KYTC contract 25-1032 bid tabulation

GRADE, DRAIN & SURFACE WITH BRIDGE I-71 WIDENING. Let by Kentucky Transportation Cabinet on October 23, 2025. 2 bids received; low bid $50,294,708 by Haydon Bridge Company Inc, +5.1% against the engineer's estimate of $47,849,842.

Owner
Kentucky Transportation Cabinet
Letting
23 OCT 2025
Pay items
352
Data through
22 OCT 2026

1 of the 2 bids matched their published totals to within a dollar and are shown; the others are left out.

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Haydon Bridge Company Inc$50,294,708Low+5.0%
KYTC contract 25-1032: bids by rank

Engineer's estimate: $47,849,842.

Bid tabulation

LinePay itemUnitQuantity1. Haydon Bridge Company Inc
0010Trenching and backfillingLF A A70$7.99
0020Cable-no. 14/7CLF A A2,850$1.86
0030AnchorEACH A A1$631.20
0040Messenger-15400 LBLF A A600$8.93
0050Install steel strain poleEACH A A4$2,158.02
0060Temp relocation of signal headEACH A A6$736.40
0070Install pedestrian head-LEDEACH A A4$367.81
0080Install LED signal-3 sectionEACH A A8$449.95
0090Install LED signal- 4 sectionEACH A A1$486.70
0100Install pedestrian detectorEACH A A4$367.81
0110Remove & reinstall coordinating unitEACH A A1$1,031.00
0120Traffic signal pole baseCUYD A A18$456.90
0130Install signal pedestalEACH A A2$1,662.55
0140Install pedestal postEACH A A2$1,479.84
0150Tether wireLF A A600$8.93
0160PVC conduit-1 1/4 in-schedule 80LF A A70$5.99
0170Install signal controller-TY atcEACH A A1$25,233
0180Remove signal equipmentEACH A A1$4,264.73
0190Install radar presence detector type AEACH A A3$1,178.46
0200Dga baseTON A A18,476$27.14
0210Cement stabilized roadbedSQYD A A46,659$4.72
0220Drainage blanket-type II-asphTON A A14,145$78.00
0230Asphalt seal aggregateTON A A201$99.97
0240Asphalt seal coatTON A A24$981.00
0250Leveling & wedging PG64-22TON A A416$92.00
0260Leveling & wedging PG76-22TON A A2,727$110.00
0270CL3 asph base 1.00D PG64-22TON A A8,709$79.00
0280CL4 asph base 1.00D PG64-22TON A A15,068$77.00
0290CL4 asph base 1.00D PG76-22TON A A9,480$85.00
0300CL3 asph surf 0.38D PG64-22TON A A2,537$89.00
0310CL4 asph surf 0.38A PG76-22TON A A11,512$96.00
0320Asphalt curing sealTON A A48$600.00
0330CementTON A A938$205.45
0340Mobilization for mill & textLS A A1$12,500
0350Asphalt pave milling & texturingTON A A10,390$21.00
0360Sand for blotterTON A A117$1.00
0370Sidewalk-4 in concreteSQYD A A1,110$59.13
0380Joint adhesiveLF A A106,876$0.01
0390Longitudinal edge keyLF A A24,912$1.20
0400Asphalt material for tack non-trackingTON A A188$0.01
0410Crushed aggregate size no 2TON A A16,033$49.28
0420Perforated pipe-6 inLF A A11,290$15.65
0430Non-perforated pipe-6 inLF A A424$30.00
0440Perf pipe headwall TY 4-6 inEACH A A1$1,500.00
0450Flume inlet type 1EACH A A3$5,864.62
0460Flume inlet type 2EACH A A17$5,096.05
0470Special header curbLF A A3,276$13.95
0480Lip header curbLF A A165$52.53
0490Island header curb type 1LF A A547$45.44
0500Remove concrete roll curbLF A A66$32.44
0510Conc median barrier type A TL5 56 inLF A A10,231$163.76
0520Conc median barrier type A TL5 56 inLF A A185$526.03
0530Delineator for guardrail mono directional whiteEACH A A405$14.19
0540Delineator for guardrail mono directional yelloEACH A A10$14.19
0550Delineator for barrier - yellowEACH A A200$12.57
0560Delineator for guardrail BI directional whiteEACH A A4$13.38
0570Relocate temp conc barrierLF A A18,200$9.32
0580Barricade-type IIIEACH A A8$150.00
0590PCC pavement diamond grindingSQYD A A5,618$4.00
0600JPC pavement-12 inSQYD A A166$184.36
0610JPC pavement-7 inSQYD A A121$174.98
0620Remove pavementSQYD A A8,556$17.36
0630Temp ditchLF A A6,944$1.76
0640Clean temp ditchLF A A3,472$1.76
0650Roadway excavationCUYD A A40,364$26.91
0660Granular embankmentCUYD A A978$77.30
0670WaterMGAL A A2,400$1.00
0680Fence-woven wire type 1LF A A25,112$7.08
0690Double vehicular woven wire gateEACH A A1$6,504.57
0700Guardrail-steel W beam-S faceLF A A28,412.50$27.57
0710Guardrail end treatment type 1EACH A A7$3,447.94
0720Guardrail end treatment type 2MEACH A A10$1,854.27
0730Guardrail end treatment type 7EACH A A1$1,975.46
0740Remove guardrailLF A A31,898$3.15
0750Remove guardrail terminal sectEACH A A2$4.50
0760Remove guardrail end treatmentEACH A A9$106.06
0770Channel lining class IITON A A644$71.16
0780Clearing and grubbingLS A A1$74,330
0790Concrete-class BCUYD A A52.52$1,761.43
0800Temporary signsSQFT A A1,450$7.00
0810Object marker type 2EACH A A12$380.17
0820Project CPM scheduleLS A A1$45,000
0830Fabric-geotextile class 1SQYD A A5,372$2.64
0840Handrail-type A-2LF A A80$225.00
0850Maintain & control trafficLS A A1$45,544
0860Maintain & control trafficLS A A1$995,000
0870Portable changeable message signEACH A A10$7,800.00
0880Edgeline rumble stripsLF A A42,724$0.15
0890Temp silt fenceLF A A6,944$2.00
0900Silt trap type AEACH A A48$150.00
0910Silt trap type BEACH A A48$150.00
0920Silt trap type CEACH A A48$150.00
0930Clean silt trap type AEACH A A48$150.00
0940Clean silt trap type BEACH A A48$150.00
0950Clean silt trap type CEACH A A48$150.00
0960StakingLS A A1$150,000
0970Remove structureLS A A1$160,000
0980Remove structureLS A A1$160,000
0990Relocate crash cushionEACH A A7$5,868.33
1000Masonry coatingSQYD A A11,547$9.33
1010Conc barrier wall type 9TLF A A26,920$36.14
1020Erosion control blanketSQYD A A10,642$1.64
1030Temp mulchSQYD A A154,357$0.23
1040Temp seeding and protectionSQYD A A115,265$0.30
1050Initial fertilizerTON A A4.90$965.00
1060Maintenance fertilizerTON A A2.90$965.00
1070Seeding and protectionSQYD A A95,011$0.44
1080Agricultural limestoneTON A A58.90$97.00
1090Flexible delineator post-M/YEACH A A55$78.26
1100Pave striping-temp paint-4 inLF A A1,178$0.24
1110Pave striping-temp paint-6 inLF A A196,757$0.26
1120Pave striping removal-4 inLF A A1,178$0.78
1130Pave striping removal-6 inLF A A27,974$0.82
1140Pave striping-thermo-6 in WLF A A44,722$1.30
1150Pave striping-thermo-6 in YLF A A31,927$1.30
1160Pave striping-thermo-12 in WLF A A4,018$2.60
1170Pave striping-thermo-12 in YLF A A399$2.65
1180Pave striping-temp rem tape-WLF A A5,670$2.07
1190Pave striping-temp rem tape-YLF A A27,613$1.97
1200Pave marking-thermo stop bar-24INLF A A162$12.95
1210Pave marking-thermo cross-hatchSQFT A A2,619$5.95
1220Pave marking-thermo STR arrowEACH A A4$125.00
1230Pave marking-thermo curv arrowEACH A A30$135.00
1240Pavement marker TY iva-MW tempEACH A A300$7.00
1250Pavement marker TY iva-MY tempEACH A A300$7.00
1260Remove pavement marker type VEACH A A1,135$6.00
1270Inlaid pavement marker-MWEACH A A636$28.00
1280Inlaid pavement marker-MYEACH A A292$28.00
1290Inlaid pavement marker-B W/REACH A A78$28.00
1300Inlaid pavement marker-B Y/REACH A A48$28.00
1310Foundation preparationLS A A1$1,100,000
1320Retaining wallSQFT A A3,600$30.21
1340Crash cushion TY 6 class T TL3EACH A A4$6,196.07
1350Fuel adjustmentDOLL A A102,385$1.00
1360Asphalt adjustmentDOLL A A240,409$1.00
1370S manhole adjust to gradeEACH A A1$3,640.99
1390Object marker TY 3EACH A A4$404.41
1400Site preparationLS A A1$225,000
1410Temporary median crossoverEACH A A2$12,602
1420Law enforcement officerHOUR A A400$80.00
1430Remove crash cushionEACH A A11$195.96
1440Remove bridge end connectorEACH A A35$195.96
1450Sawcut pavementLF A A26,057$1.50
1460Sound barrier wallSQFT A A72,846$38.00
1470Flume inlet TY 2-modEACH A A1$8,998.51
1480Pave marking-thermo yield bar-36 inLF A A144$31.00
1490Barrier wall transitionLF A A73$704.09
1500End anchorsEACH A A2$13,690
1510Detectable warningsSQFT A A122$49.42
1520High friction surface treatmentSQYD A A11,236$36.25
1530Pave mark TY 1 tape cross-hatchSQFT A A172$20.00
1540Median crossover removalEACH A A2$0.50
1550Pave mark thermo-lane reduction arrowEACH A A3$425.00
1560Remove thermoplastic arrowsEACH A A2$150.00
1570Crash cushion TY 6 class C TL3EACH A A1$48,799
1580Remove cable guardrail barrier systemLF A A10,217$3.15
1590Pave mark thermo chevronSQFT A A392$5.95
1600Pave mark thermo-wrong way arrowEACH A A10$395.00
1610Vibrating wire piezometerEACH A A2$2,500.00
1620Remove pavement markerEACH A A544$6.00
1630Pave marking-thermo elong route shieldEACH A A10$3,850.00
1640Thrie beam guardrail transition TL-3EACH A A18$5,882.01
1650Pave mark TY 1 tape lane reduction arrowEACH A A1$1,950.00
1660Pave mark TY 1 tape chevronSQFT A A132$20.00
1670Thrie beam bullnose terminalEACH A A1$25,592
1680Connected arrow panelMONT A A8$375.00
1690Pave stripe-wet ref cont tape-6 in WLF A A2,279$14.00
1700Pave stripe-wet ref cont tape-6 in YLF A A1,650$14.00
1710Pave stripe-wet ref cont tape-12 in WLF A A607$28.00
1720Electronic delivery MGMT system - aggLS A A1$0.01
1730Storm sewer pipe-15 inLF A A1,475$130.93
1740Storm sewer pipe-18 inLF A A2,146$98.74
1750Storm sewer pipe-24 inLF A A53$186.57
1760Pipe culvert headwall-18 inEACH A A1$2,213.15
1770Pipe culvert headwall-24 inEACH A A1$2,332.53
1780Remove pipeLF A A219$33.50
1790Sloped and parallel headwall-15 inEACH A A1$3,273.57
1800Curb box inlet type BEACH A A1$10,651
1810Conc med barr box inlet TY B1 TL5 56EACH A A3$14,194
1820Conc med barr box inlet TY B1 TL5 56EACH A A9$14,674
1830Conc med barr box inlet TY B2 TL5 56EACH A A32$14,175
1840Conc med barr box inlet TY A2 TL5 56EACH A A4$20,122
1850Conc med barr box inlet TY A2 TL5 56EACH A A1$16,347
1860Remove inletEACH A A31$844.53
1870Fabric-geotextile class 2 for pipeSQYD A A5,096$2.00
1880Remove headwallEACH A A6$803.58
1890SafeloadingCUYD A A35$962.00
1900Concrete-class ACUYD A A25$1,244.44
1910Bore and jack pipe-24 inLF A A56$995.26
1920Bore and jack pipe-18 inLF A A71$831.82
1930Pipeline inspectionLF A A1,957$2.35
1940Granular embankmentCUYD A A469$125.00
1950Foundation preparationLS A A1$295,000
1960Concrete-class ACUYD A A1,181.30$885.00
1970Steel reinforcementLB A A210,141$1.46
1980Junction box-24 inEACH A A4$1,200.00
1990Structure granular backfillCUYD A A158.20$90.00
2000Armored edge for concreteLF A A58.50$150.00
2010Conduit-3 inLF A A287$40.00
2020Foundation preparationLS A A1$175,000
2030Reinf conc slope wall-4 inSQYD A A210$240.00
2040Test pilesLF A A290$150.00
2050Piles-steel HP14X117LF A A1,764$150.00
2060Pile points-14 inEACH A A32$165.00
2070Concrete-class ACUYD A A142.40$1,550.00
2080Concrete-class AACUYD A A221.90$1,550.00
2090Steel reinforcementLB A A18,938$1.50
2100Steel reinforcement-epoxy coatedLB A A64,335$1.75
2110Remove superstructureLS A A1$190,000
2120Precast PC box beam SB21LF A A550.30$340.00
2130Electrical junction box type AEACH A A4$1,750.00
2140Concrete sealingSQFT A A7,580$2.00
2150Epoxy injection crack repairLF A A4$500.00
2160Mobilization for concrete surf treatmentLS A A1$1,000.00
2170Junction box-24 inEACH A A6$1,200.00
2180Structure granular backfillCUYD A A848$80.00
2190Remove concrete masonryCUYD A A278$1,150.00
2200Armored edge for concreteLF A A221.50$125.00
2210Foundation preparationLS A A1$2,750,000
2220Cyclopean stone rip rapTON A A504$115.00
2230Test pilesLF A A659$135.00
2240Piles-steel HP14X89LF A A3,822$135.00
2250Pile points-14 inEACH A A44$200.00
2260Concrete-class ACUYD A A735.90$1,750.00
2270Concrete-class AACUYD A A1,215.10$1,500.00
2280Mechanical reinf coupler #5EACH A A80$50.00
2290Mechanical reinf coupler #10EACH A A64$200.00
2300Steel reinforcementLB A A91,599$2.65
2310Steel reinforcement-epoxy coatedLB A A327,278$2.05
2320Remove superstructureLS A A1$1,075,000
2330Precast PC I beam type 4LF A A2,878$795.00
2340Electrical junction box type AEACH A A4$1,750.00
2350Micropile proof testEACH A A2$11,000
2360Concrete sealingSQFT A A73,769$2.89
2370Deck drainEACH A A40$950.00
2380Micropile verification testEACH A A1$165,000
2390Mechanical reinf coupler #4-epoxy coatedEACH A A1,964$61.00
2400PVC conduit-3 in-schedule 80LF A A492$23.00
2410Rail system single slope - 40 inLF A A492$150.00
2420Micropile bond zoneEACH A A12$12,000
2430Galvanic anodeEACH A A552$130.00
2440Micropiles-9 5/8 in-commonLF A A1,544$225.00
2450Micropiles-9 5/8 in-solid rockLF A A60$725.00
2460Junction box-24 inEACH A A6$1,200.00
2470Structure granular backfillCUYD A A229.60$80.00
2480Armored edge for concreteLF A A69.10$125.00
2490Conduit-3 inLF A A549$60.00
2500Foundation preparationLS A A1$175,000
2510Crushed aggregate slope protTON A A271$70.00
2520Test pilesLF A A439$150.00
2530Piles-steel HP14X117LF A A2,684$150.00
2540Pile points-14 inEACH A A32$200.00
2550Concrete-class ACUYD A A187.30$1,750.00
2560Concrete-class AACUYD A A449.20$1,850.00
2570Mechanical reinf coupler #6 epoxy coatedEACH A A1,662$81.00
2580Steel reinforcementLB A A27,812$2.16
2590Steel reinforcement-epoxy coatedLB A A160,270$1.94
2600Remove superstructureLS A A1$295,000
2610Electrical junction box type AEACH A A4$1,600.00
2620Micropile proof testEACH A A2$11,000
2630Concrete sealingSQFT A A14,477$1.52
2640Epoxy injection crack repairLF A A30$225.00
2650PPC I-beam type HN 42-49LF A A1,085.30$1,250.00
2660Micropile verification testEACH A A1$165,000
2670Micropile bond zoneEACH A A4$12,000
2680Micropiles-9 5/8 in-commonLF A A496$225.00
2690Micropiles-9 5/8 in-solid rockLF A A16$725.00
2700Mobilization for concrete surf treatmentLS A A1$1,250.00
2710Junction box-24 inEACH A A4$1,200.00
2720Structure granular backfillCUYD A A196$90.00
2730Armored edge for concreteLF A A58.90$150.00
2740Foundation preparationLS A A1$175,000
2750Crushed aggregate slope protTON A A199$60.00
2760Test pilesLF A A424$150.00
2770Piles-steel HP14X117LF A A2,656$150.00
2780Pile points-14 inEACH A A32$165.00
2790Concrete-class ACUYD A A158.80$1,550.00
2800Concrete-class AACUYD A A224.90$1,550.00
