KYTC contract 25-1125 bid tabulation
GRADE & DRAIN WITH ASPHALT SURFACE KY 550 (COMBS ROAD). Let by Kentucky Transportation Cabinet on November 20, 2025. 3 bids received; low bid $761,664 by Frederick & May Construction Co, -8.5% against the engineer's estimate of $832,202.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 20 NOV 2025
- Pay items
- 75
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Frederick & May Construction Co | $761,664 | Low | -8.0% |
| 2 | Mountain Enterprises Inc | $766,144 | +1.0% | -8.0% |
| 3 | Hinkle Construction Services LLC | $898,497 | +18% | +8.0% |
Engineer's estimate: $832,202.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Frederick & May Construction Co | 2. Mountain Enterprises Inc | 3. Hinkle Construction Services LLC |
|---|---|---|---|---|---|---|
| 0010 | Crushed stone base | TON A A | 170 | $66.00 | $85.50 | $75.00 |
| 0020 | CL2 asph base 1.00D PG64-22 | TON A A | 147 | $341.85 | $341.85 | $360.00 |
| 0030 | CL2 asph surf 0.38B PG64-22 | TON A A | 330 | $273.75 | $273.75 | $290.00 |
| 0040 | Cem conc ent pavement-6 in | SQYD A A | 288 | $140.00 | $97.50 | $175.00 |
| 0050 | Asphalt pave milling & texturing | TON A A | 322 | $87.70 | $87.70 | $92.00 |
| 0060 | Asphalt material for tack non-tracking | TON A A | 1.40 | $925.00 | $925.00 | $975.00 |
| 0070 | Perforated pipe-4 in | LF A A | 86 | $25.00 | $36.50 | $41.00 |
| 0080 | Non-perforated pipe-4 in | LF A A | 4 | $25.00 | $49.15 | $135.00 |
| 0090 | Remove pipe | LF A A | 317 | $30.00 | $25.75 | $43.25 |
| 0100 | Plug pipe | EACH A A | 6 | $500.00 | $2,400.00 | $450.00 |
| 0110 | Remove inlet | EACH A A | 3 | $1,000.00 | $1,550.00 | $825.00 |
| 0120 | Lip curb and gutter mod | LF A A | 98 | $100.00 | $76.00 | $147.00 |
| 0130 | Barricade-type III | EACH A A | 22 | $75.00 | $190.00 | $165.00 |
| 0140 | Remove pavement | SQYD A A | 47 | $20.00 | $26.75 | $82.00 |
| 0150 | Paved ditch type 1 mod | SQYD A A | 2 | $500.00 | $304.15 | $3,575.00 |
| 0160 | Temp ditch | LF A A | 286 | $1.00 | $1.45 | $1.70 |
| 0170 | Clean temp ditch | LF A A | 143 | $0.10 | $0.45 | $1.35 |
| 0180 | Ditching | LF A A | 151 | $10.00 | $20.76 | $31.25 |
| 0190 | Water | MGAL A A | 50 | $1.00 | $0.24 | $0.01 |
| 0200 | Channel lining class III | TON A A | 58 | $66.50 | $105.15 | $150.00 |
| 0210 | Clearing and grubbing | LS A A | 1 | $41,541 | $15,550 | $15,250 |
| 0220 | Concrete-class B | CUYD A A | 3 | $2,000.00 | $2,030.00 | $1,055.00 |
| 0230 | Temporary signs | SQFT A A | 329 | $13.00 | $14.15 | $13.40 |
| 0240 | Fabric-geotextile class 2 for pipe | SQYD A A | 726 | $2.00 | $2.00 | $2.00 |
| 0250 | Maintain & control traffic | LS A A | 1 | $36,000 | $34,000 | $65,000 |
| 0260 | Portable changeable message sign | EACH A A | 3 | $3,750.00 | $3,750.00 | $875.00 |
| 0270 | Mobilization for mill & text | LS A A | 1 | $5,800.00 | $5,800.00 | $6,100.00 |
| 0280 | Safeloading | CUYD A A | 10 | $1,000.00 | $715.00 | $540.00 |
| 0290 | Temp silt fence | LF A A | 286 | $3.00 | $3.50 | $5.90 |
| 0300 | Silt trap type A | EACH A A | 1 | $125.00 | $445.00 | $195.00 |
| 0310 | Silt trap type B | EACH A A | 1 | $125.00 | $445.00 | $790.00 |
| 0320 | Silt trap type C | EACH A A | 1 | $125.00 | $565.00 | $485.00 |
| 0330 | Clean silt trap type A | EACH A A | 1 | $10.00 | $41.00 | $195.00 |
| 0340 | Clean silt trap type B | EACH A A | 1 | $10.00 | $41.00 | $195.00 |
| 0350 | Clean silt trap type C | EACH A A | 1 | $10.00 | $41.00 | $195.00 |
| 0360 | Staking | LS A A | 1 | $8,000.00 | $17,800 | $9,875.00 |
| 0370 | Remove structure | LS A A | 1 | $35,000 | $35,300 | $39,000 |
| 0380 | Clean pipe structure | EACH A A | 6 | $1,200.00 | $2,775.00 | $1,160.00 |
| 0390 | Temp mulch | SQYD A A | 1,509 | $0.50 | $0.35 | $1.90 |
| 0400 | Temp seeding and protection | SQYD A A | 1,126 | $0.50 | $0.40 | $2.20 |
| 0410 | Initial fertilizer | TON A A | 0.10 | $2,000.00 | $2,000.00 | $3,125.00 |
| 0420 | Maintenance fertilizer | TON A A | 0.10 | $2,000.00 | $2,000.00 | $3,125.00 |
| 0430 | Seeding and protection | SQYD A A | 1,449 | $1.25 | $1.25 | $3.10 |
| 0440 | Agricultural limestone | TON A A | 0.90 | $200.00 | $150.00 | $1,250.00 |
| 0450 | Pave striping-temp paint-4 in | LF A A | 6,556 | $1.30 | $1.30 | $1.40 |
| 0460 | Pave striping-perm paint-4 in | LF A A | 3,802 | $1.00 | $1.00 | $1.05 |
| 0470 | Pave marking-paint cross-hatch | SQFT A A | 98 | $3.00 | $3.00 | $3.15 |
| 0480 | Pave marking-thermo curv arrow | EACH A A | 4 | $125.00 | $125.00 | $132.00 |
| 0490 | Inlaid pavement marker-by | EACH A A | 26 | $75.00 | $75.00 | $79.00 |
| 0500 | Joint adhesive | LF A A | 2,030 | $1.75 | $1.75 | $1.85 |
| 0510 | Law enforcement officer | HOUR A A | 100 | $175.00 | $85.00 | $75.00 |
| 0520 | Sawcut pavement | LF A A | 592 | $6.00 | $3.70 | $5.25 |
| 0530 | Turf reinforcement mat 1 | SQYD A A | 73 | $25.00 | $20.00 | $25.00 |
| 0540 | Pipeline inspection | LF A A | 363 | $6.89 | $6.90 | $7.25 |
| 0550 | Storm sewer pipe-18 in | LF A A | 129 | $250.00 | $201.00 | $175.00 |
| 0560 | Storm sewer pipe-30 in | LF A A | 298 | $260.00 | $257.35 | $440.00 |
| 0570 | Pipe culvert headwall-30 in | EACH A A | 2 | $3,100.00 | $4,733.75 | $3,000.00 |
| 0580 | Sloped and parallel headwall-18 in | EACH A A | 2 | $2,200.00 | $3,947.50 | $2,200.00 |
| 0590 | Drop box inlet type 5F | EACH A A | 1 | $5,200.00 | $9,951.50 | $11,450 |
| 0600 | Drop box inlet type 6F | EACH A A | 2 | $6,000.00 | $10,740 | $9,380.00 |
| 0610 | Drop box inlet type 13G | EACH A A | 2 | $4,000.00 | $8,330.00 | $7,825.00 |
| 0620 | Manhole type C | EACH A A | 2 | $6,400.00 | $5,930.00 | $4,995.00 |
| 0630 | Drop box inlet type 12A modified | LF A A | 37.17 | $525.00 | $955.15 | $895.00 |
| 0640 | W meter relocate | EACH A A | 2 | $3,500.00 | $3,000.00 | $1,895.00 |
| 0650 | W pipe ductile iron 06 inch | LF A A | 75 | $200.00 | $175.00 | $189.00 |
| 0660 | W serv PE/PLST short side 3/4 in | EACH A A | 2 | $800.00 | $2,000.00 | $895.00 |
| 0670 | W service special | EACH A A | 1 | $3,500.00 | $5,000.00 | $3,685.00 |
| 0680 | W tie-in 06 inch | EACH A A | 2 | $6,000.00 | $3,500.00 | $11,050 |
| 0690 | W valve 06 inch | EACH A A | 1 | $3,000.00 | $3,200.00 | $6,840.00 |
| 0700 | S special item | EACH A A | 3 | $8,980.00 | $3,000.00 | $10,000 |
| 0710 | G pipe polyethylene/plastic 04 inch | LF A A | 100 | $180.00 | $200.00 | $190.00 |
| 0720 | G service special | EACH A A | 1 | $2,400.00 | $3,000.00 | $2,525.00 |
| 0730 | G tie-in polyethylene/plastic 04 inch | EACH A A | 2 | $2,800.00 | $3,200.00 | $2,950.00 |
| 0740 | G valve polyethylene/plastic 04 inch | EACH A A | 1 | $3,500.00 | $1,250.00 | $3,685.00 |
| 0750 | Demobilization | LS A A | 1 | $11,257 | $11,350 | $13,500 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of November 20, 2025. Compiled by Mirage Metrics.