KYTC contract 25-1123 bid tabulation
GRADE & DRAIN WITH ASPHALT SURFACE US 68 IMPROVEMENTS. Let by Kentucky Transportation Cabinet on November 20, 2025. 3 bids received; low bid $9,896,586 by Scotty'S Contracting & Stone LLC, -27% against the engineer's estimate of $13,560,713.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 20 NOV 2025
- Pay items
- 124
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Scotty'S Contracting & Stone LLC | $9,896,586 | Low | -27% |
| 2 | Hinkle Construction Services LLC | $10,598,850 | +7.0% | -22% |
| 3 | Cleary Construction Inc | $11,250,000 | +14% | -17% |
Engineer's estimate: $13,560,713.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Scotty'S Contracting & Stone LLC | 2. Hinkle Construction Services LLC | 3. Cleary Construction Inc |
|---|---|---|---|---|---|---|
| 0010 | Crushed stone base | TON A A | 23,448 | $28.49 | $30.00 | $32.00 |
| 0020 | Asphalt seal aggregate | TON A A | 247 | $143.29 | $81.50 | $90.00 |
| 0030 | Asphalt seal coat | TON A A | 29 | $1,033.29 | $1,020.00 | $1,100.00 |
| 0040 | Leveling & wedging PG64-22 | TON A A | 2,374 | $100.58 | $119.00 | $95.00 |
| 0050 | CL2 asph base 0.75D PG64-22 | TON A A | 10,778 | $92.20 | $100.00 | $90.00 |
| 0060 | CL2 asph surf 0.38D PG64-22 | TON A A | 4,216 | $101.74 | $114.25 | $100.00 |
| 0070 | Asphalt pave milling & texturing | TON A A | 52 | $75.01 | $100.50 | $145.00 |
| 0080 | Asphalt material for tack non-tracking | TON A A | 14.17 | $598.24 | $714.00 | $0.01 |
| 0090 | Drainage blanket-embankment | CUYD A A | 234 | $70.12 | $53.95 | $85.00 |
| 0100 | Crushed aggregate size no 2 | TON A A | 206 | $81.41 | $33.15 | $38.00 |
| 0110 | Delineator for guardrail mono directional white | EACH A A | 41 | $15.52 | $12.00 | $20.00 |
| 0120 | Remove pavement | SQYD A A | 7,859 | $3.77 | $5.80 | $5.43 |
| 0130 | Temp ditch | LF A A | 4,680 | $0.01 | $1.00 | $1.00 |
| 0140 | Clean temp ditch | LF A A | 2,340 | $0.01 | $0.01 | $0.01 |
| 0150 | Roadway excavation | CUYD A A | 389,233 | $8.99 | $8.27 | $10.15 |
| 0160 | Water | MGAL A A | 89 | $0.01 | $0.01 | $0.01 |
| 0170 | Adjust guardrail | LF A A | 75 | $4.32 | $75.00 | $1.00 |
| 0180 | Guardrail-steel W beam-S face | LF A A | 3,912.50 | $30.99 | $27.50 | $40.00 |
| 0190 | Guardrail terminal section no 1 | EACH A A | 10 | $82.12 | $75.00 | $100.00 |
| 0200 | Guardrail connector to bridge end TY A | EACH A A | 2 | $4,048.15 | $3,300.00 | $4,500.00 |
| 0210 | Guardrail end treatment type 1 | EACH A A | 7 | $3,551.47 | $3,000.00 | $4,500.00 |
| 0220 | Guardrail end treatment type 7 | EACH A A | 1 | $1,953.75 | $1,800.00 | $2,000.00 |
| 0230 | Guardrail end treatment type 3 | EACH A A | 2 | $1,945.71 | $900.00 | $4,000.00 |
| 0240 | Remove guardrail | LF A A | 2,192 | $3.82 | $5.00 | $2.00 |
| 0250 | Right-of-way monument type 1 | EACH A A | 76 | $221.45 | $190.00 | $150.00 |
| 0260 | Witness post | EACH A A | 4 | $155.66 | $78.00 | $150.00 |
| 0270 | Channel lining class IV | CUYD A A | 77.25 | $168.50 | $38.00 | $30.00 |
| 0280 | Clearing and grubbing | LS A A | 1 | $21,285 | $72,000 | $50,000 |
| 0290 | Clearing and grubbing | LS A A | 1 | $120,615 | $72,000 | $275,000 |
| 0300 | Temporary signs | SQFT A A | 198.75 | $7.71 | $10.50 | $10.60 |
| 0310 | Edge key | LF A A | 203 | $50.98 | $53.00 | $19.40 |
| 0320 | Fabric-geotextile class 1 | SQYD A A | 53,611 | $1.54 | $1.60 | $2.20 |
| 0330 | Fabric-geotextile class 2 | SQYD A A | 1,770 | $4.27 | $1.60 | $2.50 |
| 0340 | Maintain & control traffic | LS A A | 1 | $34,389 | $42,000 | $48,000 |
| 0350 | Maintain & control traffic | LS A A | 1 | $45,464 | $36,000 | $125,000 |
| 0360 | Portable changeable message sign | EACH A A | 2 | $12,535 | $10,750 | $8,162.00 |
| 0370 | Mobilization for mill & text | LS A A | 1 | $1,145.34 | $2,650.00 | $3,500.00 |
| 0380 | Mobilization for mill & text | LS A A | 1 | $1,145.34 | $2,650.00 | $3,500.00 |
| 0390 | Safeloading | CUYD A A | 14.80 | $650.00 | $515.00 | $450.00 |
| 0400 | Edgeline rumble strips | LF A A | 17,915 | $0.29 | $0.31 | $0.37 |
| 0410 | Temp silt fence | LF A A | 4,680 | $3.85 | $5.75 | $2.75 |
| 0420 | Silt trap type A | EACH A A | 31 | $246.72 | $245.00 | $300.00 |
| 0430 | Silt trap type B | EACH A A | 31 | $164.48 | $290.00 | $150.00 |
| 0440 | Silt trap type C | EACH A A | 31 | $164.48 | $340.00 | $300.00 |
| 0450 | Clean silt trap type A | EACH A A | 31 | $0.01 | $50.00 | $1.00 |
| 0460 | Clean silt trap type B | EACH A A | 31 | $0.01 | $50.00 | $1.00 |
| 0470 | Clean silt trap type C | EACH A A | 31 | $0.01 | $45.00 | $1.00 |
| 0480 | Staking | LS A A | 1 | $29,606 | $27,000 | $50,000 |
| 0490 | Staking | LS A A | 1 | $47,369 | $38,000 | $100,000 |
| 0500 | Remove structure | LS A A | 1 | $34,072 | $35,000 | $50,000 |
| 0510 | Arrow panel | EACH A A | 2 | $683.70 | $3,800.00 | $3,339.00 |
| 0520 | Erosion control blanket | SQYD A A | 3,002 | $1.75 | $3.40 | $1.75 |
| 0530 | Temp mulch | SQYD A A | 103,122 | $0.25 | $0.32 | $0.25 |
| 0540 | Temp seeding and protection | SQYD A A | 76,956 | $0.30 | $0.35 | $0.30 |
| 0550 | Initial fertilizer | TON A A | 7.95 | $1,500.00 | $1,895.00 | $1,500.00 |
| 0560 | Maintenance fertilizer | TON A A | 4.81 | $1,500.00 | $1,895.00 | $1,500.00 |
| 0570 | Seeding and protection | SQYD A A | 95,772 | $0.42 | $0.72 | $0.42 |
| 0580 | Special seeding crown vetch | SQYD A A | 6,513 | $0.42 | $0.34 | $0.42 |
| 0590 | Agricultural limestone | TON A A | 97.50 | $85.00 | $158.00 | $85.00 |
| 0600 | SBM alum sheet signs .080 in | SQFT A A | 340 | $46.16 | $50.00 | $60.00 |
| 0610 | SBM alum sheet signs .125 in | SQFT A A | 84 | $51.54 | $50.00 | $60.00 |
| 0620 | Steel post type 1 | LF A A | 657 | $30.84 | $50.00 | $25.00 |
| 0630 | Class A concrete for signs | CUYD A A | 2.50 | $1,639.50 | $1,050.00 | $1,000.00 |
| 0640 | Pave striping-perm paint-4 in | LF A A | 38,077 | $0.40 | $0.42 | $0.40 |
| 0650 | Pave striping-dur TY 1-4 in W | LF A A | 400 | $10.00 | $10.50 | $10.00 |
| 0660 | Pave striping-dur TY 1-4 in Y | LF A A | 400 | $10.00 | $10.50 | $10.00 |
| 0670 | Pave marking-thermo stop bar-24IN | LF A A | 60 | $15.00 | $12.60 | $15.00 |
| 0690 | Fuel adjustment | DOLL A A | 568,161 | $1.00 | $1.00 | $1.00 |
| 0710 | Asphalt adjustment | DOLL A A | 54,782 | $1.00 | $1.00 | $1.00 |
| 0720 | Joint adhesive | LF A A | 9,385 | $0.65 | $0.84 | $0.65 |
| 0730 | Object marker TY 3 | EACH A A | 7 | $37.87 | $115.00 | $100.00 |
| 0740 | Centerline rumble strips | LF A A | 8,758 | $0.22 | $0.31 | $0.40 |
| 0750 | GMSS type D | EACH A A | 10 | $519.46 | $790.00 | $1,000.00 |
| 0760 | Barcode sign inventory | EACH A A | 98 | $47.62 | $53.00 | $20.00 |
| 0770 | Object marker type 4 | EACH A A | 3 | $380.86 | $525.00 | $100.00 |
| 0780 | Pipeline inspection | LF A A | 1,383 | $2.35 | $2.50 | $2.35 |
| 0790 | Thrie beam guardrail transition TL-3 | EACH A A | 4 | $4,420.68 | $2,650.00 | $4,000.00 |
| 0800 | Electronic delivery MGMT system - agg | LS A A | 1 | $0.01 | $0.01 | $1.00 |
| 0810 | Electronic delivery MGMT system - agg | LS A A | 1 | $0.01 | $0.01 | $1.00 |
| 0820 | Crushed aggregate size no 2 | TON A A | 7 | $151.83 | $175.00 | $550.00 |
| 0830 | Entrance pipe-15 in | LF A A | 124 | $81.85 | $67.00 | $80.00 |
| 0840 | Entrance pipe-18 in | LF A A | 144 | $95.45 | $74.00 | $105.00 |
| 0850 | Culvert pipe-18 in | LF A A | 134 | $118.31 | $83.00 | $100.00 |
| 0860 | Culvert pipe-24 in | LF A A | 457.58 | $160.87 | $181.00 | $125.00 |
| 0870 | Culvert pipe-36 in | LF A A | 311 | $241.01 | $176.00 | $215.00 |
| 0880 | Culvert pipe-48 in | LF A A | 137 | $284.19 | $327.00 | $370.00 |
| 0890 | Perforated pipe-4 in | LF A A | 450 | $17.35 | $19.30 | $20.00 |
| 0900 | Non-perforated pipe-4 in | LF A A | 70 | $41.88 | $19.50 | $25.00 |
| 0910 | Perf pipe headwall TY 1-4 in | EACH A A | 4 | $1,810.24 | $635.00 | $1,200.00 |
| 0920 | Perf pipe headwall TY 3-4 in | EACH A A | 2 | $1,810.24 | $978.00 | $1,600.00 |
| 0930 | Perf pipe headwall TY 4-4 in | EACH A A | 1 | $1,645.67 | $865.00 | $1,550.00 |
| 0940 | Pipe culvert headwall-18 in | EACH A A | 2 | $2,200.00 | $2,000.00 | $2,500.00 |
| 0950 | Pipe culvert headwall-24 in | EACH A A | 1 | $2,600.00 | $2,145.00 | $3,500.00 |
| 0960 | Pipe culvert headwall-24 in | EACH A A | 7 | $2,600.00 | $2,145.00 | $3,500.00 |
| 0970 | Pipe culvert headwall-36 in | EACH A A | 2 | $5,000.00 | $7,830.00 | $9,500.00 |
| 0980 | Pipe culvert headwall-48 in | EACH A A | 2 | $5,500.00 | $4,000.00 | $6,000.00 |
| 0990 | S & F box inlet-outlet-24 in | EACH A A | 2 | $4,200.00 | $4,880.00 | $6,500.00 |
| 1000 | Drop box inlet type 1 | EACH A A | 3 | $6,000.00 | $7,785.00 | $9,500.00 |
| 1010 | Drop box inlet type 10 mod | EACH A A | 1 | $6,500.00 | $4,385.00 | $6,000.00 |
| 1020 | Drop box inlet type 11 | EACH A A | 2 | $4,800.00 | $3,595.00 | $5,000.00 |
| 1030 | Fabric-geotextile class 2 | SQYD A A | 228 | $3.30 | $2.00 | $4.00 |
| 1040 | Structure excav-solid rock | CUYD A A | 44 | $100.00 | $120.00 | $120.00 |
| 1050 | Foundation preparation | LS A A | 1 | $20,000 | $32,500 | $17,000 |
| 1060 | Concrete-class A | CUYD A A | 154.40 | $800.00 | $1,110.00 | $1,292.00 |
| 1070 | Steel reinforcement | LB A A | 18,041 | $1.50 | $1.60 | $1.64 |
| 1080 | Structure granular backfill | CUYD A A | 346 | $36.00 | $99.50 | $49.85 |
| 1090 | Armored edge for concrete | LF A A | 76 | $70.00 | $81.00 | $88.28 |
| 1100 | Structure excav-solid rock | CUYD A A | 227.40 | $100.00 | $69.00 | $120.00 |
| 1110 | Foundation preparation | LS A A | 1 | $30,000 | $295,000 | $35,000 |
| 1120 | Cyclopean stone rip rap | TON A A | 1,342 | $40.00 | $47.00 | $49.64 |
| 1130 | Crushed aggregate slope prot | TON A A | 48 | $40.00 | $69.00 | $63.86 |
| 1140 | Test piles | LF A A | 36 | $95.00 | $123.00 | $172.73 |
| 1150 | Piles-steel HP14X89 | LF A A | 259 | $95.00 | $134.00 | $113.46 |
| 1160 | Pile points-14 in | EACH A A | 9 | $165.00 | $195.00 | $198.00 |
| 1170 | Concrete-class A | CUYD A A | 238.10 | $900.00 | $1,530.00 | $837.00 |
| 1180 | Concrete-class AA | CUYD A A | 280.90 | $1,000.00 | $1,250.00 | $1,175.00 |
| 1190 | Steel reinforcement | LB A A | 31,290 | $1.70 | $1.75 | $1.59 |
| 1200 | Steel reinforcement-epoxy coated | LB A A | 92,105 | $1.50 | $1.70 | $1.66 |
| 1210 | Precast PC I beam type 4 | LF A A | 1,003.30 | $522.00 | $545.00 | $506.41 |
| 1220 | Concrete sealing | SQFT A A | 17,929 | $0.50 | $1.10 | $1.45 |
| 1230 | Deck drain | EACH A A | 16 | $600.00 | $955.00 | $640.00 |
| 1240 | Rail system single slope - 40 in | LF A A | 406 | $120.00 | $156.00 | $183.80 |
| 1250 | Mobilization | LS A A | 1 | $274,051 | $339,000 | $498,000 |
| 1260 | Demobilization | LS A A | 1 | $132,999 | $143,500 | $150,402 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of November 20, 2025. Compiled by Mirage Metrics.