KYTC contract 26-1122 bid tabulation
GRADE & DRAIN WITH ASPHALT SURFACE KY 32. Let by Kentucky Transportation Cabinet on May 21, 2026. 2 bids received; low bid $43,834,383 by Walker Construction & Materials LLC, -15% against the engineer's estimate of $51,508,719.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 21 MAY 2026
- Pay items
- 296
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Walker Construction & Materials LLC | $43,834,383 | Low | -15% |
| 2 | Hinkle Construction Services LLC | $50,481,163 | +15% | -2.0% |
Engineer's estimate: $51,508,719.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Walker Construction & Materials LLC | 2. Hinkle Construction Services LLC |
|---|---|---|---|---|---|
| 0010 | Dga base | TON A A | 43,925 | $38.95 | $41.00 |
| 0020 | Crushed stone base | TON A A | 619 | $48.70 | $51.00 |
| 0030 | Asphalt seal aggregate | TON A A | 345 | $335.00 | $350.00 |
| 0040 | Asphalt seal coat | TON A A | 50 | $1,000.00 | $1,050.00 |
| 0050 | CL2 asph base 1.00D PG64-22 | TON A A | 7,406 | $137.85 | $145.00 |
| 0060 | CL3 asph base 1.00D PG64-22 | TON A A | 46,942 | $137.85 | $145.00 |
| 0070 | CL2 asph surf 0.38D PG64-22 | TON A A | 2,928 | $167.35 | $176.00 |
| 0080 | Joint adhesive | LF A A | 53,826 | $0.45 | $0.55 |
| 0090 | CL3 asph surf 0.38A PG64-22 | TON A A | 6,529 | $175.10 | $184.00 |
| 0100 | Asphalt material for tack non-tracking | TON A A | 91.20 | $865.00 | $910.00 |
| 0110 | Electronic delivery MGMT system - agg | LS A A | 1 | $1,500.00 | $1,580.00 |
| 0120 | Entrance pipe-15 in | LF A A | 1,413 | $90.00 | $110.26 |
| 0130 | Entrance pipe-18 in | LF A A | 524 | $120.00 | $121.94 |
| 0140 | Entrance pipe-24 in | LF A A | 204 | $160.00 | $151.38 |
| 0150 | Entrance pipe-30 in | LF A A | 37 | $180.00 | $173.68 |
| 0160 | Remove pipe | LF A A | 119 | $20.00 | $50.75 |
| 0170 | Fill and cap well | EACH A A | 1 | $3,000.00 | $5,376.34 |
| 0180 | Standard curb and gutter | LF A A | 143 | $95.00 | $78.00 |
| 0190 | Island curb and gutter | LF A A | 458 | $75.00 | $72.00 |
| 0200 | Standard header curb | LF A A | 236 | $79.00 | $66.00 |
| 0210 | Delineator for G/R BI directional white | EACH A A | 141 | $13.00 | $14.00 |
| 0215 | Relocate temp conc barrier | LF A A | 1,000 | $10.00 | $12.29 |
| 0220 | Barricade-type III | EACH A A | 45 | $180.00 | $414.24 |
| 0230 | Remove pavement | SQYD A A | 7,681 | $10.00 | $8.74 |
| 0240 | Temp ditch | LF A A | 6,661 | $0.50 | $1.22 |
| 0250 | Clean temp ditch | LF A A | 3,330 | $0.50 | $0.01 |
| 0260 | Structure demolition | EACH A A | 1 | $24,000 | $14,960 |
| 0270 | Roadway excavation | CUYD A A | 607,695 | $18.20 | $26.63 |
| 0280 | Water | MGAL A A | 1,000 | $1.00 | $0.01 |
| 0290 | G/R terminal section no 1 | EACH A A | 17 | $55.00 | $58.00 |
| 0300 | G/R end treatment type 1 | EACH A A | 8 | $3,300.00 | $3,470.00 |
| 0310 | G/R end treatment type 2M | EACH A A | 8 | $2,100.00 | $2,210.00 |
| 0320 | G/R end treatment type 7 | EACH A A | 1 | $1,500.00 | $1,580.00 |
| 0330 | Remove G/R | LF A A | 4,643 | $3.13 | $3.80 |
| 0340 | Right-of-way monument type 1 | EACH A A | 96 | $275.00 | $169.89 |
| 0350 | Right-of-way monument type 1A | EACH A A | 1 | $275.00 | $169.89 |
| 0360 | Witness post | EACH A A | 10 | $275.00 | $66.67 |
| 0370 | Channel lining class II | TON A A | 6,266 | $55.00 | $60.60 |
| 0380 | Channel lining class III | TON A A | 2,661 | $55.00 | $62.28 |
| 0390 | Clearing and grubbing | LS A A | 1 | $472,000 | $218,950 |
| 0400 | Temporary signs | SQFT A A | 1,000 | $15.00 | $13.40 |
| 0410 | Edge key | LF A A | 449 | $57.30 | $60.00 |
| 0420 | Fabric-geotextile class 2 | SQYD A A | 100 | $3.75 | $3.54 |
| 0430 | Remove headwall | EACH A A | 2 | $350.00 | $2,250.86 |
| 0440 | Maintain & control traffic | LS A A | 1 | $725,000 | $1,023,451 |
| 0450 | Portable changeable message sign | EACH A A | 4 | $13,500 | $12,469 |
| 0460 | Safeloading | CUYD A A | 9 | $600.00 | $857.74 |
| 0470 | Edgeline rumble strips | LF A A | 30,663 | $0.25 | $0.20 |
| 0480 | Temp silt fence | LF A A | 6,661 | $3.00 | $5.81 |
| 0490 | Silt trap type A | EACH A A | 64 | $64.00 | $337.10 |
| 0500 | Silt trap type B | EACH A A | 64 | $64.00 | $346.91 |
| 0510 | Silt trap type C | EACH A A | 64 | $64.00 | $553.11 |
| 0520 | Clean silt trap type A | EACH A A | 64 | $32.00 | $40.04 |
| 0530 | Clean silt trap type B | EACH A A | 64 | $32.00 | $40.04 |
| 0540 | Clean silt trap type C | EACH A A | 64 | $32.00 | $40.04 |
| 0550 | Sedimentation basin | CUYD A A | 19,000 | $5.00 | $10.79 |
| 0560 | Clean sedimentation basin | CUYD A A | 19,000 | $2.50 | $8.71 |
| 0570 | Staking | LS A A | 1 | $200,000 | $164,000 |
| 0575 | Remove structure | LS A A | 1 | $80,054 | $85,560 |
| 0576 | Remove structure | LS A A | 1 | $20,338 | $21,730 |
| 0577 | Remove structure | LS A A | 1 | $15,000 | $65,820 |
| 0580 | Arrow panel | EACH A A | 2 | $5,000.00 | $8,985.26 |
| 0585 | Relocate crash cushion | EACH A A | 4 | $2,800.00 | $2,950.00 |
| 0590 | Clean pipe structure | EACH A A | 1 | $3,500.00 | $3,076.18 |
| 0600 | Erosion control blanket | SQYD A A | 40,946 | $2.39 | $2.50 |
| 0610 | Temp mulch | SQYD A A | 205,958 | $0.25 | $0.25 |
| 0620 | Temp seeding and protection | SQYD A A | 154,469 | $0.33 | $0.35 |
| 0630 | Initial fertilizer | TON A A | 6.80 | $1,600.00 | $1,685.00 |
| 0640 | Seeding and protection | SQYD A A | 213,089 | $0.59 | $0.65 |
| 0650 | Agricultural limestone | TON A A | 191.50 | $130.00 | $135.00 |
| 0660 | Flexible delineator post-M/W | EACH A A | 260 | $92.00 | $97.00 |
| 0670 | Pave striping-temp paint-6 in | LF A A | 106,000 | $0.20 | $0.20 |
| 0680 | Pave striping-thermo-6 in W | LF A A | 44,259 | $1.00 | $1.05 |
| 0690 | Pave striping-thermo-6 in Y | LF A A | 28,966 | $1.00 | $1.05 |
| 0700 | Pave striping-dur TY 1-6 in W | LF A A | 420 | $10.00 | $10.50 |
| 0710 | Pave striping-dur TY 1-6 in Y | LF A A | 307 | $10.00 | $10.50 |
| 0720 | Pave marking-thermo stop bar-24IN | LF A A | 344 | $10.00 | $10.50 |
| 0730 | Pave marking-thermo cross-hatch | SQFT A A | 125 | $6.50 | $6.85 |
| 0740 | Pave marking-thermo curv arrow | EACH A A | 118 | $100.00 | $105.00 |
| 0750 | Pavement marker TY iva-by temp | EACH A A | 1,325 | $7.00 | $7.40 |
| 0760 | Inlaid pavement marker-MW | EACH A A | 158 | $32.00 | $34.00 |
| 0770 | Inlaid pavement marker-by | EACH A A | 492 | $32.00 | $34.00 |
| 0775 | Crash cushion TY 6 class T TL3 | EACH A A | 2 | $4,500.00 | $4,740.00 |
| 0780 | Fuel adjustment | DOLL A A | 156,038 | $1.00 | $1.00 |
| 0790 | Asphalt adjustment | DOLL A A | 258,410 | $1.00 | $1.00 |
| 0795 | Conc barr wall TY 9T-install | LF A A | 1,000 | $80.00 | $151.48 |
| 0800 | Object marker TY 3 | EACH A A | 8 | $55.00 | $58.00 |
| 0810 | Law enforcement officer | HOUR A A | 1,000 | $95.00 | $67.00 |
| 0820 | Centerline rumble strips | LF A A | 2,867 | $0.80 | $0.60 |
| 0830 | G/R steel W beam-S face (7 FT post) | LF A A | 7,025 | $27.89 | $29.00 |
| 0840 | Lightweight aggregate fill | CUYD A A | 1,628 | $240.00 | $151.47 |
| 0850 | R/W monument type 3 | EACH A A | 83 | $275.00 | $169.89 |
| 0860 | Pipeline inspection | LF A A | 1,338 | $3.00 | $2.50 |
| 0870 | Utility coordination | LS A A | 1 | $25,000 | $90,548 |
| 0880 | Pave mount infrared temp equipment | SF A A | 682,623 | $0.03 | $0.03 |
| 0890 | Thrie beam G/R transition TL-2 | EACH A A | 8 | $3,230.00 | $1,900.00 |
| 0900 | Culvert pipe-12 in | LF A A | 10 | $220.00 | $270.70 |
| 0910 | Culvert pipe-15 in | LF A A | 86 | $170.00 | $148.83 |
| 0920 | Culvert pipe-18 in | LF A A | 641 | $190.00 | $191.49 |
| 0930 | Culvert pipe-24 in | LF A A | 314 | $230.00 | $264.02 |
| 0940 | Culvert pipe-30 in | LF A A | 572 | $270.00 | $195.42 |
| 0950 | Culvert pipe-36 in | LF A A | 129 | $370.00 | $430.05 |
| 0960 | Culvert pipe-42 in | LF A A | 320 | $370.00 | $443.58 |
| 0970 | Culvert pipe-48 in | LF A A | 75 | $420.00 | $723.40 |
| 0980 | Storm sewer pipe-15 in | LF A A | 157 | $150.00 | $120.57 |
| 0990 | Pipe culvert headwall-15 in | EACH A A | 2 | $2,500.00 | $1,526.43 |
| 1000 | Pipe culvert headwall-18 in | EACH A A | 11 | $2,600.00 | $2,352.10 |
| 1010 | Pipe culvert headwall-24 in | EACH A A | 4 | $2,900.00 | $2,461.15 |
| 1020 | Pipe culvert headwall-30 in | EACH A A | 5 | $3,600.00 | $3,369.46 |
| 1030 | Pipe culvert headwall-36 in | EACH A A | 2 | $4,500.00 | $3,707.34 |
| 1040 | Pipe culvert headwall-42 in | EACH A A | 5 | $5,800.00 | $4,034.50 |
| 1050 | Pipe culvert headwall-48 in | EACH A A | 3 | $7,600.00 | $4,165.06 |
| 1060 | Sloped box outlet type 1-15 in | EACH A A | 1 | $4,000.00 | $3,534.29 |
| 1070 | Sloped box outlet type 1-18 in | EACH A A | 3 | $4,200.00 | $3,534.29 |
| 1080 | Sloped box outlet type 1-24 in | EACH A A | 1 | $4,800.00 | $4,131.02 |
| 1090 | Sloped and parallel headwall-12 in | EACH A A | 1 | $4,000.00 | $2,554.62 |
| 1100 | S & F box inlet-outlet-18 in | EACH A A | 2 | $3,800.00 | $3,534.29 |
| 1110 | S & F box inlet-outlet-24 in | EACH A A | 2 | $4,800.00 | $4,855.42 |
| 1120 | Drop box inlet type 1 | EACH A A | 5 | $4,600.00 | $8,865.28 |
| 1130 | Drop box inlet type 2 | EACH A A | 1 | $5,600.00 | $10,659 |
| 1140 | Drop box inlet type 11 | EACH A A | 2 | $4,600.00 | $4,151.34 |
| 1150 | Drop box inlet type 12 | LF A A | 53 | $3,600.00 | $577.72 |
| 1160 | Drop box inlet type 14 | EACH A A | 1 | $5,600.00 | $4,741.64 |
| 1170 | Channel lining class II | TON A A | 83 | $100.00 | $60.60 |
| 1180 | Channel lining class III | TON A A | 217 | $100.00 | $62.28 |
| 1190 | Concrete-class B | CUYD A A | 0.60 | $9,000.00 | $7,405.24 |
| 1200 | Fabric-geotextile class 2 for pipe | SQYD A A | 4,027 | $2.00 | $2.00 |
| 1210 | Turf reinforcement mat 1 | SQYD A A | 10 | $45.00 | $45.92 |
| 1220 | Remove concrete masonry | CUYD A A | 9.20 | $900.00 | $706.16 |
| 1230 | Structure excav-solid rock | CUYD A A | 15.90 | $550.00 | $346.22 |
| 1240 | Foundation preparation | LS A A | 1 | $30,000 | $19,485 |
| 1250 | Concrete-class A | CUYD A A | 51 | $2,000.00 | $2,226.03 |
| 1260 | Steel reinforcement | LB A A | 6,584 | $2.50 | $1.80 |
| 1270 | Rail system type T631 | LF A A | 15 | $230.00 | $295.00 |
| 1280 | Structure excav-solid rock | CUYD A A | 6.50 | $900.00 | $423.46 |
| 1290 | Foundation preparation | LS A A | 1 | $20,000 | $9,761.44 |
| 1300 | Concrete-class A | CUYD A A | 11 | $4,800.00 | $4,999.98 |
| 1310 | Steel reinforcement | LB A A | 1,095 | $4.00 | $1.80 |
| 1320 | Structure excav-solid rock | CUYD A A | 27 | $420.00 | $203.89 |
| 1330 | Foundation preparation | LS A A | 1 | $25,000 | $45,348 |
| 1340 | Concrete-class A | CUYD A A | 72 | $1,900.00 | $2,256.79 |
| 1350 | Steel reinforcement | LB A A | 9,384 | $2.50 | $1.80 |
| 1360 | Structure excav-solid rock | CUYD A A | 15 | $600.00 | $366.99 |
| 1370 | Foundation preparation | LS A A | 1 | $30,000 | $40,449 |
| 1380 | Concrete-class A | CUYD A A | 170.90 | $1,600.00 | $1,284.54 |
| 1390 | Steel reinforcement | LB A A | 21,085 | $2.50 | $1.77 |
| 1400 | Structure excav-solid rock | CUYD A A | 14.20 | $500.00 | $387.67 |
| 1410 | Foundation preparation | LS A A | 1 | $55,000 | $52,371 |
| 1420 | Concrete-class A | CUYD A A | 144.80 | $1,900.00 | $2,055.30 |
| 1430 | Steel reinforcement | LB A A | 16,416 | $3.00 | $1.80 |
| 1440 | Structure granular backfill | CUYD A A | 455 | $95.00 | $146.92 |
| 1450 | Armored edge for concrete | LF A A | 150 | $150.00 | $97.33 |
| 1460 | Structure excav-solid rock | CUYD A A | 43 | $350.00 | $162.47 |
| 1470 | Foundation preparation | LS A A | 1 | $225,000 | $71,061 |
| 1480 | Cyclopean stone rip rap | TON A A | 635 | $75.00 | $87.02 |
| 1490 | Test piles | LF A A | 35 | $220.00 | $276.51 |
| 1500 | Pre-drilling for piles | LF A A | 148 | $450.00 | $395.80 |
| 1510 | Piles-steel HP12X53 | LF A A | 150 | $220.00 | $352.20 |
| 1520 | Pile points-12 in | EACH A A | 14 | $165.00 | $154.03 |
| 1530 | Concrete-class A | CUYD A A | 71 | $1,600.00 | $1,962.38 |
| 1540 | Concrete-class AA | CUYD A A | 289.10 | $1,600.00 | $1,670.76 |
| 1550 | Steel reinforcement-epoxy coated | LB A A | 64,043 | $2.00 | $1.90 |
| 1560 | Precast PC I beam type 5 | LF A A | 833 | $825.00 | $806.61 |
| 1570 | Concrete sealing | SQFT A A | 13,143 | $2.00 | $1.85 |
| 1580 | Rail system single slope - 40 in | LF A A | 247 | $225.00 | $230.00 |
| 1590 | Mobilization for concrete surf treatment | LS A A | 1 | $1,750.00 | $2,580.65 |
| 1600 | Structure granular backfill | CUYD A A | 306 | $85.00 | $225.08 |
| 1610 | Armored edge for concrete | LF A A | 56.90 | $175.00 | $111.50 |
| 1620 | Structure excav-solid rock | CUYD A A | 200.70 | $150.00 | $152.68 |
| 1630 | Foundation preparation | LS A A | 1 | $225,000 | $75,512 |
| 1640 | Cyclopean stone rip rap | TON A A | 733 | $75.00 | $93.85 |
| 1650 | Concrete-class A | CUYD A A | 529.90 | $1,100.00 | $1,099.29 |
| 1660 | Concrete-class AA | CUYD A A | 105.40 | $2,500.00 | $2,266.63 |
| 1670 | Steel reinforcement | LB A A | 67,669 | $2.00 | $1.80 |
| 1680 | Steel reinforcement-epoxy coated | LB A A | 27,061 | $2.00 | $1.90 |
| 1690 | Precast PC I beam type 3 | LF A A | 340 | $750.00 | $726.35 |
| 1700 | Concrete sealing | SQFT A A | 8,458 | $2.00 | $1.90 |
| 1710 | Rail system single slope - 40 in | LF A A | 174.60 | $225.00 | $205.00 |
| 1720 | Mobilization for concrete surf treatment | LS A A | 1 | $1,750.00 | $1,416.87 |
| 1730 | G directional bore | LF A A | 460 | $340.00 | $358.00 |
| 1740 | G encasement special | LF A A | 380 | $320.00 | $336.00 |
| 1750 | G encasement steel bored range 1 | LF A A | 140 | $360.00 | $380.00 |
| 1760 | G encasement steel bored range 2 | LF A A | 80 | $420.00 | $442.00 |
| 1770 | G encasement steel bored range 4 | LF A A | 230 | $460.00 | $484.00 |
| 1780 | G encasement steel open cut range 4 | LF A A | 70 | $320.00 | $337.00 |
| 1790 | G pipe polyethylene/plastic 02 inch | LF A A | 1,982 | $65.00 | $68.00 |
| 1800 | G pipe polyethylene/plastic 04 inch | LF A A | 242 | $65.00 | $68.00 |
| 1810 | G pipe polyethylene/plastic 06 inch | LF A A | 4,615 | $77.00 | $81.00 |
| 1820 | G pipe special | LF A A | 300 | $125.00 | $132.00 |
| 1830 | G service long side 3/4 inch | EACH A A | 3 | $2,500.00 | $2,630.00 |
| 1840 | G service short side 2 inch | EACH A A | 3 | $3,400.00 | $3,580.00 |
| 1850 | G service short side 3/4 inch | EACH A A | 6 | $1,750.00 | $1,840.00 |
| 1860 | G tie-in polyethylene/plastic 02 inch | EACH A A | 3 | $3,400.00 | $3,580.00 |
| 1870 | G tie-in polyethylene/plastic 04 inch | EACH A A | 1 | $5,600.00 | $5,895.00 |
| 1880 | G tie-in polyethylene/plastic 06 inch | EACH A A | 2 | $7,200.00 | $7,580.00 |
| 1890 | G valve polyethylene/plastic 02 inch | EACH A A | 6 | $850.00 | $895.00 |
| 1900 | G valve polyethylene/plastic 04 inch | EACH A A | 2 | $1,150.00 | $1,210.00 |
| 1910 | G valve polyethylene/plastic 06 inch | EACH A A | 11 | $1,450.00 | $1,525.00 |
| 1920 | G tie-in steel 06 inch | EACH A A | 1 | $25,000 | $26,315 |
| 1930 | G cap existing main | EACH A A | 7 | $5,200.00 | $5,475.00 |
| 1940 | S directional bore | LF A A | 250 | $98.85 | $104.00 |
| 1950 | S encasement special | LF A A | 430 | $123.95 | $130.00 |
| 1960 | S encasement steel bored range 1 | LF A A | 70 | $183.45 | $193.00 |
| 1970 | S encasement steel bored range 3 | LF A A | 175 | $265.00 | $280.00 |
| 1980 | S encasement steel bored range 4 | LF A A | 435 | $570.00 | $600.00 |
| 1990 | S encasement steel bored range 6 | LF A A | 80 | $425.00 | $447.00 |
| 2000 | S encasement steel open cut range 1 | LF A A | 130 | $190.00 | $200.00 |
| 2010 | S encasement steel open cut range 3 | LF A A | 70 | $295.00 | $310.00 |
| 2020 | S encasement steel open cut range 4 | LF A A | 60 | $415.00 | $437.00 |
| 2030 | S force main air RLS/vac VLV 03 in | EACH A A | 5 | $7,350.00 | $7,737.00 |
| 2040 | S force main PVC 02 inch | LF A A | 295 | $36.25 | $38.00 |
| 2050 | S force main PVC 03 inch | LF A A | 315 | $39.50 | $42.00 |
| 2060 | S force main PVC 06 inch | LF A A | 3,570 | $47.45 | $50.00 |
| 2070 | S force main PVC 10 inch | LF A A | 460 | $87.15 | $92.00 |
| 2080 | S force main tap sleeve/valve RNG 1 | EACH A A | 2 | $4,570.00 | $4,810.00 |
| 2090 | S force main tie-in 02 inch | EACH A A | 2 | $1,900.00 | $2,000.00 |
| 2100 | S force main tie-in 03 inch | EACH A A | 2 | $1,900.00 | $2,000.00 |
| 2110 | S force main tie-in 06 inch | EACH A A | 1 | $2,015.00 | $2,120.00 |
| 2120 | S force main tie-in 10 inch | EACH A A | 2 | $2,765.00 | $2,910.00 |
| 2130 | S force main tie-in special | EACH A A | 5 | $1,715.00 | $1,800.00 |
| 2140 | S force main valve gate | EACH A A | 8 | $3,260.00 | $3,430.00 |
| 2150 | S lateral cleanout | EACH A A | 12 | $1,605.00 | $1,690.00 |
| 2160 | S lateral long side 04 inch | EACH A A | 1 | $6,500.00 | $6,840.00 |
| 2170 | S lateral short side 04 inch | EACH A A | 9 | $3,400.00 | $3,580.00 |
| 2180 | S lateral short side 06 inch | EACH A A | 3 | $4,150.00 | $4,370.00 |
| 2190 | S manhole | EACH A A | 20 | $5,400.00 | $5,685.00 |
| 2200 | S manhole special | EACH A A | 7 | $3,500.00 | $3,685.00 |
| 2210 | S manhole with drop | EACH A A | 3 | $4,125.00 | $4,342.00 |
| 2220 | S pipe ductile iron 08 inch | LF A A | 277 | $215.00 | $226.00 |
| 2230 | S pipe PVC 08 inch | LF A A | 2,008 | $173.00 | $182.00 |
| 2240 | S pipe special | LF A A | 277 | $30.00 | $32.00 |
| 2250 | S cap existing main | EACH A A | 8 | $1,470.00 | $1,550.00 |
| 2260 | Pole 30 FT MTG HT | EACH A A | 2 | $3,710.00 | $6,840.00 |
| 2270 | Bracket 8 FT | EACH A A | 2 | $1,786.00 | $5,260.00 |
| 2280 | Pole base | EACH A A | 2 | $3,020.00 | $3,157.00 |
| 2290 | Transformer base | EACH A A | 2 | $2,653.00 | $1,050.00 |
| 2300 | Lighting control equipment | EACH A A | 1 | $21,760 | $19,950 |
| 2310 | Trenching and backfilling | LF A A | 8 | $19.81 | $16.00 |
| 2320 | Cable-no. 14/5C | LF A A | 712 | $6.68 | $4.50 |
| 2330 | Cable-no. 14/7C | LF A A | 342 | $7.38 | $4.90 |
| 2340 | Messenger-10800 LB | LF A A | 448 | $10.43 | $10.30 |
| 2350 | Install steel strain pole | EACH A A | 4 | $1,493.00 | $15,790 |
| 2360 | Remove signal equipment | EACH A A | 1 | $15,290 | $21,050 |
| 2370 | Install span mounted sign | EACH A A | 2 | $430.00 | $526.00 |
| 2375 | Mechanical reinf coupler #5 epoxy coated | EACH A A | 8 | $125.00 | $67.00 |
| 2380 | Install LED signal-3 section | EACH A A | 8 | $426.00 | $947.00 |
| 2390 | Install LED signal- 4 section | EACH A A | 2 | $476.00 | $1,052.00 |
| 2400 | Relocate signal head | EACH A A | 10 | $381.00 | $263.00 |
| 2410 | Remove & reinstall coordinating unit | EACH A A | 1 | $3,589.00 | $2,632.00 |
| 2420 | Traffic signal pole base | CUYD A A | 16.40 | $3,231.00 | $316.00 |
| 2425 | Mechanical reinf coupler #8-epoxy coated | EACH A A | 18 | $150.00 | $126.00 |
| 2430 | Remove store & reinstall | EACH A A | 2 | $288.00 | $1,580.00 |
| 2440 | Cable-no. 10/3C ducted | LF A A | 270 | $8.63 | $5.70 |
| 2450 | PVC conduit-2 in-schedule 80 | LF A A | 32 | $15.27 | $1.70 |
| 2460 | Install signal controller-TY atc | EACH A A | 1 | $11,870 | $7,370.00 |
| 2470 | Install radar presence detector type A | EACH A A | 4 | $1,246.00 | $1,570.00 |
| 2480 | Install solar school flasher assembly | EACH A A | 2 | $2,136.00 | $15,790 |
| 2490 | W cap existing main | EACH A A | 17 | $4,500.00 | $4,736.00 |
| 2500 | W directional bore | LF A A | 1,371 | $360.00 | $379.00 |
| 2510 | W encasement steel bored range 2 | LF A A | 160 | $460.00 | $484.00 |
| 2520 | W encasement steel bored range 3 | LF A A | 275 | $520.00 | $547.00 |
| 2530 | W encasement steel bored range 4 | LF A A | 290 | $580.00 | $610.00 |
| 2540 | W encasement steel bored range 5 | LF A A | 550 | $690.00 | $726.00 |
| 2550 | W flush hydrant assembly | EACH A A | 3 | $22,500 | $23,680 |
| 2560 | W flushing assembly | EACH A A | 5 | $14,500 | $15,260 |
| 2570 | W meter 3/4 inch | EACH A A | 30 | $1,500.00 | $1,580.00 |
| 2580 | W meter vault | EACH A A | 1 | $125,000 | $131,580 |
| 2590 | W pipe ductile iron 06 inch | LF A A | 615 | $95.00 | $100.00 |
| 2600 | W pipe ductile iron 12 inch | LF A A | 435 | $132.00 | $139.00 |
| 2610 | W pipe PVC 03 inch | LF A A | 2,545 | $78.00 | $82.00 |
| 2620 | W pipe PVC 04 inch | LF A A | 600 | $85.00 | $90.00 |
| 2630 | W pipe PVC 06 inch | LF A A | 3,170 | $95.00 | $100.00 |
| 2640 | W pipe PVC 08 inch | LF A A | 230 | $105.00 | $110.00 |
| 2650 | W pipe PVC 12 inch | LF A A | 4,870 | $135.00 | $142.00 |
| 2660 | W pipe PVC 16 inch | LF A A | 7,305 | $140.00 | $147.00 |
| 2670 | W pipe polyethylene/plastic 08 inch | LF A A | 480 | $85.00 | $90.00 |
| 2680 | W pipe polyethylene/plastic special | LF A A | 276 | $135.00 | $142.00 |
| 2690 | W serv PE/PLST short side 3/4 in | EACH A A | 50 | $2,400.00 | $2,526.00 |
| 2700 | W tapping sleeve and valve size 1 | EACH A A | 16 | $16,500 | $17,370 |
| 2710 | W tapping sleeve and valve size 2 | EACH A A | 2 | $45,000 | $47,370 |
| 2720 | W tie-in 03 inch | EACH A A | 1 | $5,800.00 | $6,105.00 |
| 2730 | W tie-in 06 inch | EACH A A | 1 | $7,500.00 | $7,895.00 |
| 2740 | W tie-in 08 inch | EACH A A | 2 | $8,500.00 | $8,950.00 |
| 2750 | W tie-in 10 inch | EACH A A | 1 | $12,500 | $13,160 |
| 2760 | W tie-in 12 inch | EACH A A | 1 | $14,500 | $15,260 |
| 2770 | W valve 03 inch | EACH A A | 2 | $1,200.00 | $1,260.00 |
| 2780 | W valve 04 inch | EACH A A | 2 | $2,200.00 | $2,315.00 |
| 2790 | W valve 06 inch | EACH A A | 6 | $3,800.00 | $4,000.00 |
| 2800 | W valve 08 inch | EACH A A | 3 | $4,800.00 | $5,050.00 |
| 2810 | W valve 10 inch | EACH A A | 1 | $7,800.00 | $8,210.00 |
| 2820 | W valve 12 inch | EACH A A | 8 | $8,200.00 | $8,631.00 |
| 2830 | W valve 16 inch | EACH A A | 9 | $22,000 | $23,160 |
| 2840 | W encasement special | LF A A | 1,836 | $420.00 | $440.00 |
| 2850 | W leak detection meter | EACH A A | 3 | $3,200.00 | $3,370.00 |
| 2860 | Mobilization | LS A A | 1 | $1,942,550 | $2,325,000 |
| 2870 | Demobilization | LS A A | 1 | $655,000 | $757,500 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of May 21, 2026. Compiled by Mirage Metrics.