KYTC contract 25-1025 bid tabulation
GRADE & DRAIN WITH ASPHALT SURFACE KY-7. Let by Kentucky Transportation Cabinet on October 23, 2025. 3 bids received; low bid $5,051,335 by Frederick & May Construction Co, +5.8% against the engineer's estimate of $4,772,574.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 23 OCT 2025
- Pay items
- 153
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Frederick & May Construction Co | $5,051,335 | Low | +6.0% |
| 2 | Mountain Enterprises Inc | $5,311,692 | +5.0% | +11% |
| 3 | Walker Construction & Materials LLC | $6,430,000 | +27% | +35% |
Engineer's estimate: $4,772,574.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Frederick & May Construction Co | 2. Mountain Enterprises Inc | 3. Walker Construction & Materials LLC |
|---|---|---|---|---|---|---|
| 0010 | Crushed stone base | TON A A | 3,592 | $44.25 | $44.25 | $45.00 |
| 0020 | Traffic bound base | TON A A | 201 | $36.00 | $50.25 | $60.00 |
| 0030 | Crushed aggregate size no 2 | TON A A | 6,981 | $40.00 | $45.75 | $42.00 |
| 0040 | Asphalt seal aggregate | TON A A | 9 | $395.50 | $395.50 | $415.00 |
| 0050 | Asphalt seal coat | TON A A | 2 | $1,555.00 | $1,555.00 | $1,625.00 |
| 0060 | Leveling & wedging PG64-22 | TON A A | 1,684 | $187.55 | $187.55 | $195.00 |
| 0070 | CL2 asph base 1.00D PG64-22 | TON A A | 3,521 | $171.50 | $171.50 | $180.00 |
| 0080 | CL2 asph surf 0.38D PG64-22 | TON A A | 1,088 | $187.55 | $187.55 | $195.00 |
| 0090 | Cem conc ent pavement-8 in | SQYD A A | 943 | $140.00 | $112.50 | $200.00 |
| 0100 | Asphalt pave milling & texturing | TON A A | 767 | $50.60 | $50.60 | $55.00 |
| 0110 | Joint adhesive | LF A A | 5,576 | $1.00 | $1.00 | $1.00 |
| 0120 | Asphalt material for tack non-tracking | TON A A | 12 | $930.00 | $930.00 | $976.50 |
| 0125 | Longitudinal edge key | LF A A | 4,850 | $9.85 | $9.85 | $10.00 |
| 0130 | Perforated pipe-4 in | LF A A | 200 | $20.00 | $15.00 | $30.00 |
| 0140 | Cored hole drainage box con-4 in | EACH A A | 20 | $50.00 | $295.75 | $350.00 |
| 0150 | Standard curb and gutter | LF A A | 2,591 | $37.92 | $48.75 | $58.00 |
| 0160 | Standard curb and gutter mod | LF A A | 63 | $158.00 | $166.50 | $315.00 |
| 0170 | Standard header curb | LF A A | 692 | $42.00 | $39.25 | $82.00 |
| 0180 | Delineator for guardrail mono directional white | EACH A A | 6 | $15.37 | $15.37 | $15.75 |
| 0190 | Barricade-type III | EACH A A | 4 | $125.00 | $225.00 | $188.00 |
| 0200 | Temp ditch | LF A A | 1,200 | $1.00 | $1.50 | $1.50 |
| 0210 | Roadway excavation | CUYD A A | 8,073 | $25.00 | $20.65 | $50.00 |
| 0220 | Water | MGAL A A | 100 | $1.00 | $0.25 | $10.00 |
| 0230 | Guardrail-steel W beam-S face | LF A A | 587.50 | $33.31 | $33.31 | $34.00 |
| 0240 | Guardrail terminal section no 1 | EACH A A | 4 | $86.84 | $86.84 | $115.00 |
| 0250 | Guardrail end treatment type 2A | EACH A A | 2 | $1,899.86 | $1,899.86 | $2,205.00 |
| 0260 | Right-of-way monument type 1 | EACH A A | 20 | $180.00 | $433.17 | $315.00 |
| 0270 | Right-of-way monument type 1A | EACH A A | 12 | $180.00 | $433.17 | $315.00 |
| 0280 | Channel lining class III | TON A A | 556 | $50.00 | $64.00 | $75.00 |
| 0290 | Clearing and grubbing | LS A A | 1 | $25,000 | $29,000 | $110,000 |
| 0300 | Concrete-class B | CUYD A A | 35 | $800.00 | $900.00 | $1,000.00 |
| 0310 | Temporary signs | SQFT A A | 400 | $14.00 | $12.75 | $15.00 |
| 0320 | Edge key | LF A A | 166 | $48.75 | $48.75 | $50.00 |
| 0330 | Fabric-geotextile class 1 | SQYD A A | 9,606 | $2.75 | $2.30 | $3.00 |
| 0340 | Fabric-geotextile class 2 | SQYD A A | 25 | $4.00 | $4.05 | $25.00 |
| 0350 | Fabric-geotextile class 1A | SQYD A A | 14,156 | $3.50 | $3.70 | $4.00 |
| 0360 | Fabric-geotextile class 2 for pipe | SQYD A A | 7,351 | $2.00 | $2.00 | $2.00 |
| 0370 | Maintain & control traffic | LS A A | 1 | $50,000 | $140,000 | $175,000 |
| 0380 | Portable changeable message sign | EACH A A | 2 | $8,925.00 | $14,000 | $11,000 |
| 0390 | Mobilization for mill & text | LS A A | 1 | $6,500.00 | $6,500.00 | $6,825.00 |
| 0400 | Safeloading | CUYD A A | 34.40 | $1,500.00 | $550.00 | $375.00 |
| 0410 | Edgeline rumble strips | LF A A | 950 | $6.66 | $3.60 | $7.00 |
| 0420 | Temp silt fence | LF A A | 1,200 | $2.00 | $2.90 | $5.00 |
| 0430 | Silt trap type A | EACH A A | 7 | $100.00 | $481.25 | $400.00 |
| 0440 | Silt trap type B | EACH A A | 7 | $100.00 | $481.25 | $400.00 |
| 0450 | Silt trap type C | EACH A A | 7 | $100.00 | $600.00 | $400.00 |
| 0460 | Clean silt trap type A | EACH A A | 7 | $25.00 | $25.00 | $40.00 |
| 0470 | Clean silt trap type B | EACH A A | 7 | $25.00 | $25.00 | $40.00 |
| 0480 | Clean silt trap type C | EACH A A | 7 | $25.00 | $25.00 | $40.00 |
| 0490 | Clean temp silt fence | LF A A | 600 | $2.00 | $1.12 | $2.00 |
| 0500 | Sidewalk-4 in concrete | SQYD A A | 1,375 | $64.50 | $60.50 | $135.00 |
| 0510 | Staking | LS A A | 1 | $25,000 | $56,590 | $45,000 |
| 0520 | Arrow panel | EACH A A | 2 | $3,025.00 | $9,300.00 | $3,500.00 |
| 0530 | Relocate crash cushion | EACH A A | 2 | $3,451.16 | $3,451.16 | $3,150.00 |
| 0540 | Conc barrier wall type 9T | LF A A | 250 | $90.00 | $107.50 | $95.00 |
| 0550 | Erosion control blanket | SQYD A A | 847 | $2.87 | $2.87 | $9.98 |
| 0560 | Temp mulch | SQYD A A | 21,703 | $0.40 | $0.40 | $0.42 |
| 0570 | Temp seeding and protection | SQYD A A | 16,278 | $0.43 | $0.43 | $0.47 |
| 0580 | Initial fertilizer | TON A A | 1.70 | $1,383.47 | $1,383.47 | $1,995.00 |
| 0590 | Maintenance fertilizer | TON A A | 1.10 | $1,383.47 | $1,383.47 | $1,995.00 |
| 0600 | Seeding and protection | SQYD A A | 32,555 | $0.75 | $0.75 | $0.92 |
| 0610 | Sodding | SQYD A A | 1,649 | $11.46 | $11.46 | $16.80 |
| 0620 | Agricultural limestone | TON A A | 20.20 | $95.27 | $95.27 | $183.75 |
| 0630 | Pave striping-temp paint-4 in | LF A A | 21,600 | $0.18 | $0.18 | $0.26 |
| 0640 | Pave striping-thermo-6 in W | LF A A | 5,070 | $1.25 | $1.25 | $1.31 |
| 0650 | Pave striping-thermo-6 in Y | LF A A | 6,330 | $1.25 | $1.25 | $1.31 |
| 0660 | Pave striping-thermo-12 in Y | LF A A | 120 | $6.50 | $6.50 | $6.83 |
| 0670 | Pave marking-thermo curv arrow | EACH A A | 8 | $120.00 | $120.00 | $126.00 |
| 0680 | Crash cushion TY 6 class T TL2 | EACH A A | 2 | $5,520.64 | $5,520.64 | $6,300.00 |
| 0690 | Fuel adjustment | DOLL A A | 12,494 | $1.00 | $1.00 | $1.00 |
| 0700 | Asphalt adjustment | DOLL A A | 26,855 | $1.00 | $1.00 | $1.00 |
| 0710 | Saw cut | LF A A | 692 | $5.00 | $3.25 | $5.00 |
| 0720 | High slump 3000 psi grout | CUYD A A | 106 | $700.00 | $568.00 | $500.00 |
| 0730 | Detectable warnings | SQFT A A | 340 | $40.00 | $56.75 | $55.00 |
| 0740 | Decorative fence | LF A A | 455 | $180.00 | $242.82 | $325.00 |
| 0750 | Reinstall handrail | LS A A | 1 | $3,500.00 | $10,500 | $3,000.00 |
| 0760 | Inlaid pavement marker | EACH A A | 112 | $42.00 | $42.00 | $44.10 |
| 0770 | Pipeline inspection | LF A A | 1,536 | $2.35 | $2.35 | $3.15 |
| 0780 | Pave mount infrared temp equipment | SF A A | 252,315 | $0.05 | $0.05 | $0.05 |
| 0800 | Electronic delivery MGMT system - agg | LS A A | 1 | $3,000.00 | $2,500.00 | $2,625.00 |
| 0810 | Storm sewer pipe-15 in | LF A A | 945 | $140.00 | $100.00 | $175.00 |
| 0820 | Storm sewer pipe-18 in | LF A A | 160 | $195.00 | $106.00 | $325.00 |
| 0830 | Storm sewer pipe-24 in | LF A A | 34 | $300.00 | $170.00 | $395.00 |
| 0840 | Storm sewer pipe-30 in | LF A A | 517 | $180.00 | $186.00 | $315.00 |
| 0850 | Storm sewer pipe-36 in | LF A A | 65 | $230.00 | $200.00 | $450.00 |
| 0860 | Pipe culvert headwall-15 in | EACH A A | 1 | $1,500.00 | $3,651.44 | $3,000.00 |
| 0870 | Pipe culvert headwall-18 in | EACH A A | 1 | $1,700.00 | $3,651.44 | $3,000.00 |
| 0880 | Pipe culvert headwall-30 in | EACH A A | 1 | $3,000.00 | $4,713.85 | $5,000.00 |
| 0890 | Curb box inlet type A | EACH A A | 15 | $6,800.00 | $6,700.00 | $8,500.00 |
| 0900 | Drop box inlet type 3 | EACH A A | 2 | $6,000.00 | $6,675.00 | $7,000.00 |
| 0910 | Drop box inlet type 7 | EACH A A | 1 | $6,000.00 | $10,880 | $8,500.00 |
| 0920 | Drop box inlet type 11 | EACH A A | 6 | $3,500.00 | $6,300.00 | $5,500.00 |
| 0930 | Drop box inlet type 13G | EACH A A | 3 | $5,000.00 | $7,635.00 | $6,000.00 |
| 0940 | Drop box inlet type 13S | EACH A A | 1 | $5,000.00 | $9,120.00 | $7,000.00 |
| 0950 | Cap drop box inlet | EACH A A | 1 | $2,500.00 | $2,405.00 | $1,750.00 |
| 0960 | Junction box | EACH A A | 1 | $2,000.00 | $4,200.00 | $4,500.00 |
| 0970 | Adjust inlet | EACH A A | 1 | $2,500.00 | $1,065.00 | $1,250.00 |
| 0980 | Manhole type B | EACH A A | 1 | $3,500.00 | $3,900.00 | $5,000.00 |
| 0990 | Adjust manhole | EACH A A | 1 | $2,000.00 | $1,500.00 | $1,500.00 |
| 1000 | Concrete-class A | CUYD A A | 1.59 | $1,000.00 | $2,725.00 | $1,500.00 |
| 1010 | Ditch excavation | CUYD A A | 404 | $25.00 | $17.00 | $55.00 |
| 1020 | Cored hole drainage box con- 18 in | EACH A A | 1 | $1,500.00 | $2,000.00 | $2,100.00 |
| 1030 | Cored hole drainage box con-15 in | EACH A A | 1 | $1,500.00 | $2,600.00 | $1,575.00 |
| 1040 | Bore and jack pipe-36 in | LF A A | 141 | $1,300.00 | $1,650.00 | $1,800.00 |
| 1050 | Standard header curb | LF A A | 40 | $300.00 | $300.00 | $315.00 |
| 1060 | Maintain & control traffic | LS A A | 1 | $40,000 | $70,000 | $42,000 |
| 1070 | S encasement steel bored range 3 | LF A A | 65 | $800.00 | $800.00 | $840.00 |
| 1080 | S encasement steel bored range 4 | LF A A | 60 | $1,000.00 | $1,000.00 | $1,050.00 |
| 1090 | S lateral cleanout | EACH A A | 1 | $3,100.00 | $3,100.00 | $3,255.00 |
| 1100 | S lateral long side 06 inch | EACH A A | 1 | $13,200 | $13,200 | $13,860 |
| 1110 | S lateral short side 04 inch | EACH A A | 1 | $4,300.00 | $4,300.00 | $4,515.00 |
| 1120 | S manhole | EACH A A | 2 | $8,200.00 | $8,200.00 | $8,610.00 |
| 1130 | S manhole abandon/remove | EACH A A | 1 | $3,300.00 | $3,300.00 | $3,465.00 |
| 1140 | S manhole casting standard | EACH A A | 1 | $660.00 | $660.00 | $693.00 |
| 1150 | S manhole casting watertight | EACH A A | 1 | $820.00 | $820.00 | $861.00 |
| 1160 | S manhole tap existing | EACH A A | 1 | $4,150.00 | $4,150.00 | $4,357.50 |
| 1170 | S pipe PVC 08 inch | LF A A | 383 | $344.00 | $344.00 | $361.20 |
| 1180 | S structure abandon | EACH A A | 1 | $2,260.00 | $2,260.00 | $2,373.00 |
| 1190 | S lateral locate | EACH A A | 2 | $3,000.00 | $3,000.00 | $3,150.00 |
| 1200 | S pipe PVC 6 inch | LF A A | 88 | $300.00 | $300.00 | $315.00 |
| 1210 | Pole base | EACH A A | 2 | $5,946.20 | $5,943.20 | $6,243.51 |
| 1220 | Cable-no. 14/5C | LF A A | 70 | $2.86 | $2.86 | $3.00 |
| 1230 | Install luminaire pole | EACH A A | 2 | $4,656.21 | $4,656.21 | $4,889.02 |
| 1240 | Install | EACH A A | 2 | $4,542.39 | $4,542.39 | $4,769.51 |
| 1250 | Remove signal equipment | EACH A A | 2 | $3,334.76 | $3,334.76 | $3,501.50 |
| 1260 | Pole base | EACH A A | 11 | $5,833.67 | $5,833.67 | $6,125.35 |
| 1270 | Fused connector kit | EACH A A | 22 | $369.37 | $369.37 | $387.84 |
| 1280 | Conduit-1 1/4 in | LF A A | 750 | $14.00 | $14.00 | $14.70 |
| 1290 | Conduit-2 in | LF A A | 125 | $20.00 | $20.00 | $21.00 |
| 1300 | Electrical junction box type B | EACH A A | 2 | $1,547.54 | $1,547.54 | $1,624.92 |
| 1310 | Trenching and backfilling | LF A A | 825 | $19.07 | $19.07 | $20.02 |
| 1320 | Wire-no. 12 | LF A A | 500 | $3.86 | $3.86 | $4.05 |
| 1330 | Wire-no. 8 | LF A A | 1,800 | $5.39 | $5.39 | $5.66 |
| 1340 | Remove lighting | LS A A | 1 | $7,977.36 | $7,977.36 | $8,376.23 |
| 1350 | Decorative luminaire | EACH A A | 11 | $2,157.70 | $2,157.70 | $2,265.59 |
| 1360 | Decorative light pole | EACH A A | 11 | $4,217.53 | $4,217.53 | $4,428.41 |
| 1370 | W cap existing main | EACH A A | 2 | $2,860.00 | $2,860.00 | $3,003.00 |
| 1380 | W directional bore | LF A A | 560 | $240.00 | $240.00 | $252.00 |
| 1390 | W encasement steel bored range 3 | LF A A | 142 | $431.00 | $431.00 | $452.55 |
| 1400 | W fire hydrant remove | EACH A A | 2 | $1,100.00 | $1,100.00 | $1,155.00 |
| 1410 | W flush hydrant assembly | EACH A A | 2 | $10,670 | $10,670 | $11,204 |
| 1420 | W flushing assembly | EACH A A | 1 | $4,950.00 | $4,950.00 | $5,197.50 |
| 1430 | W meter 3/4 inch | EACH A A | 12 | $2,050.00 | $2,050.00 | $2,152.50 |
| 1440 | W pipe PVC 06 inch | LF A A | 1,900 | $123.00 | $123.00 | $129.15 |
| 1450 | W serv PE/PLST long side 1 in | EACH A A | 2 | $2,690.00 | $2,690.00 | $2,824.50 |
| 1460 | W serv PE/PLST short side 1 in | EACH A A | 3 | $1,850.00 | $1,850.00 | $1,942.50 |
| 1470 | W serv PE/PLST short side 3/4 in | EACH A A | 11 | $1,560.00 | $1,560.00 | $1,638.00 |
| 1480 | W tapping sleeve and valve size 1 | EACH A A | 2 | $7,170.00 | $7,170.00 | $7,528.50 |
| 1490 | W valve 06 inch | EACH A A | 1 | $3,160.00 | $3,160.00 | $3,318.00 |
| 1500 | W encasement special | LF A A | 10 | $1,060.00 | $1,060.00 | $1,113.00 |
| 1510 | W meter vault size range 1 | EACH A A | 1 | $27,000 | $27,000 | $28,350 |
| 1520 | Mobilization | LS A A | 1 | $141,006 | $155,000 | $290,000 |
| 1530 | Demobilization | LS A A | 1 | $74,651 | $78,500 | $110,732 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of October 23, 2025. Compiled by Mirage Metrics.