KYTC contract 25-5370 bid tabulation

BRIDGE SUPERSTRUCTURE REPLACEMENT I-165. Let by Kentucky Transportation Cabinet on February 20, 2025, Butler, District 3. 2 bids received; low bid $18,726,209 by Scott and Murphy Inc, +5.9% against the engineer's estimate of $17,685,896.

Owner
Kentucky Transportation Cabinet
Letting
20 FEB 2025
Pay items
95
Data through
22 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Scott and Murphy Inc$18,726,209Low+6.0%
2Haydon Bridge Company Inc$22,593,506+21%+28%
KYTC contract 25-5370: bids by rank

Engineer's estimate: $17,685,896.

Bid tabulation

LinePay itemUnitQuantity1. Scott and Murphy Inc2. Haydon Bridge Company Inc
0010Crushed stone baseTON A6,850$56.00$36.73
0020Crushed aggregate size no 23TON A732$74.00$53.20
0030Asphalt seal aggregateTON A119$220.83$220.83
0040Asphalt seal coatTON A15$1,077.85$1,077.85
0050Leveling & wedging PG76-22TON A265$160.09$160.09
0060CL2 asph base 1.00D PG64-22TON A2,823$124.91$124.91
0070CL3 asph base 1.00D PG64-22TON A180$179.30$179.30
0080CL3 asph base 1.00D PG76-22TON A90$200.99$200.99
0090CL2 asph surf 0.38D PG64-22TON A435$159.75$159.75
0100CL3 asph surf 0.38A PG76-22TON A397$186.86$186.86
0110Asphalt material for tackTON A12$753.49$753.49
0120Fuel adjustmentDOLL A6,533$1.00$1.00
0130Asphalt adjustmentDOLL A16,409$1.00$1.00
0140Joint adhesiveLF A2,400$2.00$2.21
0150Perforated pipe-4 inLF A160$36.00$10.07
0160Non-perforated pipe-4 inLF A24$28.00$19.90
0170Remove curbLF A400$20.00$7.29
0180Delineator for guardrail mono directional whiteEACH A4$16.25$17.91
0190Delineator for guardrail mono directional yelloEACH A8$16.25$17.91
0200Delineator for barrier - whiteEACH A12$17.50$19.30
0210Delineator for barrier - yellowEACH A12$17.50$19.30
0220Delineator for barrier wall-B/WEACH A14$19.00$20.95
0230Barricade-type IIIEACH A4$415.00$325.00
0240Guardrail-steel W beam-S faceLF A400$34.40$37.93
0250Guardrail-steel W beam-D faceLF A1,100$59.29$65.36
0260Remove guardrailLF A1,564$4.25$4.68
0270Extra length guardrail postEACH A20$70.00$77.18
0280Clearing and grubbingLS A1$6,800.00$450,000
0290Temporary signsSQFT A500$13.00$25.00
0300Maintain & control trafficLS A1$260,000$950,000
0310Lane closureEACH A4$5,500.00$20,000
0315Portable changeable message signEACH A4$9,800.00$12,500
0320Mobilization for mill & textLS A1$5,220.82$5,220.82
0330Shoulder rumble stripsLF A16,000$0.35$0.39
0340StakingLS A1$15,500$125,000
0350Relocate crash cushionEACH A4$3,368.38$3,713.64
0360Conc barrier wall type 9TLF A2,400$140.00$295.00
0370Tubular markersEACH A330$152.00$105.00
0380Erosion control blanketSQYD A8,912$3.25$3.58
0390Pave striping-thermo-6 in WLF A4,832$1.35$1.49
0400Pave striping-thermo-6 in YLF A13,340$1.35$1.49
0410Pave striping-temp rem tape-BLF A2,000$3.00$3.31
0420Pave striping-temp rem tape-WLF A26,900$2.75$3.03
0430Pave striping-temp rem tape-YLF A25,400$2.75$3.03
0440Pave striping-dur TY 1-6 in WLF A1,950$9.00$9.92
0450Pave striping-dur TY 1-6 in YLF A1,560$9.00$9.92
0460Inlaid pavement marker-MWEACH A132$25.00$27.56
0470Crash cushion TY VI class BT TL3EACH A4$7,100.00$7,827.75
0480Crash cushion TY VI class CEACH A2$39,217$43,237
0490Relocate conc barrier wallLF A2,400$12.00$25.00
0500Remove and reset perf pipe headwallEACH A6$995.00$824.00
0510Reconstruct curb box inletEACH A4$5,000.00$5,150.00
0520Longitudinal edge keyLF A5,760$4.34$4.34
0530Erosion controlLS A1$13,800$40,000
0540Concrete wedge curbLF A279$25.00$85.00
0550Asphalt milling and texturingSQYD A5,150$4.05$4.05
0560Median crossover removalEACH A2$86,400$52,455
0570Object marker type 1EACH A2$419.32$462.31
0580Queue protection vehicleHOUR A2,880$160.00$125.00
0590Thrie beam guardrail transition TL-3EACH A8$3,916.05$3,347.24
0600Furnish queue protection vehiclesMONT A19$7,220.00$9,500.00
0610Portable queue warning alert systemMONT A19$2,960.00$1,500.00
0620Queue warning PCMSMONT A114$820.00$700.00
0630Queue warning portable radar sensorsMONT A114$350.00$275.00
0640Connected arrow panelMONT A38$575.00$600.00
0650Junction box-24 inEACH A4$1,945.00$1,250.00
0660Conc median barrier type A TL5 56 inLF A200$200.00$275.00
0670Conc median barrier type B TL5 56 inLF A781$198.00$230.00
0680Paved ditch type 2SQYD A5$700.00$1,650.00
0690Structure granular backfillCUYD A250$167.00$90.00
0700Remove concrete masonryCUYD A2,359$858.00$995.00
0710Masonry coatingSQYD A3,440$25.00$17.50
0720Armored edge for concreteLF A128$206.00$140.00
0730Foundation preparationLS A1$103,000$650,000
0740Cyclopean stone rip rapTON A3,325$98.00$90.00
0750Concrete-class AACUYD A1,600$2,315.00$1,840.00
0760Steel reinforcement-epoxy coatedLB A524,503$2.24$4.95
0770Structural steelLS A1$912,000$1,995,000
0780Shear connectorsLS A1$314,000$695,000
0790Expansion dam-4 in neopreneLF A64$485.00$625.00
0795Time componentDOLL A10,000$365.00$220.00
0800Concrete patching repairSQFT A159$377.00$250.00
0810Girder repairEACH A8$27,500$35,000
0820Concrete sealingSQFT A73,300$5.00$2.28
0830Inspection walkwayLF A770$614.15$750.00
0840Deck drainEACH A52$1,165.00$750.00
0850Finger expansion jointLF A64$7,400.00$9,500.00
0860Steel repairEACH A152$1,790.00$1,600.00
0870PVC conduit-3 in-schedule 80LF A845$28.00$30.00
0880Bearing lubricationEACH A8$750.00$950.00
0890Rail system single slope - 40 inLF A1,689$135.00$175.00
0900Concrete coatingSQFT A5,440$5.80$6.00
0910Mobilization for concrete surf treatmentLS A1$1,000.00$7,500.00
0920MobilizationLS A1$230,000$955,000
0930DemobilizationLS A1$230,151$290,000
KYTC contract 25-5370: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.

Every contract let that day: KYTC letting of February 20, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy