KYTC contract 25-5383 bid tabulation
BRIDGE REPLACEMENT KY 539. Let by Kentucky Transportation Cabinet on July 24, 2025. 4 bids received; low bid $1,554,094 by Frederick & May Construction Co, -22% against the engineer's estimate of $1,996,478.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 24 JUL 2025
- Pay items
- 61
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Frederick & May Construction Co | $1,554,094 | Low | -22% |
| 2 | Walker Construction & Materials LLC | $1,723,346 | +11% | -14% |
| 3 | Bush & Burchett Inc | $2,225,616 | +43% | +11% |
| 4 | Hinkle Construction Services LLC | $2,281,769 | +47% | +14% |
Engineer's estimate: $1,996,478.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Frederick & May Construction Co | 2. Walker Construction & Materials LLC | 3. Bush & Burchett Inc | 4. Hinkle Construction Services LLC |
|---|---|---|---|---|---|---|---|
| 0010 | Dga base | TON A A | 646 | $48.00 | $55.00 | $71.00 | $55.00 |
| 0020 | Leveling & wedging PG64-22 | TON A A | 3 | $288.00 | $444.00 | $288.00 | $300.00 |
| 0030 | CL2 asph base 1.00D PG64-22 | TON A A | 496 | $142.50 | $155.00 | $142.50 | $150.00 |
| 0040 | CL2 asph surf 0.38D PG64-22 | TON A A | 57 | $288.00 | $300.00 | $288.00 | $305.00 |
| 0050 | Delineator for guardrail BI directional white | EACH A A | 7 | $13.00 | $13.00 | $13.00 | $13.75 |
| 0060 | Barricade-type III | EACH A A | 2 | $150.00 | $175.00 | $200.00 | $161.00 |
| 0070 | Remove pavement | SQYD A A | 578 | $10.00 | $10.00 | $45.00 | $16.40 |
| 0080 | Roadway excavation | CUYD A A | 184 | $50.00 | $65.00 | $34.00 | $36.00 |
| 0090 | Guardrail terminal section no 1 | EACH A A | 2 | $85.00 | $85.00 | $85.00 | $90.00 |
| 0100 | Guardrail end treatment type 7 | EACH A A | 3 | $1,700.00 | $1,700.00 | $1,700.00 | $1,800.00 |
| 0110 | Remove guardrail | LF A A | 50 | $4.00 | $24.00 | $4.00 | $26.00 |
| 0120 | Temp guardrail | LF A A | 350 | $16.00 | $16.00 | $16.00 | $16.50 |
| 0130 | Clearing and grubbing | LS A A | 1 | $77,385 | $55,000 | $30,000 | $137,570 |
| 0140 | Temporary signs | SQFT A A | 112 | $15.00 | $15.00 | $15.00 | $15.70 |
| 0150 | Edge key | LF A A | 39 | $20.00 | $100.00 | $20.00 | $21.15 |
| 0160 | Maintain & control traffic | LS A A | 1 | $19,275 | $25,000 | $185,000 | $8,380.00 |
| 0170 | Diversions (by-pass detours) | LS A A | 1 | $92,000 | $100,000 | $128,581 | $424,765 |
| 0180 | Portable changeable message sign | EACH A A | 3 | $4,000.00 | $3,800.00 | $4,500.00 | $4,515.00 |
| 0190 | Staking | LS A A | 1 | $10,000 | $10,000 | $15,000 | $9,355.00 |
| 0200 | Remove structure | LS A A | 1 | $75,000 | $100,000 | $10,000 | $72,950 |
| 0210 | Pave striping-temp paint-6 in | LF A A | 850 | $0.50 | $0.50 | $0.50 | $0.55 |
| 0220 | Pave striping-thermo-6 in W | LF A A | 508 | $4.50 | $4.50 | $4.50 | $4.75 |
| 0230 | Pave striping-thermo-6 in Y | LF A A | 508 | $4.50 | $4.50 | $4.50 | $4.75 |
| 0240 | Pave striping-dur TY 1-4 in W | LF A A | 293 | $7.00 | $7.00 | $7.00 | $7.40 |
| 0250 | Pave striping-dur TY 1-4 in Y | LF A A | 293 | $7.00 | $7.00 | $7.00 | $7.40 |
| 0260 | Foundation preparation | LS A A | 1 | $80,000 | $100,000 | $300,000 | $58,240 |
| 0270 | Object marker TY 3 | EACH A A | 4 | $250.00 | $300.00 | $250.00 | $380.00 |
| 0280 | Erosion control | LS A A | 1 | $15,000 | $16,500 | $18,000 | $9,830.00 |
| 0290 | G/R steel W beam-S face (7 FT post) | LF A A | 250 | $29.00 | $29.00 | $29.00 | $30.00 |
| 0300 | Asphalt material for tack non-tracking | TON A A | 0.48 | $750.00 | $750.00 | $750.00 | $380.00 |
| 0310 | Electronic delivery MGMT system - agg | LS A A | 1 | $50.00 | $500.00 | $50.00 | $5,600.00 |
| 0320 | Structure granular backfill | CUYD A A | 276 | $62.00 | $80.00 | $100.00 | $226.00 |
| 0330 | Armored edge for concrete | LF A A | 48 | $150.00 | $125.00 | $125.00 | $70.00 |
| 0340 | Structure excav-solid rock | CUYD A A | 96 | $100.00 | $150.00 | $100.00 | $147.00 |
| 0350 | Cyclopean stone rip rap | TON A A | 120 | $70.00 | $90.00 | $75.00 | $117.00 |
| 0360 | Concrete-class A | CUYD A A | 209 | $1,000.00 | $1,150.00 | $1,500.00 | $1,465.00 |
| 0370 | Concrete-class AA | CUYD A A | 76 | $1,500.00 | $1,750.00 | $1,850.00 | $1,620.00 |
| 0380 | Steel reinforcement | LB A A | 22,000 | $1.63 | $1.65 | $2.00 | $1.95 |
| 0390 | Steel reinforcement-epoxy coated | LB A A | 9,500 | $1.73 | $1.85 | $2.00 | $2.05 |
| 0400 | Precast PC box beam CB33-48 | LF A A | 876 | $257.00 | $315.00 | $475.00 | $335.00 |
| 0410 | Concrete sealing | SQFT A A | 7,500 | $2.50 | $1.65 | $2.00 | $2.60 |
| 0420 | Rail system side mounted MGS | LF A A | 293 | $225.00 | $225.00 | $225.00 | $240.00 |
| 0430 | Mobilization for concrete surf treatment | LS A A | 1 | $500.00 | $750.00 | $2,000.00 | $1,419.24 |
| 0440 | W cap existing main | EACH A A | 3 | $2,000.00 | $2,000.00 | $2,500.00 | $1,935.00 |
| 0450 | W directional bore | LF A A | 360 | $300.00 | $300.00 | $180.00 | $457.00 |
| 0460 | W encasement steel bored range 2 | LF A A | 70 | $300.00 | $300.00 | $245.00 | $440.00 |
| 0470 | W encasement steel bored range 4 | LF A A | 70 | $400.00 | $400.00 | $284.00 | $440.00 |
| 0480 | W fire hydrant remove | EACH A A | 1 | $2,000.00 | $2,000.00 | $12,800 | $2,685.00 |
| 0490 | W flush hydrant assembly | EACH A A | 1 | $10,000 | $11,000 | $5,600.00 | $6,810.00 |
| 0500 | W flushing assembly | EACH A A | 1 | $5,000.00 | $5,000.00 | $3,898.00 | $4,830.00 |
| 0510 | W meter 3/4 inch | EACH A A | 2 | $2,000.00 | $2,000.00 | $2,750.00 | $1,990.00 |
| 0520 | W pipe PVC 04 inch | LF A A | 205 | $65.00 | $65.00 | $78.00 | $118.00 |
| 0530 | W pipe PVC 08 inch | LF A A | 245 | $80.00 | $80.00 | $88.00 | $150.00 |
| 0540 | W serv PE/PLST long side 3/4 in | EACH A A | 1 | $4,000.00 | $4,000.00 | $2,400.00 | $3,220.00 |
| 0550 | W serv PE/PLST short side 3/4 in | EACH A A | 1 | $2,000.00 | $2,000.00 | $2,200.00 | $970.00 |
| 0560 | W tapping sleeve and valve size 1 | EACH A A | 2 | $5,000.00 | $5,000.00 | $9,800.00 | $6,175.00 |
| 0570 | W tie-in 08 inch | EACH A A | 2 | $5,000.00 | $5,000.00 | $3,580.00 | $4,830.00 |
| 0580 | W valve 08 inch | EACH A A | 2 | $4,000.00 | $4,000.00 | $6,500.00 | $4,300.00 |
| 0590 | W line marker | EACH A A | 10 | $100.00 | $100.00 | $90.00 | $135.00 |
| 0600 | W leak detection meter | EACH A A | 2 | $2,500.00 | $2,500.00 | $3,200.00 | $5,670.00 |
| 0610 | Demobilization | LS A A | 1 | $22,967 | $26,944 | $33,000 | $33,800 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of July 24, 2025. Compiled by Mirage Metrics.