KYTC contract 26-2126 bid tabulation
ASPHALT RESURFACING MADISON PIKE (KY 17X). Let by Kentucky Transportation Cabinet on August 20, 2026. 3 bids received; low bid $535,443 by Mago Construction Company LLC, +2.6% against the engineer's estimate of $522,085.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 20 AUG 2026
- Pay items
- 24
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Mago Construction Company LLC | $535,443 | Low | +3.0% |
| 2 | Riegler Blacktop Inc | $537,142 | 0.0% | +3.0% |
| 3 | Eaton Asphalt Paving Co Inc | $539,131 | +1.0% | +3.0% |
Engineer's estimate: $522,085.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Mago Construction Company LLC | 2. Riegler Blacktop Inc | 3. Eaton Asphalt Paving Co Inc |
|---|---|---|---|---|---|---|
| 0010 | Asphalt material for tack | TON A A | 19 | $0.01 | $1.00 | $1.00 |
| 0020 | CL3 asph surf 0.38B PG64-22 | TON A A | 3,010 | $110.00 | $107.00 | $116.00 |
| 0030 | Temporary signs | SQFT A A | 670 | $5.00 | $11.00 | $5.00 |
| 0040 | Maintain & control traffic | LS A A | 1 | $7,500.00 | $21,500 | $12,091 |
| 0050 | Portable changeable message sign | EACH A A | 2 | $1,000.00 | $1,500.00 | $1,200.00 |
| 0060 | Mobilization for mill & text | LS A A | 1 | $3,500.00 | $5,000.00 | $4,500.00 |
| 0070 | Asphalt pave milling & texturing | TON A A | 3,010 | $20.00 | $20.00 | $18.74 |
| 0080 | Arrow panel | EACH A A | 2 | $350.00 | $550.00 | $400.00 |
| 0090 | Base failure repair | SQYD A A | 340 | $160.00 | $134.00 | $115.25 |
| 0100 | Pave striping-temp paint-6 in | LF A A | 65,220 | $0.18 | $0.18 | $0.18 |
| 0110 | Pave striping-perm paint-6 in | LF A A | 56,220 | $0.22 | $0.22 | $0.22 |
| 0120 | Pave marking-thermo X-walk-6 in | LF A A | 1,068 | $3.50 | $3.50 | $3.50 |
| 0130 | Pave marking-thermo X-walk-12 in | LF A A | 30 | $8.00 | $8.00 | $8.00 |
| 0140 | Pave marking-thermo stop bar-24IN | LF A A | 294 | $10.00 | $10.00 | $10.00 |
| 0150 | Pave marking-thermo curv arrow | EACH A A | 18 | $120.00 | $120.00 | $120.00 |
| 0160 | Pave marking-thermo comb arrow | EACH A A | 3 | $160.00 | $160.00 | $160.00 |
| 0170 | Remove pavement marker type V | EACH A A | 170 | $20.00 | $5.00 | $11.71 |
| 0180 | Fuel adjustment | DOLL A A | 4,685 | $1.00 | $1.00 | $1.00 |
| 0190 | Asphalt adjustment | DOLL A A | 11,768 | $1.00 | $1.00 | $1.00 |
| 0200 | Pave mark temp paint line arrow | EACH A A | 21 | $65.00 | $65.00 | $65.00 |
| 0210 | Pave mark temp paint stop bar-24 in | LF A A | 294 | $6.00 | $6.00 | $6.00 |
| 0220 | Pave mark thermo-6 in W cat traxx | LF A A | 25 | $5.00 | $5.00 | $5.00 |
| 0230 | Radar presence detector type A | EACH A A | 3 | $2,750.00 | $3,000.00 | $2,585.00 |
| 0240 | Demobilization | LS A A | 1 | $7,669.80 | $8,100.00 | $8,100.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of August 20, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.