KYTC contract 25-1123 bid tabulation

GRADE & DRAIN WITH ASPHALT SURFACE US 68 IMPROVEMENTS. Let by Kentucky Transportation Cabinet on November 20, 2025. 3 bids received; low bid $9,896,586 by Scotty'S Contracting & Stone LLC, -27% against the engineer's estimate of $13,560,713.

Owner
Kentucky Transportation Cabinet
Letting
20 NOV 2025
Pay items
124
Data through
22 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Scotty'S Contracting & Stone LLC$9,896,586Low-27%
2Hinkle Construction Services LLC$10,598,850+7.0%-22%
3Cleary Construction Inc$11,250,000+14%-17%
KYTC contract 25-1123: bids by rank

Engineer's estimate: $13,560,713.

Bid tabulation

LinePay itemUnitQuantity1. Scotty'S Contracting & Stone LLC2. Hinkle Construction Services LLC3. Cleary Construction Inc
0010Crushed stone baseTON A A23,448$28.49$30.00$32.00
0020Asphalt seal aggregateTON A A247$143.29$81.50$90.00
0030Asphalt seal coatTON A A29$1,033.29$1,020.00$1,100.00
0040Leveling & wedging PG64-22TON A A2,374$100.58$119.00$95.00
0050CL2 asph base 0.75D PG64-22TON A A10,778$92.20$100.00$90.00
0060CL2 asph surf 0.38D PG64-22TON A A4,216$101.74$114.25$100.00
0070Asphalt pave milling & texturingTON A A52$75.01$100.50$145.00
0080Asphalt material for tack non-trackingTON A A14.17$598.24$714.00$0.01
0090Drainage blanket-embankmentCUYD A A234$70.12$53.95$85.00
0100Crushed aggregate size no 2TON A A206$81.41$33.15$38.00
0110Delineator for guardrail mono directional whiteEACH A A41$15.52$12.00$20.00
0120Remove pavementSQYD A A7,859$3.77$5.80$5.43
0130Temp ditchLF A A4,680$0.01$1.00$1.00
0140Clean temp ditchLF A A2,340$0.01$0.01$0.01
0150Roadway excavationCUYD A A389,233$8.99$8.27$10.15
0160WaterMGAL A A89$0.01$0.01$0.01
0170Adjust guardrailLF A A75$4.32$75.00$1.00
0180Guardrail-steel W beam-S faceLF A A3,912.50$30.99$27.50$40.00
0190Guardrail terminal section no 1EACH A A10$82.12$75.00$100.00
0200Guardrail connector to bridge end TY AEACH A A2$4,048.15$3,300.00$4,500.00
0210Guardrail end treatment type 1EACH A A7$3,551.47$3,000.00$4,500.00
0220Guardrail end treatment type 7EACH A A1$1,953.75$1,800.00$2,000.00
0230Guardrail end treatment type 3EACH A A2$1,945.71$900.00$4,000.00
0240Remove guardrailLF A A2,192$3.82$5.00$2.00
0250Right-of-way monument type 1EACH A A76$221.45$190.00$150.00
0260Witness postEACH A A4$155.66$78.00$150.00
0270Channel lining class IVCUYD A A77.25$168.50$38.00$30.00
0280Clearing and grubbingLS A A1$21,285$72,000$50,000
0290Clearing and grubbingLS A A1$120,615$72,000$275,000
0300Temporary signsSQFT A A198.75$7.71$10.50$10.60
0310Edge keyLF A A203$50.98$53.00$19.40
0320Fabric-geotextile class 1SQYD A A53,611$1.54$1.60$2.20
0330Fabric-geotextile class 2SQYD A A1,770$4.27$1.60$2.50
0340Maintain & control trafficLS A A1$34,389$42,000$48,000
0350Maintain & control trafficLS A A1$45,464$36,000$125,000
0360Portable changeable message signEACH A A2$12,535$10,750$8,162.00
0370Mobilization for mill & textLS A A1$1,145.34$2,650.00$3,500.00
0380Mobilization for mill & textLS A A1$1,145.34$2,650.00$3,500.00
0390SafeloadingCUYD A A14.80$650.00$515.00$450.00
0400Edgeline rumble stripsLF A A17,915$0.29$0.31$0.37
0410Temp silt fenceLF A A4,680$3.85$5.75$2.75
0420Silt trap type AEACH A A31$246.72$245.00$300.00
0430Silt trap type BEACH A A31$164.48$290.00$150.00
0440Silt trap type CEACH A A31$164.48$340.00$300.00
0450Clean silt trap type AEACH A A31$0.01$50.00$1.00
0460Clean silt trap type BEACH A A31$0.01$50.00$1.00
0470Clean silt trap type CEACH A A31$0.01$45.00$1.00
0480StakingLS A A1$29,606$27,000$50,000
0490StakingLS A A1$47,369$38,000$100,000
0500Remove structureLS A A1$34,072$35,000$50,000
0510Arrow panelEACH A A2$683.70$3,800.00$3,339.00
0520Erosion control blanketSQYD A A3,002$1.75$3.40$1.75
0530Temp mulchSQYD A A103,122$0.25$0.32$0.25
0540Temp seeding and protectionSQYD A A76,956$0.30$0.35$0.30
0550Initial fertilizerTON A A7.95$1,500.00$1,895.00$1,500.00
0560Maintenance fertilizerTON A A4.81$1,500.00$1,895.00$1,500.00
0570Seeding and protectionSQYD A A95,772$0.42$0.72$0.42
0580Special seeding crown vetchSQYD A A6,513$0.42$0.34$0.42
