KYTC contract 25-1118 bid tabulation
BRIDGE WITH GRADE, DRAIN & SURFACE NEW CONNECTION FROM THOMPSON ROAD TO US 23 @ STONECOAL. Let by Kentucky Transportation Cabinet on September 25, 2025. 3 bids received; low bid $10,213,906 by Bush & Burchett Inc, -2.8% against the engineer's estimate of $10,509,923.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 25 SEP 2025
- Pay items
- 130
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Bush & Burchett Inc | $10,213,906 | Low | -3.0% |
| 2 | Haydon Bridge Company Inc | $10,987,754 | +8.0% | +5.0% |
| 3 | Triton Construction Inc | $12,995,000 | +27% | +24% |
Engineer's estimate: $10,509,923.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Bush & Burchett Inc | 2. Haydon Bridge Company Inc | 3. Triton Construction Inc |
|---|---|---|---|---|---|---|
| 0010 | Crushed stone base | TON A A | 7,771 | $43.75 | $43.75 | $46.00 |
| 0020 | Geogrid reinforcement for subgrade | SQYD A A | 10,309 | $2.60 | $2.60 | $3.00 |
| 0030 | Asphalt seal aggregate | TON A A | 21 | $275.00 | $275.00 | $300.00 |
| 0040 | Asphalt seal coat | TON A A | 2.50 | $1,700.00 | $1,700.00 | $1,800.00 |
| 0050 | CL3 asph base 1.00D PG64-22 | TON A A | 3,110 | $189.60 | $189.60 | $199.00 |
| 0060 | CL2 asph base 0.75D PG64-22 | TON A A | 85 | $264.85 | $230.58 | $280.00 |
| 0070 | CL2 asph surf 0.38D PG64-22 | TON A A | 42 | $241.50 | $212.75 | $260.00 |
| 0080 | Asphalt material for tack | TON A A | 7.50 | $10.00 | $9.87 | $11.00 |
| 0090 | CL3 asph surf 0.38B PG64-22 | TON A A | 714 | $241.50 | $241.50 | $250.00 |
| 0100 | Cem conc ent pavement-8 in | SQYD A A | 57 | $200.00 | $195.00 | $250.00 |
| 0110 | Fabric-geotextile class 1 | SQYD A A | 10,309 | $2.00 | $2.00 | $2.00 |
| 0120 | Remove pipe | LF A A | 640 | $20.00 | $20.00 | $40.00 |
| 0130 | Remove drop box inlet | EACH A A | 1 | $400.00 | $400.00 | $900.00 |
| 0140 | Flume inlet type 2 | EACH A A | 4 | $6,000.00 | $7,950.00 | $9,000.00 |
| 0150 | Remove curb & gutter box inlet | EACH A A | 4 | $450.00 | $450.00 | $900.00 |
| 0160 | Standard curb and gutter | LF A A | 1,791 | $50.00 | $58.00 | $70.00 |
| 0170 | Standard header curb | LF A A | 260 | $65.00 | $45.00 | $95.00 |
| 0180 | Delineator for guardrail BI directional white | EACH A A | 16 | $14.87 | $14.87 | $16.00 |
| 0190 | Remove pavement | SQYD A A | 3,800 | $12.00 | $12.00 | $20.00 |
| 0200 | Temp ditch | LF A A | 860 | $2.00 | $2.00 | $2.00 |
| 0210 | Clean temp ditch | LF A A | 430 | $1.50 | $1.50 | $2.00 |
| 0220 | Remove structure | LS A A | 1 | $200,000 | $150,000 | $260,000 |
| 0230 | Embankment in place | CUYD A A | 22,234 | $13.00 | $13.00 | $45.00 |
| 0235 | Single vehicular chain link gate | EACH A A | 1 | $7,685.21 | $7,685.21 | $7,700.00 |
| 0240 | Guardrail-steel W beam-S face | LF A A | 1,463 | $31.85 | $31.02 | $32.00 |
| 0250 | Guardrail terminal section no 1 | EACH A A | 3 | $87.06 | $29.02 | $88.00 |
| 0260 | Guardrail end treatment type 1 | EACH A A | 1 | $3,609.51 | $3,609.51 | $3,700.00 |
| 0270 | Remove guardrail | LF A A | 900 | $3.00 | $3.00 | $3.00 |
| 0280 | Channel lining class II | TON A A | 55 | $60.00 | $60.00 | $70.00 |
| 0290 | Channel lining class III | TON A A | 54 | $62.00 | $62.00 | $75.00 |
| 0300 | Clearing and grubbing | LS A A | 1 | $10,000 | $215,000 | $200,000 |
| 0305 | Edge key | LF A A | 241 | $44.15 | $44.15 | $45.00 |
| 0310 | Remove headwall | EACH A A | 1 | $1,200.00 | $1,200.00 | $900.00 |
| 0320 | Maintain & control traffic | LS A A | 1 | $20,000 | $40,000 | $350,000 |
| 0330 | Settlement platform | EACH A A | 1 | $4,500.00 | $4,500.00 | $2,500.00 |
| 0340 | Temp silt fence | LF A A | 860 | $4.00 | $4.00 | $6.00 |
| 0350 | Silt trap type A | EACH A A | 6 | $240.00 | $240.00 | $450.00 |
| 0360 | Silt trap type B | EACH A A | 6 | $240.00 | $245.00 | $350.00 |
| 0370 | Silt trap type C | EACH A A | 6 | $340.00 | $340.00 | $250.00 |
| 0380 | Clean silt trap type A | EACH A A | 6 | $50.00 | $232.00 | $250.00 |
| 0390 | Clean silt trap type B | EACH A A | 6 | $50.00 | $243.00 | $200.00 |
| 0400 | Clean silt trap type C | EACH A A | 6 | $50.00 | $289.00 | $250.00 |
| 0410 | Sidewalk-4 in concrete | SQYD A A | 461 | $70.00 | $125.00 | $150.00 |
| 0420 | Staking | LS A A | 1 | $30,000 | $35,000 | $35,000 |
| 0430 | Steel pipe-2 1/2 in | LF A A | 15.75 | $60.00 | $60.00 | $50.00 |
| 0440 | Steel pipe-4 in | LF A A | 15.75 | $95.00 | $95.00 | $65.00 |
| 0450 | Erosion control blanket | SQYD A A | 371 | $2.59 | $2.59 | $3.00 |
| 0460 | Temp mulch | SQYD A A | 19,152 | $0.35 | $0.35 | $0.40 |
| 0470 | Temp seeding and protection | SQYD A A | 14,509 | $0.37 | $0.37 | $0.40 |
| 0480 | Initial fertilizer | TON A A | 0.60 | $1,778.16 | $1,778.17 | $1,800.00 |
| 0490 | Maintenance fertilizer | TON A A | 0.40 | $1,778.16 | $1,778.15 | $1,800.00 |
| 0500 | Seeding and protection | SQYD A A | 11,656 | $0.64 | $0.62 | $0.65 |
| 0510 | Pave striping-perm paint-6 in | LF A A | 8,907 | $0.40 | $0.40 | $0.40 |
| 0520 | Pave striping-thermo-6 in W | LF A A | 2,262 | $2.00 | $2.00 | $2.00 |
| 0530 | Pave striping-thermo-6 in Y | LF A A | 452 | $2.00 | $2.00 | $2.00 |
| 0540 | Pave striping-thermo-12 in W | LF A A | 601 | $4.00 | $4.00 | $4.00 |
| 0550 | Pave marking-thermo stop bar-24IN | LF A A | 163 | $15.00 | $15.00 | $15.00 |
| 0560 | Pave marking-thermo cross-hatch | SQFT A A | 236 | $5.50 | $5.50 | $5.50 |
| 0570 | Pave marking-thermo curv arrow | EACH A A | 27 | $150.00 | $150.00 | $150.00 |
| 0580 | Pave marking-thermo comb arrow | EACH A A | 8 | $300.00 | $300.00 | $300.00 |
| 0590 | Fuel adjustment | DOLL A A | 6,125 | $1.00 | $1.00 | $1.00 |