2810Steel reinforcementLB A A22,168$1.50
2820Steel reinforcement-epoxy coatedLB A A47,686$1.75
2830Remove superstructureLS A A1$190,000
2840Precast PC box beam SB21LF A A632.70$360.00
2850Electrical junction box type AEACH A A4$1,600.00
2860Concrete patching repairSQFT A A203$150.00
2870Concrete sealingSQFT A A8,731$2.00
2880Epoxy injection crack repairLF A A16$300.00
2890PVC conduit-3 in-schedule 80LF A A318$15.00
2900Mobilization for concrete surf treatmentLS A A1$1,000.00
2910Reference markerEACH A A24$308.04
2920Barrier mounting bracketEACH A A12$372.68
2930GMSS galv steel type ALB A A3,191$4.58
2940SBM aluminum panel signsSQFT A A3,038$39.38
2950SBM alum sheet signs .080 inSQFT A A301.80$41.87
2960SBM alum sheet signs .125 inSQFT A A1,005.90$46.71
2970Steel post type 1LF A A1,654$33.68
2980Steel post mile markersEACH A A4$397.94
2990Oss galv steel cantileverEACH A A4$90,165
3000GMSS galv steel type CLB A A598$13.31
3010Rem overhead sign support STREACH A A5$5,394.05
3020Rem overhead struc conc baseEACH A A5$5,394.05
3030Remove sign support beamEACH A A10$359.60
3040Oss galv steel 60 FT trussEACH A A2$148,163
3050Class A concrete for signsCUYD A A186.30$1,019.63
3060Steel reinforcement for signsLB A A14,708$2.51
3070Remove & relocate signsEACH A A4$2,400.00
3080Roadway cross sectionEACH A A19$539.41
3090Barrier wall postEACH A A5$1,795.66
3100Remove signEACH A A14$719.21
3110GMSS type DEACH A A29$602.13
3120Barcode sign inventoryEACH A A148$44.95
3130Pole 80 FT MTG HT high mastEACH A A4$64,232
3140Fused connector kitEACH A A18$238.51
3150MarkerEACH A A10$446.96
3160Trenching and backfillingLF A A3,575$7.99
3170Remove lightingLS A A1$41,748
3180Electrical junction box type AEACH A A11$1,503.12
3190Electrical junction box type CEACH A A2$2,295.59
3200Maintain lightingLS A A1$41,468
3210Bore and jack conduitLF A A1,240$19.77
3220Pole base-high mastCUYD A A20$456.90
3230Wire-no. 10LF A A2,025$1.47
3240High mast LED luminaireEACH A A16$2,935.98
3250Cable-no. 10/3C ductedLF A A5,415$4.32
3260PVC conduit-2 in-schedule 80LF A A610$8.26
3270PVC conduit-3 in-schedule 80LF A A1,050$12.94
3280Conduit-1 1/4 inLF A A80$18.55
3290Conduit-2 inLF A A20$24.49
3300Electrical junction box type BEACH A A2$1,051.95
3310Trenching and backfillingLF A A90$7.99
3320Piezoelectric sensorEACH A A6$3,094.29
3330Loop wireLF A A2,650$0.89
3340Loop saw slot and fillLF A A600$19.95
3350Galvanized steel cabinetEACH A A2$1,317.72
3360Wood postEACH A A4$515.48
3370Site preparationEACH A A1$5,963.06
3380Pole baseEACH A A1$9,482.03
3390Conduit-2 inLF A A525$24.49
3400Electrical junction box type BEACH A A1$1,051.95
3410Trenching and backfillingLF A A525$7.99
3420Wire-no. 4LF A A1,050$2.90
3430Concrete-class ACUYD A A39.70$1,019.91
3440Steel reinforcementLB A A2,779$2.51
3450CCTV assemblyEACH A A2$6,726.48
3460Model 336 enclosureEACH A A2$22,834
3470Surge device 120 voltEACH A A2$2,261.91
3480Data surge deviceEACH A A2$2,263.34
3490Video surge deviceEACH A A2$2,290.50
3500Pole 50 FT-installEACH A A1$9,809.26
3510Inst variable message sign-exist trussEACH A A1$86,156
3520Trainee payment reimbursementHOUR A A1,400$1.00
3530MobilizationLS A A1$2,335,000
3540DemobilizationLS A A1$708,500
KYTC contract 25-1032: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.

Every contract let that day: KYTC letting of October 23, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy