| 0930 | Open cut roadway | LF A A | 538 | $32.12 | $69.00 |
| 0940 | Wire-no. 12 | LF A A | 1,476 | $0.64 | $1.65 |
| 0950 | Wire-no. 8 | LF A A | 9,600 | $2.30 | $2.17 |
| 0960 | Remove lighting | LS A A | 1 | $5,000.00 | $4,161.43 |
| 0970 | Electrical junction box type A | EACH A A | 7 | $3,500.00 | $1,616.50 |
| 0980 | Bore and jack conduit | LF A A | 538 | $12.04 | $21.24 |
| 0990 | LED luminaire | EACH A A | 16 | $1,500.00 | $847.96 |
| 1000 | PVC conduit-1 1/4 in-schedule 80 | LF A A | 2,582 | $0.96 | $6.21 |
| 1010 | PVC conduit-2 in-schedule 80 | LF A A | 556 | $1.48 | $8.70 |
| 1020 | Mobilization | LS A A | 1 | $80,853 | $104,000 |
| 1030 | Demobilization | LS A A | 1 | $29,724 | $31,764 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of March 26, 2026. Compiled by Mirage Metrics.