KYTC contract 25-5337 bid tabulation
BRIDGE WITH GRADE, DRAIN & SURFACE GOLLIHUE ROAD (CR 1197). Let by Kentucky Transportation Cabinet on April 24, 2025, Carter, District 9. 3 bids received; low bid $1,088,889 by Walker Construction & Materials LLC, -27% against the engineer's estimate of $1,491,292.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 24 APR 2025
- Pay items
- 49
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Walker Construction & Materials LLC | $1,088,889 | Low | -27% |
| 2 | Bush & Burchett Inc | $1,310,235 | +20% | -12% |
| 3 | Frederick & May Construction Co | $1,413,461 | +30% | -5.0% |
Engineer's estimate: $1,491,292.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Walker Construction & Materials LLC | 2. Bush & Burchett Inc | 3. Frederick & May Construction Co |
|---|---|---|---|---|---|---|
| 0010 | Dga base | TON A | 667 | $45.00 | $48.25 | $48.25 |
| 0020 | Traffic bound base | TON A | 88 | $48.00 | $50.00 | $32.00 |
| 0030 | Asphalt seal aggregate | TON A | 8 | $460.00 | $410.00 | $410.00 |
| 0040 | Asphalt seal coat | TON A | 1 | $1,800.00 | $1,500.00 | $1,500.00 |
| 0050 | CL2 asph base 1.00D PG64-22 | TON A | 427 | $140.00 | $229.25 | $229.25 |
| 0060 | CL2 asph surf 0.38D PG64-22 | TON A | 69 | $250.00 | $247.50 | $247.50 |
| 0070 | Asphalt material for tack | TON A | 1 | $10.00 | $10.00 | $10.00 |
| 0080 | Delineator for guardrail BI directional white | EACH A | 25 | $17.00 | $15.78 | $15.78 |
| 0090 | Roadway excavation | CUYD A | 464 | $10.00 | $50.00 | $30.00 |
| 0100 | Granular embankment | CUYD A | 533 | $58.00 | $70.00 | $60.00 |
| 0110 | Remove & replace fence | LF A | 209 | $9.15 | $30.87 | $30.87 |
| 0120 | Guardrail terminal section no 1 | EACH A | 3 | $110.00 | $81.58 | $81.58 |
| 0130 | Guardrail end treatment type 1 | EACH A | 1 | $3,500.00 | $3,863.84 | $3,863.84 |
| 0140 | Guardrail end treatment type 7 | EACH A | 1 | $2,200.00 | $2,065.42 | $2,065.42 |
| 0150 | Remove guardrail | LF A | 476 | $5.00 | $4.38 | $4.38 |
| 0160 | Clearing and grubbing | LS A | 1 | $79,613 | $45,000 | $63,993 |
| 0170 | Edge key | LF A | 13 | $35.00 | $75.20 | $75.20 |
| 0180 | Maintain & control traffic | LS A | 1 | $15,000 | $65,000 | $45,000 |
| 0190 | Diversions (by-pass detours) | LS A | 1 | $10,000 | $15,000 | $10,000 |
| 0200 | Portable changeable message sign | EACH A | 2 | $1,500.00 | $4,000.00 | $5,600.00 |
| 0210 | Edgeline rumble strips | LF A | 540 | $5.50 | $5.50 | $5.50 |
| 0220 | Staking | LS A | 1 | $5,500.00 | $15,000 | $5,000.00 |
| 0230 | Seeding and protection | SQYD A | 1,187 | $4.25 | $2.88 | $2.88 |
| 0240 | SBM alum sheet signs .080 in | SQFT A | 44.25 | $40.00 | $58.14 | $58.14 |
| 0250 | Steel post type 2 | LF A | 102 | $39.00 | $32.66 | $32.66 |
| 0260 | Pave marking-thermo stop bar-24IN | LF A | 18 | $15.00 | $15.00 | $15.00 |
| 0270 | Longitudinal edge key | LF A | 600 | $9.00 | $15.25 | $15.25 |
| 0280 | Erosion control | LS A | 1 | $1,500.00 | $10,000 | $5,000.00 |
| 0290 | G/R steel W beam-S face (7 FT post) | LF A | 737.50 | $32.25 | $36.62 | $36.62 |
| 0300 | Durable waterborne marking-6 in W | LF A | 540 | $3.40 | $3.00 | $3.00 |
| 0310 | Durable waterborne marking-6 in Y | LF A | 300 | $3.40 | $3.00 | $3.00 |
| 0320 | Barcode sign inventory | EACH A | 7 | $35.00 | $46.06 | $46.06 |
| 0330 | Structure granular backfill | CUYD A | 165 | $60.00 | $85.00 | $58.00 |
| 0340 | Remove structure | LS A | 1 | $20,000 | $25,000 | $30,000 |
| 0350 | Armored edge for concrete | LF A | 45 | $115.00 | $100.00 | $130.00 |
| 0360 | Foundation preparation | LS A | 1 | $30,000 | $75,000 | $105,000 |
| 0370 | Cyclopean stone rip rap | TON A | 564 | $50.00 | $50.00 | $42.00 |
| 0380 | Test piles | LF A | 35 | $115.00 | $300.00 | $195.00 |
| 0390 | Pre-drilling for piles | LF A | 60 | $515.00 | $400.00 | $1,040.00 |
| 0400 | Piles-steel HP12X53 | LF A | 137 | $120.00 | $125.00 | $185.00 |
| 0410 | Pile points-12 in | EACH A | 12 | $50.00 | $100.00 | $200.00 |
| 0420 | Concrete-class A | CUYD A | 41 | $1,200.00 | $1,100.00 | $1,215.00 |
| 0430 | Concrete-class AA | CUYD A | 129 | $1,500.00 | $1,500.00 | $1,300.00 |
| 0440 | Steel reinforcement-epoxy coated | LB A | 24,088 | $1.80 | $2.50 | $1.95 |
| 0450 | Concrete sealing | SQFT A | 6,068 | $1.50 | $2.00 | $3.00 |
| 0460 | PPC I-beam HN 48-49 | LF A | 333 | $750.00 | $825.00 | $1,100.00 |
| 0470 | Rail system side mounted MGS | LF A | 229 | $248.00 | $268.60 | $268.60 |
| 0480 | Mobilization for concrete surf treatment | LS A | 1 | $1,000.00 | $1,000.00 | $2,500.00 |
| 0490 | Demobilization | LS A | 1 | $16,500 | $20,000 | $20,889 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of April 24, 2025. Compiled by Mirage Metrics.