KYTC contract 26-2131 bid tabulation

ASPHALT RESURFACING BROADWAY ST/GRIDERVILLE RD/HISEVILLE RD (KY 70). Let by Kentucky Transportation Cabinet on August 20, 2026. 2 bids received; low bid $1,450,000 by Cleary Construction Inc, -17% against the engineer's estimate of $1,757,238.

Owner
Kentucky Transportation Cabinet
Letting
20 AUG 2026
Pay items
19
Data through
22 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Cleary Construction Inc$1,450,000Low-17%
2Scotty'S Contracting & Stone LLC$1,455,1020.0%-17%
KYTC contract 26-2131: bids by rank

Engineer's estimate: $1,757,238.

Bid tabulation

LinePay itemUnitQuantity1. Cleary Construction Inc2. Scotty'S Contracting & Stone LLC
0010Dga baseTON A A850$34.00$38.17
0020Leveling & wedging PG64-22TON A A2,124$89.00$92.78
0030CL2 asph surf 0.38D PG64-22TON A A10,325$89.00$92.16
0040Temporary signsSQFT A A830$5.00$5.74
0050Maintain & control trafficLS A A1$27,250$31,829
0060Mobilization for mill & textLS A A1$3,000.00$2,851.56
0070Asphalt pave milling & texturingTON A A380$27.00$24.53
0080Edgeline rumble stripsLF A A117,080$0.23$0.23
0090Base failure repairSQYD A A110$175.00$153.95
0100Pave striping-temp paint-6 inLF A A132,476$0.32$0.01
0110Pave striping-perm paint-6 inLF A A248,393$0.33$0.33
0120Pave marking-thermo stop bar-24INLF A A153$14.00$14.00
0130Pave marking-thermo curv arrowEACH A A4$140.00$140.00
0140Fuel adjustmentDOLL A A19,563$1.00$1.00
0150Asphalt adjustmentDOLL A A49,137$1.00$1.00
0160Pave marking-thermo stopEACH A A4$350.00$350.00
0170Asphalt material for tack non-trackingTON A A80$0.01$0.01
0180Install radar presence detector type AEACH A A1$2,500.00$4,825.00
0190DemobilizationLS A A1$22,636$20,489
KYTC contract 26-2131: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.

Every contract let that day: KYTC letting of August 20, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy