KYTC contract 26-5405 bid tabulation
BRIDGE REPLACEMENT CR 1380. Let by Kentucky Transportation Cabinet on February 19, 2026. 5 bids received; low bid $699,711 by Boca Enterprises Inc, -21% against the engineer's estimate of $880,252.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 19 FEB 2026
- Pay items
- 49
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Boca Enterprises Inc | $699,711 | Low | -21% |
| 2 | Walker Construction & Materials LLC | $929,000 | +33% | +6.0% |
| 3 | Hinkle Construction Services LLC | $1,044,476 | +49% | +19% |
| 4 | Frederick & May Construction Co | $1,092,527 | +56% | +24% |
| 5 | Orders Construction Company Inc | $1,175,436 | +68% | +34% |
Engineer's estimate: $880,252.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Boca Enterprises Inc | 2. Walker Construction & Materials LLC | 3. Hinkle Construction Services LLC | 4. Frederick & May Construction Co | 5. Orders Construction Company Inc |
|---|---|---|---|---|---|---|---|---|
| 0010 | Dga base | TON A A | 283 | $75.50 | $95.00 | $80.00 | $75.50 | $88.00 |
| 0020 | Traffic bound base | TON A A | 205 | $75.50 | $69.00 | $62.00 | $55.00 | $61.00 |
| 0030 | Asphalt seal aggregate | TON A A | 1.22 | $1,500.00 | $1,500.00 | $1,575.00 | $1,500.00 | $1,700.00 |
| 0040 | Asphalt seal coat | TON A A | 0.15 | $6,315.00 | $6,315.00 | $6,650.00 | $6,315.00 | $7,300.00 |
| 0050 | CL2 asph base 1.00D PG64-22 | TON A A | 31 | $630.80 | $700.00 | $664.00 | $630.80 | $730.00 |
| 0060 | CL2 asph surf 0.38D PG64-22 | TON A A | 11 | $653.25 | $700.00 | $688.00 | $653.25 | $760.00 |
| 0070 | Asphalt material for tack | TON A A | 0.07 | $4,500.00 | $4,500.00 | $4,735.00 | $4,500.00 | $5,200.00 |
| 0080 | Culvert pipe-18 in | LF A A | 22 | $175.00 | $200.00 | $110.00 | $200.00 | $180.00 |
| 0090 | Culvert pipe-54 in | LF A A | 37 | $430.00 | $545.00 | $620.00 | $500.00 | $700.00 |
| 0100 | Remove pipe | LF A A | 10 | $100.00 | $90.00 | $205.00 | $1,000.00 | $240.00 |
| 0110 | Metal end section TY 1-18 in | EACH A A | 1 | $3,500.00 | $4,000.00 | $3,890.00 | $3,000.00 | $1,500.00 |
| 0120 | Delineator for guardrail BI directional white | EACH A A | 22 | $13.36 | $13.36 | $8.70 | $13.36 | $15.00 |
| 0130 | Barricade-type III | EACH A A | 2 | $300.00 | $160.00 | $150.00 | $200.00 | $160.00 |
| 0140 | Embankment in place | CUYD A A | 72 | $65.00 | $150.00 | $75.00 | $100.00 | $110.00 |
| 0150 | Guardrail terminal section no 1 | EACH A A | 5 | $76.81 | $76.81 | $76.00 | $76.81 | $84.00 |
| 0160 | Guardrail end treatment type 7 | EACH A A | 2 | $1,903.20 | $1,903.20 | $1,680.00 | $1,903.20 | $2,100.00 |
| 0170 | Guardrail end treatment type 3 | EACH A A | 1 | $1,388.61 | $1,388.21 | $1,925.00 | $1,388.61 | $1,500.00 |
| 0180 | Temp guardrail | LF A A | 525 | $19.07 | $19.07 | $27.00 | $19.07 | $21.00 |
| 0190 | Right-of-way monument type 1 | EACH A A | 10 | $158.13 | $158.13 | $158.00 | $158.13 | $170.00 |
| 0200 | Witness post | EACH A A | 3 | $141.84 | $141.84 | $125.00 | $141.84 | $150.00 |
| 0210 | Channel lining class II | TON A A | 10 | $175.00 | $150.00 | $69.00 | $100.00 | $100.00 |
| 0220 | Clearing and grubbing | LS A A | 1 | $10,000 | $63,000 | $10,575 | $58,816 | $50,000 |
| 0230 | Temporary signs | SQFT A A | 100 | $24.00 | $15.00 | $15.60 | $17.00 | $15.00 |
| 0240 | Edge key | LF A A | 22 | $87.50 | $87.50 | $92.00 | $87.50 | $100.00 |
| 0250 | Fabric-geotextile class 1 | SQYD A A | 21 | $4.50 | $10.00 | $6.80 | $5.00 | $10.00 |
| 0260 | Fabric-geotextile class 2 for pipe | SQYD A A | 174 | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 |
| 0270 | Maintain & control traffic | LS A A | 1 | $5,000.00 | $15,000 | $118,150 | $10,000 | $39,000 |
| 0280 | Diversions (by-pass detours) | LS A A | 1 | $10,000 | $125,000 | $130,715 | $130,000 | $125,000 |
| 0290 | Staking | LS A A | 1 | $10,000 | $11,000 | $7,330.00 | $15,000 | $40,000 |
| 0300 | Remove structure | LS A A | 1 | $20,000 | $22,000 | $29,360 | $25,000 | $33,000 |
| 0310 | Temporary bridge | EACH A A | 1 | $60,000 | $75,000 | $153,000 | $200,000 | $140,000 |
| 0320 | Erosion control | LS A A | 1 | $4,500.00 | $11,000 | $8,080.00 | $7,500.00 | $22,000 |
| 0330 | G/R steel W beam-S face (7 FT post) | LF A A | 150 | $31.55 | $31.55 | $34.00 | $31.55 | $34.00 |
| 0340 | Mobilization for concrete surf treatment | LS A A | 1 | $2,000.00 | $1,500.00 | $1,375.00 | $1,000.00 | $10,000 |
| 0350 | Structure granular backfill | CUYD A A | 113.40 | $75.00 | $105.00 | $175.00 | $90.00 | $160.00 |
| 0360 | Armored edge for concrete | LF A A | 24 | $120.00 | $135.00 | $110.00 | $150.00 | $390.00 |
| 0370 | Foundation preparation | LS A A | 1 | $41,000 | $25,000 | $19,050 | $50,000 | $85,000 |
| 0380 | Cyclopean stone rip rap | TON A A | 281 | $75.00 | $75.00 | $80.00 | $70.00 | $74.00 |
| 0390 | Test piles | LF A A | 88 | $250.00 | $120.00 | $139.00 | $145.00 | $100.00 |
| 0400 | Pre-drilling for piles | LF A A | 182 | $450.00 | $425.00 | $270.00 | $295.00 | $320.00 |
| 0410 | Piles-steel HP12X53 | LF A A | 233 | $150.00 | $125.00 | $144.00 | $135.00 | $140.00 |
| 0420 | Pile points-12 in | EACH A A | 8 | $120.00 | $130.00 | $150.00 | $200.00 | $350.00 |
| 0430 | Concrete-class A | CUYD A A | 30.80 | $1,500.00 | $1,500.00 | $1,495.00 | $1,415.00 | $1,300.00 |
| 0440 | Concrete-class AA | CUYD A A | 24.10 | $1,500.00 | $2,500.00 | $2,820.00 | $3,450.00 | $2,700.00 |
| 0450 | Steel reinforcement-epoxy coated | LB A A | 4,915 | $2.00 | $2.50 | $2.10 | $5.00 | $2.50 |
| 0460 | Precast PC box beam CB27-48 | LF A A | 201 | $445.00 | $555.00 | $560.00 | $615.00 | $660.00 |
| 0470 | Concrete sealing | SQFT A A | 1,767 | $2.50 | $4.00 | $3.50 | $3.00 | $15.00 |
| 0480 | Deep beam bridge guardrail | LF A A | 134 | $310.00 | $240.22 | $236.00 | $240.22 | $300.00 |
| 0490 | Demobilization | LS A A | 1 | $12,000 | $14,439 | $15,450 | $16,146 | $20,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of February 19, 2026. Compiled by Mirage Metrics.