KYTC contract 25-5390 bid tabulation
BRIDGE REPLACEMENT KY 210. Let by Kentucky Transportation Cabinet on September 25, 2025. 4 bids received; low bid $1,465,277 by Jave LLC, -10% against the engineer's estimate of $1,633,084.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 25 SEP 2025
- Pay items
- 49
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Jave LLC | $1,465,277 | Low | -10% |
| 2 | Hinkle Construction Services LLC | $1,659,996 | +13% | +2.0% |
| 3 | Scott and Murphy Inc | $1,711,959 | +17% | +5.0% |
| 4 | Cleary Construction Inc | $2,245,000 | +53% | +37% |
Engineer's estimate: $1,633,084.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Jave LLC | 2. Hinkle Construction Services LLC | 3. Scott and Murphy Inc | 4. Cleary Construction Inc |
|---|---|---|---|---|---|---|---|
| 0010 | Crushed stone base | TON A A | 37 | $137.47 | $70.00 | $140.00 | $200.00 |
| 0020 | CL3 asph base 1.00D PG64-22 | TON A A | 45 | $329.60 | $336.00 | $320.00 | $425.00 |
| 0030 | Asphalt material for tack | TON A A | 0.10 | $0.10 | $0.10 | $0.10 | $750.00 |
| 0040 | CL3 asph surf 0.38B PG64-22 | TON A A | 25 | $494.40 | $505.00 | $480.00 | $550.00 |
| 0050 | Mobilization for mill & text | LS A A | 1 | $7,725.00 | $7,895.00 | $7,500.00 | $3,500.00 |
| 0060 | Asphalt milling and texturing | SQYD A A | 289 | $7.36 | $7.50 | $7.15 | $50.00 |
| 0070 | Standard curb and gutter | LF A A | 14 | $203.88 | $305.00 | $210.00 | $365.00 |
| 0080 | Island curb and gutter | LF A A | 8 | $174.75 | $450.00 | $275.00 | $375.00 |
| 0090 | Delineator for barrier - yellow | EACH A A | 30 | $19.12 | $20.00 | $18.56 | $18.56 |
| 0100 | Delineator for guardrail BI directional white | EACH A A | 2 | $17.35 | $18.00 | $16.84 | $16.84 |
| 0110 | Barricade-type III | EACH A A | 2 | $103.00 | $160.00 | $365.00 | $150.00 |
| 0120 | Roadway excavation | CUYD A A | 20 | $128.75 | $120.00 | $200.00 | $1,500.00 |
| 0130 | Guardrail-steel W beam-S face | LF A A | 37.50 | $37.28 | $39.00 | $36.19 | $36.19 |
| 0140 | Guardrail terminal section no 1 | EACH A A | 1 | $101.90 | $106.00 | $98.93 | $98.93 |
| 0150 | Clearing and grubbing | LS A A | 1 | $23,067 | $20,800 | $11,500 | $18,000 |
| 0160 | Temporary signs | SQFT A A | 508.25 | $7.21 | $9.00 | $8.50 | $15.00 |
| 0170 | Object marker type 2 | EACH A A | 2 | $419.02 | $435.00 | $406.82 | $406.82 |
| 0180 | Maintain & control traffic | LS A A | 1 | $12,412 | $150,000 | $35,100 | $150,000 |
| 0190 | Lane closure | EACH A A | 1 | $1,545.00 | $6,500.00 | $10,200 | $2,000.00 |
| 0200 | Portable changeable message sign | EACH A A | 2 | $4,585.56 | $6,120.00 | $4,400.00 | $4,500.00 |
| 0210 | Staking | LS A A | 1 | $7,572.50 | $7,510.00 | $3,000.00 | $55,000 |
| 0220 | Conc barrier wall type 9T | LF A A | 900 | $74.56 | $76.00 | $125.00 | $60.00 |
| 0230 | Pave striping-temp paint-6 in | LF A A | 765 | $0.34 | $0.35 | $0.33 | $0.33 |
| 0240 | Pave striping-thermo-6 in W | LF A A | 30 | $1.39 | $1.40 | $1.35 | $1.35 |
| 0250 | Pave striping-thermo-6 in Y | LF A A | 120 | $1.39 | $1.40 | $1.35 | $1.35 |
| 0260 | Pave mark temp paint line arrow | EACH A A | 8 | $77.25 | $79.00 | $75.00 | $75.00 |
| 0270 | Temp crash cushion | EACH A A | 2 | $5,914.21 | $6,130.00 | $5,741.95 | $5,741.95 |
| 0280 | Remove-store and reinstall sign | EACH A A | 3 | $545.43 | $650.00 | $529.54 | $529.54 |
| 0290 | Erosion control | LS A A | 1 | $7,572.50 | $7,200.00 | $10,000 | $15,000 |
| 0300 | Pave stripe-wet ref tape-6 in Y | LF A A | 300 | $10.30 | $10.50 | $10.00 | $10.00 |
| 0310 | Pave stripe-wet ref tape-6 in W | LF A A | 40 | $10.30 | $10.50 | $10.00 | $10.00 |
| 0320 | Barcode sign inventory | EACH A A | 2 | $49.34 | $51.00 | $47.90 | $47.90 |
| 0330 | Thrie beam guardrail transition TL-3 | EACH A A | 2 | $3,161.29 | $3,280.00 | $3,900.00 | $3,069.21 |
| 0340 | Structure granular backfill | CUYD A A | 177 | $113.01 | $150.00 | $130.00 | $150.00 |
| 0350 | Armored edge for concrete | LF A A | 65 | $139.80 | $100.00 | $160.00 | $225.00 |
| 0360 | Foundation preparation | LS A A | 1 | $39,028 | $109,060 | $94,600 | $190,000 |
| 0370 | Concrete-class A | CUYD A A | 48 | $3,618.49 | $3,060.00 | $2,930.00 | $2,500.00 |
| 0380 | Concrete-class AA | CUYD A A | 170 | $1,646.15 | $1,830.00 | $1,535.00 | $2,000.00 |
| 0390 | Steel reinforcement | LB A A | 1,156 | $8.56 | $1.50 | $2.02 | $2.50 |
| 0400 | Steel reinforcement-epoxy coated | LB A A | 49,722 | $1.93 | $1.65 | $1.80 | $2.50 |
| 0410 | Remove superstructure | LS A A | 1 | $128,750 | $172,000 | $258,700 | $365,000 |
| 0420 | Expansion dam-neoprene | LF A A | 65 | $293.58 | $180.00 | $290.00 | $300.00 |
| 0430 | Precast PC I beam type 2 | LF A A | 733 | $500.95 | $420.00 | $575.00 | $630.00 |
| 0440 | Concrete sealing | SQFT A A | 8,247 | $2.39 | $2.00 | $2.80 | $2.50 |
| 0450 | Epoxy injection crack repair | LF A A | 90 | $122.33 | $92.00 | $220.00 | $200.00 |
| 0460 | Deck drain | EACH A A | 2 | $525.42 | $1,925.00 | $965.00 | $2,750.00 |
| 0470 | Rail system single slope - 40 in | LF A A | 149 | $276.11 | $290.00 | $168.00 | $325.00 |
| 0480 | Concrete coating | SQFT A A | 2,488 | $7.83 | $12.60 | $8.29 | $8.00 |
| 0490 | Demobilization | LS A A | 1 | $21,654 | $24,550 | $26,300 | $33,938 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of September 25, 2025. Compiled by Mirage Metrics.