KYTC contract 26-3064 bid tabulation
ASPHALT RESURFACING SANDY CREEK RD (KY 1153). Let by Kentucky Transportation Cabinet on October 22, 2026. 2 bids received; low bid $503,738 by Scotty'S Contracting & Stone LLC, -9.0% against the engineer's estimate of $553,558.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 22 OCT 2026
- Pay items
- 15
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Scotty'S Contracting & Stone LLC | $503,738 | Low | -9.0% |
| 2 | Cleary Construction Inc | $655,332 | +30% | +18% |
Engineer's estimate: $553,558.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Scotty'S Contracting & Stone LLC | 2. Cleary Construction Inc |
|---|---|---|---|---|---|
| 0010 | Dga base | TON A A | 315 | $43.12 | $49.00 |
| 0020 | Leveling & wedging PG64-22 | TON A A | 323 | $108.76 | $128.00 |
| 0030 | CL2 asph surf 0.38D PG64-22 | TON A A | 3,000 | $96.60 | $128.00 |
| 0040 | Temporary signs | SQFT A A | 390 | $6.33 | $6.00 |
| 0050 | Maintain & control traffic | LS A A | 1 | $9,799.30 | $21,000 |
| 0060 | Mobilization for mill & text | LS A A | 1 | $9,067.70 | $6,500.00 |
| 0070 | Asphalt pave milling & texturing | TON A A | 265 | $25.80 | $82.00 |
| 0080 | Base failure repair | SQYD A A | 1,000 | $79.78 | $115.00 |
| 0090 | Pave striping-temp paint-4 in | LF A A | 15,000 | $0.30 | $0.30 |
| 0100 | Pave striping-perm paint-4 in | LF A A | 48,500 | $0.31 | $0.31 |
| 0110 | Pave marking-thermo stop bar-24IN | LF A A | 22 | $20.00 | $20.00 |
| 0120 | Fuel adjustment | DOLL A A | 5,172 | $1.00 | $1.00 |
| 0130 | Asphalt adjustment | DOLL A A | 12,992 | $1.00 | $1.00 |
| 0140 | Asphalt material for tack non-tracking | TON A A | 22 | $543.55 | $0.01 |
| 0150 | Demobilization | LS A A | 1 | $7,176.16 | $9,843.78 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of October 22, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.