KYTC contract 26-5410 bid tabulation
BRIDGE REPLACEMENT CR 1401. Let by Kentucky Transportation Cabinet on April 23, 2026. 6 bids received; low bid $547,195 by Galusha Contracting LLC, -18% against the engineer's estimate of $668,858.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 23 APR 2026
- Pay items
- 32
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Galusha Contracting LLC | $547,195 | Low | -18% |
| 2 | Scott and Murphy Inc | $635,871 | +16% | -5.0% |
| 3 | Green River Equipment Leasing Inc | $639,311 | +17% | -4.0% |
| 4 | Jave LLC | $662,420 | +21% | -1.0% |
| 5 | Hinkle Construction Services LLC | $812,302 | +48% | +21% |
| 6 | Hall Contracting of Kentucky Inc | $828,000 | +51% | +24% |
Engineer's estimate: $668,858.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Galusha Contracting LLC | 2. Scott and Murphy Inc | 3. Green River Equipment Leasing Inc | 4. Jave LLC | 5. Hinkle Construction Services LLC | 6. Hall Contracting of Kentucky Inc |
|---|---|---|---|---|---|---|---|---|---|
| 0010 | Dga base | TON A A | 60 | $53.00 | $50.00 | $62.00 | $51.00 | $70.00 | $50.00 |
| 0020 | Asphalt seal aggregate | TON A A | 6 | $734.00 | $699.00 | $635.46 | $712.98 | $350.00 | $699.00 |
| 0030 | Asphalt seal coat | TON A A | 1 | $1,665.00 | $1,585.00 | $1,743.50 | $1,616.70 | $7,240.00 | $1,585.00 |
| 0040 | Barricade-type III | EACH A A | 12 | $50.00 | $350.00 | $251.58 | $115.00 | $155.00 | $100.00 |
| 0050 | Granular embankment | CUYD A A | 39 | $85.00 | $155.00 | $118.00 | $143.75 | $140.00 | $200.00 |
| 0060 | Right-of-way monument type 1 | EACH A A | 7 | $471.00 | $335.00 | $229.26 | $731.40 | $202.00 | $250.00 |
| 0070 | Witness post | EACH A A | 7 | $471.00 | $320.00 | $175.66 | $731.40 | $35.00 | $250.00 |
| 0080 | Channel lining class II | TON A A | 75 | $68.00 | $70.00 | $73.00 | $159.85 | $87.00 | $100.00 |
| 0090 | Clearing and grubbing | LS A A | 1 | $7,000.00 | $3,900.00 | $28,000 | $44,994 | $14,930 | $41,000 |
| 0100 | Temporary signs | SQFT A A | 216 | $18.00 | $13.00 | $29.52 | $5.75 | $13.00 | $5.00 |
| 0110 | Fabric-geotextile class 1 | SQYD A A | 137 | $5.00 | $4.50 | $4.00 | $2.30 | $5.00 | $9.00 |
| 0120 | Maintain & control traffic | LS A A | 1 | $7,000.00 | $10,000 | $12,245 | $8,088.50 | $69,500 | $40,000 |
| 0130 | Portable changeable message sign | EACH A A | 3 | $1,732.00 | $3,500.00 | $3,021.00 | $2,925.60 | $2,600.00 | $2,500.00 |
| 0140 | Staking | LS A A | 1 | $3,500.00 | $1,675.00 | $10,000 | $5,175.00 | $5,150.00 | $20,000 |
| 0150 | Pavement marker type IV-B W/R | EACH A A | 8 | $157.00 | $150.00 | $201.50 | $153.00 | $155.00 | $150.00 |
| 0160 | Erosion control | LS A A | 1 | $2,500.00 | $5,700.00 | $5,000.00 | $6,900.00 | $5,500.00 | $27,000 |
| 0170 | Linear delineation panels-6 in W | LF A A | 140 | $25.00 | $10.00 | $10.00 | $10.20 | $23.00 | $25.00 |
| 0180 | Structure granular backfill | CUYD A A | 127 | $72.58 | $130.00 | $115.00 | $140.30 | $166.00 | $125.00 |
| 0190 | Remove structure | LS A A | 1 | $19,800 | $23,700 | $26,740 | $26,606 | $27,870 | $70,000 |
| 0200 | Armored edge for concrete | LF A A | 38 | $110.66 | $192.00 | $154.90 | $149.50 | $104.00 | $115.00 |
| 0210 | Foundation preparation | LS A A | 1 | $23,000 | $18,600 | $12,440 | $13,570 | $131,530 | $50,000 |
| 0220 | Cyclopean stone rip rap | TON A A | 375 | $53.00 | $77.00 | $90.00 | $87.40 | $78.00 | $68.00 |
| 0230 | Test piles | LF A A | 170 | $152.00 | $165.00 | $158.42 | $142.60 | $121.00 | $220.00 |
| 0240 | Piles-steel HP12X53 | LF A A | 600 | $99.00 | $146.00 | $158.42 | $120.75 | $104.00 | $135.00 |
| 0250 | Pile points-12 in | EACH A A | 10 | $154.00 | $280.00 | $175.00 | $146.05 | $245.00 | $250.00 |
| 0260 | Concrete-class A | CUYD A A | 33 | $948.00 | $1,400.00 | $1,355.90 | $2,562.20 | $2,627.00 | $2,200.00 |
| 0270 | Concrete-class AA | CUYD A A | 29 | $3,443.82 | $3,870.00 | $2,765.91 | $2,550.70 | $3,511.00 | $3,250.00 |
| 0280 | Steel reinforcement-epoxy coated | LB A A | 7,015 | $2.24 | $2.32 | $4.78 | $3.35 | $1.90 | $2.50 |
| 0290 | Precast PC box beam CB27-48 | LF A A | 350 | $466.00 | $455.00 | $410.42 | $417.01 | $435.00 | $475.00 |
| 0300 | Concrete sealing | SQFT A A | 2,833 | $2.00 | $3.61 | $1.53 | $2.82 | $1.90 | $1.60 |
| 0310 | Mobilization for concrete surf treatment | LS A A | 1 | $1,200.00 | $2,000.00 | $500.00 | $5,750.00 | $1,750.00 | $2,600.00 |
| 0320 | Demobilization | LS A A | 1 | $8,100.00 | $9,600.00 | $15,736 | $9,789.45 | $12,100 | $12,293 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of April 23, 2026. Compiled by Mirage Metrics.