| 0600 | Asphalt adjustment | DOLL A A | 15,384 | $1.00 | $1.00 | $1.00 |
| 0610 | Object marker TY 3 | EACH A A | 1 | $45.86 | $45.86 | $50.00 |
| 0620 | Remove & relocate signs | EACH A A | 14 | $427.31 | $427.31 | $450.00 |
| 0625 | Longitudinal edge key | LF A A | 330 | $34.10 | $34.10 | $35.00 |
| 0630 | Striping removal | LF A A | 2,000 | $2.00 | $2.00 | $2.00 |
| 0640 | Detectable warnings | SQFT A A | 36 | $50.00 | $45.00 | $16.00 |
| 0650 | Turf reinforcement mat 1 | SQYD A A | 177 | $9.44 | $9.44 | $10.00 |
| 0660 | Remove thermoplastic arrows | EACH A A | 4 | $150.00 | $150.00 | $150.00 |
| 0670 | R/W monument type 3 | EACH A A | 9 | $151.04 | $151.04 | $150.00 |
| 0680 | Pave mark thermo chevron | SQFT A A | 257 | $7.25 | $8.00 | $8.00 |
| 0690 | Vibrating wire piezometer | EACH A A | 1 | $4,500.00 | $1,500.00 | $5,000.00 |
| 0700 | Thrie beam guardrail transition TL-2 | EACH A A | 4 | $1,775.01 | $1,775.01 | $1,800.00 |
| 0710 | Electronic delivery MGMT system - agg | LS A A | 1 | $1,000.00 | $0.01 | $1,000.00 |
| 0720 | Storm sewer pipe-18 in | LF A A | 237 | $168.00 | $168.00 | $160.00 |
| 0730 | Storm sewer pipe-24 in | LF A A | 593 | $174.00 | $174.00 | $185.00 |
| 0740 | Pipe culvert headwall-24 in | EACH A A | 2 | $2,846.00 | $2,846.00 | $2,500.00 |
| 0750 | Curb box inlet type A | EACH A A | 4 | $6,422.00 | $6,422.00 | $10,000 |
| 0760 | Drop box inlet type 1 | EACH A A | 2 | $6,870.00 | $6,870.00 | $8,500.00 |
| 0770 | Drop box inlet type 11 | EACH A A | 1 | $6,521.00 | $6,521.00 | $4,500.00 |
| 0780 | Frame and lid TY 1 | EACH A A | 2 | $1,400.00 | $1,400.00 | $700.00 |
| 0790 | Drainage junction box TY B | EACH A A | 2 | $4,620.00 | $4,620.00 | $5,000.00 |
| 0800 | Structure granular backfill | CUYD A A | 912 | $90.00 | $85.00 | $120.00 |
| 0810 | Armored edge for concrete | LF A A | 360 | $85.00 | $95.00 | $108.00 |
| 0820 | Foundation preparation | LS A A | 1 | $350,000 | $325,000 | $520,000 |
| 0830 | Cyclopean stone rip rap | TON A A | 7,760 | $55.00 | $62.50 | $45.00 |
| 0840 | Test piles | LF A A | 338 | $200.00 | $350.00 | $130.00 |
| 0850 | Piles-steel HP14X89 | LF A A | 1,589 | $100.00 | $125.00 | $105.00 |
| 0860 | Pile points-12 in | EACH A A | 24 | $150.00 | $0.01 | $250.00 |
| 0870 | Concrete-class A | CUYD A A | 491.90 | $1,000.00 | $1,250.00 | $1,600.00 |
| 0880 | Concrete-class AA | CUYD A A | 847.50 | $1,250.00 | $995.00 | $1,200.00 |
| 0890 | Steel reinforcement | LB A A | 69,828 | $1.75 | $2.07 | $2.50 |
| 0900 | Steel reinforcement-epoxy coated | LB A A | 275,696 | $1.75 | $1.68 | $2.00 |
| 0910 | Approach slab | SQYD A A | 334 | $450.00 | $815.00 | $450.00 |
| 0920 | Rock soundings | LF A A | 334 | $50.00 | $105.00 | $70.00 |
| 0930 | Rock corings | LF A A | 260 | $85.00 | $195.00 | $100.00 |
| 0940 | CSL testing (6 tubes) | EACH A A | 8 | $4,000.00 | $1,500.00 | $7,500.00 |
