KYTC contract 26-1501 bid tabulation

GRADE & DRAIN WITH ASPHALT SURFACE TAYLOR RD. (KY 3504). Let by Kentucky Transportation Cabinet on January 29, 2026. 2 bids received; low bid $410,022 by Frederick & May Construction Co, +6.0% against the engineer's estimate of $386,956.

Owner
Kentucky Transportation Cabinet
Letting
29 JAN 2026
Pay items
49
Data through
22 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Frederick & May Construction Co$410,022Low+6.0%
2Keetech Constr Horizontal Directional Drilling & Utilities$422,558+3.0%+9.0%
KYTC contract 26-1501: bids by rank

Engineer's estimate: $386,956.

Bid tabulation

LinePay itemUnitQuantity1. Frederick & May Construction Co2. Keetech Constr Horizontal Directional Drilling & Utilities
0010Crushed stone baseTON A A126$86.50$72.00
0020Traffic bound baseTON A A29$45.00$74.00
0030CL2 asph base 1.00D PG64-22TON A A181$225.50$490.00
0040CL2 asph surf 0.38D PG64-22TON A A124$233.50$490.00
0050Asphalt pave milling & texturingTON A A118$100.00$220.00
0060Longitudinal edge keyLF A A230$28.75$25.00
0070Asphalt material for tack non-trackingTON A A0.49$500.00$475.00
0080Remove pipeLF A A62$30.00$28.00
0090Lip header curbLF A A127$100.00$65.00
0100Barricade-type IIIEACH A A2$125.00$200.00
0110Roadway excavationCUYD A A282$50.00$40.00
0120Right-of-way monument type 1EACH A A5$389.34$200.00
0130Witness postEACH A A3$336.37$200.00
0140Channel lining class IITON A A92$60.00$82.00
0150Clearing and grubbingLS A A1$49,060$10,000
0160Temporary signsSQFT A A88$25.00$25.00
0170Maintain & control trafficLS A A1$20,000$15,000
0180Mobilization for mill & textLS A A1$5,000.00$7,500.00
0190StakingLS A A1$7,500.00$14,000
0200Erosion control blanketSQYD A A150$7.00$3.50
0210Pave striping-temp paint-4 inLF A A2,670$1.50$1.80
0220Pave striping-perm paint-4 inLF A A1,335$1.75$2.00
0230Pave marking-thermo stop bar-24INLF A A38$15.00$18.00
0240Pave marking-thermo cross-hatchSQFT A A1,471$1.45$5.00
0245Joint adhesiveLF A A200$22.00$30.00
0250Erosion controlLS A A1$6,500.00$6,500.00
0260Pavement marking-thermo lettersEACH A A4$100.00$280.00
0270Cored hole drainage conn to headwallEACH A A1$1,500.00$1,800.00
0280Barcode sign inventoryEACH A A2$78.09$40.00
0290Entrance pipe-15 inLF A A18$70.00$64.00
0300Culvert pipe-12 inLF A A12$100.00$58.00
0310Culvert pipe-24 in equivLF A A115$200.00$160.00
0320Metal end section TY 1-15 inEACH A A2$2,500.00$1,200.00
0330S & F box inlet-outlet-24 inEACH A A1$5,000.00$7,500.00
0340Junction box-specialEACH A A1$2,500.00$8,500.00
0350Safety box inlet-24 in DBL SDB-5EACH A A1$7,500.00$9,000.00
0360Fabric-geotextile class 2 for pipeSQYD A A128$2.00$2.00
0370Concrete-class ACUYD A A2$1,500.00$620.00
0380Temporary pipeLF A A80$60.00$50.00
0390Frame and lid TY 2EACH A A1$1,000.00$2,200.00
0400Trench drainLF A A50$650.00$38.00
0410SBM alum sheet signs .080 inSQFT A A12.50$99.22$45.00
0420Steel post type 1LF A A20$78.94$60.00
0430W fire hydrant removeEACH A A1$2,000.00$12,800
0440W pipe PVC 03 inchLF A A250$170.00$65.00
0450W tie-in 03 inchEACH A A3$6,000.00$3,000.00
0460W valve 03 inchEACH A A3$2,200.00$3,200.00
0470W line markerEACH A A2$100.00$118.00
0480DemobilizationLS A A1$6,060.00$12,000
KYTC contract 26-1501: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.

Every contract let that day: KYTC letting of January 29, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy