KYTC contract 25-5395 bid tabulation
BRIDGE REPLACEMENT KY 289. Let by Kentucky Transportation Cabinet on November 20, 2025. 3 bids received; low bid $3,549,706 by Haydon Bridge Company Inc, -5.5% against the engineer's estimate of $3,755,749.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 20 NOV 2025
- Pay items
- 67
- Data through
- 22 OCT 2026
2 of the 3 bids matched their published totals to within a dollar and are shown; the others are left out.
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Haydon Bridge Company Inc | $3,549,706 | Low | -5.0% |
| 2 | Jave LLC | $4,120,918 | +16% | +10% |
Engineer's estimate: $3,755,749.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Haydon Bridge Company Inc | 2. Jave LLC |
|---|---|---|---|---|---|
| 0010 | Dga base | TON A A | 2,434 | $41.00 | $39.90 |
| 0020 | Asphalt seal aggregate | TON A A | 16 | $215.77 | $226.56 |
| 0030 | Asphalt seal coat | TON A A | 2 | $2,079.35 | $2,183.30 |
| 0040 | CL2 asph base 1.00D PG64-22 | TON A A | 1,245 | $115.00 | $120.75 |
| 0050 | CL2 asph surf 0.38D PG64-22 | TON A A | 194 | $150.00 | $157.50 |
| 0060 | Asphalt material for tack | TON A A | 4 | $685.19 | $719.45 |
| 0070 | Entrance pipe-15 in | LF A A | 58 | $85.00 | $89.25 |
| 0080 | Entrance pipe-18 in | LF A A | 96 | $90.00 | $94.50 |
| 0090 | Remove pipe | LF A A | 102 | $15.00 | $15.75 |
| 0100 | Sloped box outlet type 1-18 in | EACH A A | 2 | $3,300.00 | $3,465.00 |
| 0110 | Delineator for guardrail BI directional white | EACH A A | 10 | $16.35 | $17.17 |
| 0120 | Barricade-type III | EACH A A | 8 | $225.00 | $105.00 |
| 0130 | Remove pavement | SQYD A A | 404 | $10.75 | $11.29 |
| 0140 | Roadway excavation | CUYD A A | 19,033 | $18.50 | $19.43 |
| 0150 | Granular embankment | CUYD A A | 4,331 | $57.00 | $59.85 |
| 0160 | Remove fence | LF A A | 284 | $9.21 | $9.67 |
| 0170 | Guardrail-steel W beam-S face | LF A A | 737.50 | $32.87 | $34.51 |
| 0180 | Guardrail terminal section no 1 | EACH A A | 3 | $82.12 | $86.23 |
| 0190 | Guardrail end treatment type 1 | EACH A A | 1 | $3,551.47 | $3,729.04 |
| 0200 | Remove guardrail | LF A A | 294 | $4.14 | $4.35 |
| 0210 | Right-of-way monument type 1 | EACH A A | 15 | $191.26 | $200.82 |
| 0220 | Witness post | EACH A A | 15 | $161.46 | $169.53 |
| 0230 | Channel lining class II | TON A A | 1,537 | $44.50 | $46.73 |
| 0240 | Clearing and grubbing | LS A A | 1 | $75,000 | $27,830 |
| 0250 | Temporary signs | SQFT A A | 216 | $14.00 | $5.25 |
| 0260 | Edge key | LF A A | 42 | $115.00 | $120.75 |
| 0270 | Fabric-geotextile class 1 | SQYD A A | 2,458 | $3.20 | $3.36 |
| 0280 | Fabric-geotextile class 2 | SQYD A A | 2,500 | $2.25 | $2.36 |
| 0290 | Maintain & control traffic | LS A A | 1 | $30,000 | $9,712.50 |
| 0300 | Portable changeable message sign | EACH A A | 2 | $1,250.00 | $6,232.80 |
| 0310 | Staking | LS A A | 1 | $15,000 | $26,070 |
| 0320 | Remove structure | LS A A | 1 | $95,000 | $62,363 |
| 0330 | Erosion control blanket | SQYD A A | 122 | $3.31 | $3.48 |
| 0340 | SBM alum sheet signs .125 in | SQFT A A | 38.50 | $53.40 | $56.07 |
| 0350 | Steel post type 1 | LF A A | 48 | $35.60 | $37.38 |
| 0360 | Pave striping-perm paint-6 in | LF A A | 3,036 | $0.85 | $0.89 |
| 0370 | Pave striping-dur TY 1-6 in W | LF A A | 486 | $13.00 | $13.65 |
| 0380 | Pave striping-dur TY 1-6 in Y | LF A A | 486 | $13.00 | $13.65 |
| 0390 | Remove sign | EACH A A | 2 | $47.62 | $50.00 |
| 0400 | Erosion control | LS A A | 1 | $10,000 | $18,375 |
| 0410 | Barcode sign inventory | EACH A A | 6 | $47.62 | $50.00 |
| 0420 | Thrie beam guardrail transition TL-3 | EACH A A | 4 | $3,170.68 | $3,329.21 |
| 0430 | Historic bronze plaque | EACH A A | 1 | $2,500.00 | $6,323.43 |
| 0440 | Install historic bronze plaque | EACH A A | 1 | $1,250.00 | $922.50 |
| 0450 | Structure granular backfill | CUYD A A | 184 | $75.00 | $137.26 |
| 0460 | Armored edge for concrete | LF A A | 48 | $125.00 | $120.54 |
| 0470 | Foundation preparation | LS A A | 1 | $165,000 | $161,192 |
| 0480 | Cyclopean stone rip rap | TON A A | 1,860 | $80.00 | $81.46 |
| 0490 | Test piles | LF A A | 55 | $350.00 | $270.60 |
| 0500 | Pre-drilling for piles | LF A A | 50 | $365.00 | $757.07 |
| 0510 | Piles-steel HP14X89 | LF A A | 216 | $150.00 | $246.00 |
| 0520 | Pile points-14 in | EACH A A | 12 | $260.00 | $324.72 |
| 0530 | Concrete-class A | CUYD A A | 155 | $1,350.00 | $2,031.96 |
| 0540 | Concrete-class AA | CUYD A A | 237 | $1,350.00 | $1,352.47 |
| 0550 | Steel reinforcement | LB A A | 18,503 | $2.82 | $2.55 |
| 0560 | Steel reinforcement-epoxy coated | LB A A | 58,795 | $2.07 | $2.36 |
| 0570 | Drilled shaft 54 in-solid rock | LF A A | 48 | $3,250.00 | $2,444.10 |
| 0580 | Drilled shaft 60 in-common | LF A A | 22 | $3,250.00 | $2,506.65 |
| 0590 | Rock soundings | LF A A | 20 | $150.00 | $104.55 |
| 0600 | Rock corings | LF A A | 104 | $165.00 | $190.65 |
| 0610 | Concrete sealing | SQFT A A | 18,650 | $1.87 | $2.45 |
| 0620 | Deck drain | EACH A A | 6 | $850.00 | $377.61 |
| 0630 | PPC I-beam type HN 42-49 | LF A A | 720 | $775.00 | $1,237.38 |
| 0640 | Rail system single slope - 40 in | LF A A | 486 | $160.00 | $372.27 |
| 0650 | Mobilization for concrete surf treatment | LS A A | 1 | $1,250.00 | $6,150.00 |
| 0660 | Mobilization | LS A A | 1 | $165,000 | $191,995 |
| 0670 | Demobilization | LS A A | 1 | $50,349 | $58,063 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of November 20, 2025. Compiled by Mirage Metrics.