| 0950 | Concrete sealing | SQFT A A | 48,424 | $2.00 | $1.50 | $2.00 |
| 0960 | Precast PC I beam-HN 72-49 | LF A A | 2,373 | $750.00 | $750.00 | $810.00 |
| 0970 | Drilled shaft-84 in-common | LF A A | 318 | $2,600.00 | $3,300.00 | $3,000.00 |
| 0980 | Drilled shaft-78 in-rock | LF A A | 104 | $2,600.00 | $3,500.00 | $5,000.00 |
| 0990 | Rail system single slope - 40 in | LF A A | 686 | $125.00 | $145.00 | $140.00 |
| 1000 | Mobilization for concrete surf treatment | LS A A | 1 | $1,000.00 | $500.00 | $1.00 |
| 1010 | Electrical junction box type B | EACH A A | 10 | $3,063.28 | $3,063.28 | $3,064.00 |
| 1020 | Trenching and backfilling | LF A A | 1,765 | $85.79 | $85.79 | $86.00 |
| 1030 | Cable-no. 14/5C | LF A A | 2,302 | $3.81 | $3.81 | $4.00 |
| 1040 | Cable-no. 14/7C | LF A A | 1,248 | $4.67 | $4.67 | $5.00 |
| 1050 | Messenger-10800 LB | LF A A | 773 | $17.15 | $17.15 | $18.00 |
| 1060 | Install steel strain pole | EACH A A | 8 | $7,500.00 | $7,500.00 | $7,500.00 |
| 1070 | Install LED signal-3 section | EACH A A | 11 | $529.36 | $529.36 | $530.00 |
| 1080 | Install LED signal- 4 section | EACH A A | 2 | $945.91 | $945.91 | $946.00 |
| 1090 | Traffic signal pole base | CUYD A A | 32.97 | $750.00 | $750.00 | $750.00 |
| 1100 | Install antenna | EACH A A | 1 | $3,780.62 | $3,780.62 | $3,781.00 |
| 1110 | Advance warning flasher | EACH A A | 2 | $17,759 | $17,759 | $17,760 |
| 1120 | PVC conduit-1 1/4 in-schedule 80 | LF A A | 1,765 | $17.10 | $17.10 | $18.00 |
| 1130 | PVC conduit-2 in-schedule 80 | LF A A | 20 | $24.24 | $24.24 | $25.00 |
| 1140 | Install signal controller-TY atc | EACH A A | 1 | $35,000 | $35,000 | $35,000 |
| 1150 | Remove signal equipment | EACH A A | 1 | $12,500 | $12,500 | $12,500 |
| 1160 | Install radar presence detector type A | EACH A A | 4 | $2,287.96 | $2,287.96 | $2,288.00 |
| 1170 | Pole 120 FT MTG HT high mast | EACH A A | 1 | $125,000 | $125,000 | $125,000 |
| 1180 | Lighting control equipment | EACH A A | 1 | $47,221 | $47,221 | $47,222 |
| 1190 | Trenching and backfilling | LF A A | 70 | $85.79 | $85.79 | $86.00 |
| 1200 | Wire-no. 12 | LF A A | 360 | $1.88 | $1.88 | $2.00 |
| 1210 | Pole 35 FT wooden | EACH A A | 1 | $2,264.44 | $2,264.44 | $2,265.00 |
| 1220 | Remove lighting | LS A A | 1 | $34,423 | $34,423 | $34,424 |
| 1230 | Pole base-high mast | CUYD A A | 8.70 | $750.00 | $750.00 | $750.00 |
| 1240 | High mast LED luminaire | EACH A A | 4 | $5,594.02 | $5,594.02 | $5,595.00 |
| 1250 | Cable-no. 10/3C ducted | LF A A | 70 | $12.91 | $12.91 | $13.00 |
| 1260 | Mobilization | LS A A | 1 | $450,000 | $514,000 | $609,000 |
| 1270 | Demobilization | LS A A | 1 | $145,000 | $155,804 | $184,300 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of September 25, 2025. Compiled by Mirage Metrics.