ASPHALT REHAB INTERSTATE/PARKWAY I-71. Let by Kentucky Transportation Cabinet on May 21, 2026. 4 bids received; low bid $3,497,183 by Eaton Asphalt Paving Co Inc, -23% against the engineer's estimate of $4,537,837.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 21 MAY 2026
- Pay items
- 70
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Eaton Asphalt Paving Co Inc | $3,497,183 | Low | -23% |
| 2 | Louisville Paving Company Inc | $3,587,665 | +3.0% | -21% |
| 3 | Hinkle Contracting Company LLC | $4,073,728 | +16% | -10% |
| 4 | Riegler Blacktop Inc | $4,792,735 | +37% | +6.0% |
Engineer's estimate: $4,537,837.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Eaton Asphalt Paving Co Inc | 2. Louisville Paving Company Inc | 3. Hinkle Contracting Company LLC | 4. Riegler Blacktop Inc |
|---|---|---|---|---|---|---|---|
| 0010 | Dga base | TON A A | 1,000 | $60.53 | $91.00 | $44.00 | $80.00 |
| 0020 | Asphalt seal aggregate | TON A A | 337 | $84.98 | $91.00 | $237.00 | $250.00 |
| 0030 | Asphalt seal coat | TON A A | 40 | $971.34 | $975.00 | $793.00 | $2,000.00 |
| 0050 | CL3 asph surf 0.38D PG64-22 | TON A A | 1,141 | $95.00 | $103.00 | $111.10 | $303.00 |
| 0060 | CL4 asph surf 0.38A PG76-22 | TON A A | 17,128 | $115.00 | $103.00 | $115.35 | $133.00 |
| 0070 | Mobilization for mill & text | LS A A | 1 | $22,000 | $60,000 | $50,000 | $15,000 |
| 0080 | Asphalt pave milling & texturing | TON A A | 18,269 | $9.74 | $6.50 | $6.00 | $21.30 |
| 0090 | Joint adhesive | LF A A | 93,615 | $0.51 | $0.56 | $0.40 | $0.50 |
| 0100 | Pavement repair | SQYD A A | 3,038 | $35.69 | $36.00 | $50.60 | $70.00 |
| 0110 | Pave mount infrared temp equipment | SF A A | 1,601,595 | $0.01 | $0.01 | $0.01 | $0.01 |
| 0120 | Asphalt material for tack non-tracking | TON A A | 68 | $1.00 | $0.01 | $648.00 | $1.00 |
| 0130 | Delineator for G/R mono directional white | EACH A A | 12 | $15.89 | $15.89 | $20.00 | $15.89 |
| 0140 | G/R end treatment type 2M | EACH A A | 3 | $1,898.00 | $1,898.19 | $2,000.00 | $1,898.19 |
| 0150 | Remove G/R | LF A A | 237.50 | $25.53 | $5.02 | $2.00 | $5.02 |
| 0160 | Remove & reset G/R | LF A A | 562.50 | $25.53 | $25.53 | $20.00 | $25.53 |
| 0170 | Temporary signs | SQFT A A | 2,500 | $3.18 | $5.00 | $6.50 | $6.50 |
| 0180 | Maintain & control traffic | LS A A | 1 | $45,785 | $158,000 | $283,900 | $155,000 |
| 0190 | Truck mounted attenuator | EACH A A | 2 | $3,640.00 | $2,120.00 | $19,000 | $23,850 |
| 0200 | Portable changeable message sign | EACH A A | 4 | $1,214.35 | $2,120.00 | $2,500.00 | $3,000.00 |
| 0210 | Edgeline rumble strips | LF A A | 72,267 | $0.17 | $0.22 | $0.17 | $0.38 |
| 0220 | Flexible delineator post-M/W | EACH A A | 342 | $73.67 | $73.67 | $70.00 | $73.67 |
| 0230 | Flexible delineator post-M/Y | EACH A A | 58 | $73.67 | $73.67 | $70.00 | $73.67 |
| 0240 | Pave striping-temp paint-6 in | LF A A | 103,500 | $0.18 | $0.18 | $0.18 | $0.18 |
| 0250 | Pave striping-thermo-6 in W | LF A A | 52,179 | $0.90 | $0.90 | $0.90 | $0.90 |
| 0260 | Pave striping-thermo-6 in Y | LF A A | 43,489 | $0.90 | $0.90 | $0.90 | $0.90 |
| 0270 | Pave striping-thermo-12 in W | LF A A | 834 | $2.00 | $2.00 | $2.00 | $2.00 |
| 0280 | Pave striping-temp rem tape-B | LF A A | 4,500 | $1.50 | $3.00 | $3.00 | $3.00 |
| 0290 | Pave striping-temp rem tape-W | LF A A | 5,400 | $1.37 | $2.75 | $2.75 | $2.75 |
| 0300 | Pave striping-temp rem tape-Y | LF A A | 36,605 | $1.25 | $2.50 | $2.50 | $2.50 |
| 0310 | Pave marking-thermo stop bar-24IN | LF A A | 60 | $12.00 | $12.00 | $12.00 | $12.00 |
| 0320 | Pave marking-thermo cross-hatch | SQFT A A | 1,837 | $4.00 | $4.00 | $4.00 | $4.00 |
| 0330 | Pave marking-thermo curv arrow | EACH A A | 6 | $135.00 | $135.00 | $135.00 | $135.00 |
| 0340 | Pave marking-thermo only | EACH A A | 3 | $325.00 | $325.00 | $325.00 | $325.00 |
| 0350 | Pave marking-thermo merge arrow | EACH A A | 3 | $350.00 | $350.00 | $350.00 | $350.00 |
| 0360 | Inlaid pavement marker-B W/R | EACH A A | 873 | $28.00 | $28.00 | $28.00 | $28.00 |
| 0370 | Inlaid pavement marker-B Y/R | EACH A A | 38 | $28.00 | $28.00 | $28.00 | $28.00 |
| 0380 | Crash cushion TY 6 class T TL3 | EACH A A | 2 | $3,000.00 | $5,790.20 | $6,500.00 | $5,790.20 |
| 0390 | Fuel adjustment | DOLL A A | 9,591 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0400 | Asphalt adjustment | DOLL A A | 73,989 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0410 | Conc barr wall TY 9T-install | LF A A | 600 | $45.06 | $40.00 | $70.50 | $75.00 |
| 0420 | Replace grate | EACH A A | 2 | $519.75 | $1,500.00 | $1,500.00 | $1,500.00 |
| 0430 | Law enforcement officer | HOUR A A | 250 | $75.00 | $80.00 | $75.00 | $100.00 |
| 0440 | G/R steel W beam-S face (7 FT post) | LF A A | 750 | $40.90 | $40.90 | $42.00 | $40.90 |
| 0450 | Water blasting existing stripe | LF A A | 43,125 | $0.25 | $0.50 | $0.50 | $0.50 |
| 0460 | Concrete wedge curb | LF A A | 113 | $47.23 | $52.86 | $52.86 | $40.00 |
| 0470 | Reset grate | EACH A A | 2 | $136.27 | $1,500.00 | $800.00 | $1,000.00 |
| 0480 | Pave marking-thermo dotted lane exten | LF A A | 318 | $3.50 | $3.50 | $3.50 | $3.50 |
| 0490 | Thrie beam G/R transition TL-3 | EACH A A | 2 | $4,011.98 | $4,011.98 | $4,500.00 | $4,011.98 |
| 0500 | Thrie beam G/R transition TL-2 | EACH A A | 2 | $2,402.09 | $2,402.09 | $3,500.00 | $2,402.09 |
| 0510 | Portable queue warning alert system | MONT A A | 6 | $1,700.00 | $1,669.50 | $1,670.00 | $2,000.00 |
| 0520 | Queue warning PCMS | MONT A A | 36 | $250.00 | $530.00 | $530.00 | $750.00 |
| 0530 | Queue warning portable radar sensors | MONT A A | 36 | $0.01 | $265.00 | $265.00 | $500.00 |
| 0540 | Mobilization for concrete surf treatment | LS A A | 1 | $8,000.00 | $6,000.00 | $225.00 | $3,000.00 |
| 0550 | Connected arrow panel | MONT A A | 6 | $475.00 | $503.50 | $1,007.00 | $3,500.00 |
| 0560 | Electronic delivery MGMT system - agg | LS A A | 1 | $0.01 | $1.00 | $1,000.00 | $1.00 |
| 0570 | Concrete-class A | CUYD A A | 72.80 | $1,425.00 | $1,560.59 | $1,800.00 | $1,500.00 |
| 0580 | Steel reinforcement | LB A A | 4,390 | $4.95 | $2.39 | $2.50 | $4.00 |
| 0590 | Remove barrier | LF A A | 78 | $425.00 | $200.00 | $200.00 | $250.00 |
| 0600 | Concrete sealing | SQFT A A | 900 | $5.00 | $3.73 | $1.75 | $5.25 |
| 0610 | Conduit-1 1/4 in | LF A A | 80 | $8.00 | $23.37 | $7.75 | $7.75 |
| 0620 | Conduit-2 in | LF A A | 20 | $12.00 | $31.00 | $10.72 | $10.72 |
| 0630 | Trenching and backfilling | LF A A | 90 | $6.00 | $14.65 | $15.00 | $15.00 |
| 0640 | Piezoelectric sensor | EACH A A | 6 | $5,000.00 | $2,981.20 | $3,500.00 | $3,500.00 |
| 0650 | Loop wire | LF A A | 2,900 | $2.50 | $1.45 | $0.30 | $0.30 |
| 0660 | Loop saw slot and fill | LF A A | 560 | $15.00 | $35.48 | $30.65 | $30.65 |
| 0670 | Galvanized steel cabinet | EACH A A | 2 | $2,650.00 | $1,139.97 | $1,001.50 | $1,001.50 |
| 0680 | Wood post | EACH A A | 4 | $250.00 | $607.05 | $500.00 | $500.00 |
| 0690 | Electrical junction box type A | EACH A A | 2 | $2,850.00 | $1,613.00 | $3,000.00 | $3,000.00 |
| 0700 | Mobilization | LS A A | 1 | $80,000 | $160,000 | $184,000 | $80,000 |
| 0710 | Demobilization | LS A A | 1 | $52,550 | $54,301 | $57,026 | $69,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of May 21, 2026. Compiled by Mirage Metrics.