0590Agricultural limestoneTON A A97.50$85.00$158.00$85.00
0600SBM alum sheet signs .080 inSQFT A A340$46.16$50.00$60.00
0610SBM alum sheet signs .125 inSQFT A A84$51.54$50.00$60.00
0620Steel post type 1LF A A657$30.84$50.00$25.00
0630Class A concrete for signsCUYD A A2.50$1,639.50$1,050.00$1,000.00
0640Pave striping-perm paint-4 inLF A A38,077$0.40$0.42$0.40
0650Pave striping-dur TY 1-4 in WLF A A400$10.00$10.50$10.00
0660Pave striping-dur TY 1-4 in YLF A A400$10.00$10.50$10.00
0670Pave marking-thermo stop bar-24INLF A A60$15.00$12.60$15.00
0690Fuel adjustmentDOLL A A568,161$1.00$1.00$1.00
0710Asphalt adjustmentDOLL A A54,782$1.00$1.00$1.00
0720Joint adhesiveLF A A9,385$0.65$0.84$0.65
0730Object marker TY 3EACH A A7$37.87$115.00$100.00
0740Centerline rumble stripsLF A A8,758$0.22$0.31$0.40
0750GMSS type DEACH A A10$519.46$790.00$1,000.00
0760Barcode sign inventoryEACH A A98$47.62$53.00$20.00
0770Object marker type 4EACH A A3$380.86$525.00$100.00
0780Pipeline inspectionLF A A1,383$2.35$2.50$2.35
0790Thrie beam guardrail transition TL-3EACH A A4$4,420.68$2,650.00$4,000.00
0800Electronic delivery MGMT system - aggLS A A1$0.01$0.01$1.00
0810Electronic delivery MGMT system - aggLS A A1$0.01$0.01$1.00
0820Crushed aggregate size no 2TON A A7$151.83$175.00$550.00
0830Entrance pipe-15 inLF A A124$81.85$67.00$80.00
0840Entrance pipe-18 inLF A A144$95.45$74.00$105.00
0850Culvert pipe-18 inLF A A134$118.31$83.00$100.00
0860Culvert pipe-24 inLF A A457.58$160.87$181.00$125.00
0870Culvert pipe-36 inLF A A311$241.01$176.00$215.00
0880Culvert pipe-48 inLF A A137$284.19$327.00$370.00
0890Perforated pipe-4 inLF A A450$17.35$19.30$20.00
0900Non-perforated pipe-4 inLF A A70$41.88$19.50$25.00
0910Perf pipe headwall TY 1-4 inEACH A A4$1,810.24$635.00$1,200.00
0920Perf pipe headwall TY 3-4 inEACH A A2$1,810.24$978.00$1,600.00
0930Perf pipe headwall TY 4-4 inEACH A A1$1,645.67$865.00$1,550.00
0940Pipe culvert headwall-18 inEACH A A2$2,200.00$2,000.00$2,500.00
0950Pipe culvert headwall-24 inEACH A A1$2,600.00$2,145.00$3,500.00
0960Pipe culvert headwall-24 inEACH A A7$2,600.00$2,145.00$3,500.00
0970Pipe culvert headwall-36 inEACH A A2$5,000.00$7,830.00$9,500.00
0980Pipe culvert headwall-48 inEACH A A2$5,500.00$4,000.00$6,000.00
0990S & F box inlet-outlet-24 inEACH A A2$4,200.00$4,880.00$6,500.00
1000Drop box inlet type 1EACH A A3$6,000.00$7,785.00$9,500.00
1010Drop box inlet type 10 modEACH A A1$6,500.00$4,385.00$6,000.00
1020Drop box inlet type 11EACH A A2$4,800.00$3,595.00$5,000.00
1030Fabric-geotextile class 2SQYD A A228$3.30$2.00$4.00
1040Structure excav-solid rockCUYD A A44$100.00$120.00$120.00
1050Foundation preparationLS A A1$20,000$32,500$17,000
1060Concrete-class ACUYD A A154.40$800.00$1,110.00$1,292.00
1070Steel reinforcementLB A A18,041$1.50$1.60$1.64
1080Structure granular backfillCUYD A A346$36.00$99.50$49.85
1090Armored edge for concreteLF A A76$70.00$81.00$88.28
1100Structure excav-solid rockCUYD A A227.40$100.00$69.00$120.00
1110Foundation preparationLS A A1$30,000$295,000$35,000
1120Cyclopean stone rip rapTON A A1,342$40.00$47.00$49.64
1130Crushed aggregate slope protTON A A48$40.00$69.00$63.86
1140Test pilesLF A A36$95.00$123.00$172.73
1150Piles-steel HP14X89LF A A259$95.00$134.00$113.46
1160Pile points-14 inEACH A A9$165.00$195.00$198.00
1170Concrete-class ACUYD A A238.10$900.00$1,530.00$837.00
1180Concrete-class AACUYD A A280.90$1,000.00$1,250.00$1,175.00
1190Steel reinforcementLB A A31,290$1.70$1.75$1.59
1200Steel reinforcement-epoxy coatedLB A A92,105$1.50$1.70$1.66
1210Precast PC I beam type 4LF A A1,003.30$522.00$545.00$506.41
1220Concrete sealingSQFT A A17,929$0.50$1.10$1.45
1230Deck drainEACH A A16$600.00$955.00$640.00
1240Rail system single slope - 40 inLF A A406$120.00$156.00$183.80
1250MobilizationLS A A1$274,051$339,000$498,000
1260DemobilizationLS A A1$132,999$143,500$150,402
KYTC contract 25-1123: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.

Every contract let that day: KYTC letting of November 20, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy