Flynn Brothers Contracting Inc: KYTC bid record

Flynn Brothers Contracting Inc submitted 116 bids on Kentucky Transportation Cabinet contracts in the data, from 27 JAN 2022 to 22 OCT 2026, and was the low bidder on 15 of them (13%). When it was not low, its total sat a median +13% above the low bid.

Owner
Kentucky Transportation Cabinet
Low bid volume
$20,402,864
Latest bid
22 OCT 2026
Data through
22 OCT 2026
116Bids
15Low bids
13Win rate, percent
+13%Median gap to the low bid when not low, 101 bids

By year

YearBidsLow bidsWin rate
202233515%
202316319%
202433412%
202522314%
20261200%
Flynn Brothers Contracting Inc, KYTC: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 5811417%
District 41000%
District 7200%
District 6100%
Flynn Brothers Contracting Inc, KYTC: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Pave marking-thermo stop bar-24INLF5741 (72%)$13.95$14.00
Fuel adjustmentDOL3939 (100%)$1.00$1.00
Asphalt adjustmentDOL3939 (100%)$1.00$1.00
Pave striping-temp paint-4 inLF7138 (54%)$0.26$0.20
Temporary signsSF7736 (47%)$4.00$6.50
Pave marking-thermo curv arrowEACH4436 (82%)$145.00$125.00
Pave striping-thermo-6 in WLF3529 (83%)$1.35$1.26
Pave marking-thermo X-walk-6 inLF3328 (85%)$4.00$4.00
Asphalt material for tack non-trackingTON5626 (46%)$631.28$535.00
Pave striping-perm paint-6 inLF3926 (67%)$0.29$0.32
Pave striping-thermo-6 in YLF3026 (87%)$1.35$1.25
Loop wireLF2522 (88%)$0.25$0.73
Flynn Brothers Contracting Inc, KYTC: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Flynn Brothers Contracting Inc, KYTC: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
22 OCT 202626-2162ASPHALT RESURFACING JEFFERSON COUNTY (KY 61, KY 1703)3 of 5$1,773,546+11%
22 OCT 202626-3051ASPHALT RESURFACING ROUTT RD (KY 1531)3 of 6$112,783+11%
22 OCT 202626-2556ASPHALT RESURFACING DIXIE HIGHWAY (US 31W)6 of 6$1,181,182+13%
03 SEP 202626-2193ASPHALT RESURFACING JEFFERSON COUNTY (US 42 & US 60)5 of 5$260,677+39%
20 AUG 202626-3022ASPHALT RESURFACING VARIOUS ROADS IN BULLITT CO5 of 5$387,374+24%
23 APR 202626-4401ASPHALT RESURFACING EAST BROADWAY (US 150)4 of 5$1,989,315+14%
26 MAR 202626-2045ASPHALT RESURFACING ZONETON ROAD (KY 1116)5 of 6$257,245+22%
26 MAR 202626-2050ASPHALT RESURFACING BETHLEHEM ROAD (KY 22)5 of 6$585,687+14%
26 MAR 202626-2165ASPHALT RESURFACING LAGRANGE ROAD (KY 146)6 of 6$1,062,724+17%
26 MAR 202626-2113ASPHALT RESURFACING TAYLORSVILLE ROAD (KY 55)5 of 7$387,946+18%
29 JAN 202626-1101ASPHALT PAVEMENT & ROADWAY REHAB KY 2452 of 5$17,489,935+4.0%
29 JAN 202626-4400ASPHALT PAVEMENT & ROADWAY REHAB ALGONQUIN PARKWAY (KY 2054)4 of 5$3,505,175+18%
11 DEC 202525-1128GRADE & DRAIN WITH ASPHALT SURFACE OUTER LOOP / FEGENBUSH LANE IMPROVEMENTS3 of 4$10,487,111+7.0%
23 OCT 202525-2367ASPHALT RESURFACING OLD BRIAR RIDGE ROAD (KY 3228)4 of 5$210,912+14%
23 OCT 202525-3114ASPHALT RESURFACING FISHERVILLE RD (KY 148)2 of 8$751,743+2.0%
23 OCT 202525-2285ASPHALT RESURFACING HURSTBOURNE PARKWAY (KY 1747)1 of 5$3,269,800Low, 2.0% under the second
23 OCT 202525-3118ASPHALT RESURFACING VARIOUS ROADS IN SPENCER CO3 of 5$489,659+10%
24 JUL 202525-2292ASPHALT RESURFACING WEST MAIN STREET (US 31W SOUTHBOUND ONLY)5 of 6$1,252,478+23%
24 JUL 202525-3096ASPHALT RESURFACING LOWER RIVER RD (KY 1230)3 of 6$323,171+8.0%
24 JUL 202525-3095ASPHALT RESURFACING VARIOUS ROADS IN BULLITT CO3 of 5$732,012+7.0%
05 JUN 202525-2218ASPHALT RESURFACING PRESTON HIGHWAY (KY 61)3 of 5$934,242+7.0%
22 MAY 202525-2216ASPHALT RESURFACING CEDAR GROVE ROAD (KY 480)4 of 6$93,194+41%
24 APR 202525-2062District 5ASPHALT RESURFACING OLD PRESTON HIGHWAY (XX 61)4 of 5$120,263+15%
24 APR 202525-2163District 5ASPHALT RESURFACING N PRESTON HIGHWAY (KY 61)4 of 5$676,793+10%
24 APR 202525-2164District 5ASPHALT RESURFACING SHELBYVILLE ROAD (US 60)2 of 5$1,132,143+3.0%
Flynn Brothers Contracting Inc: latest KYTC bids in the data

How this record was read

KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; KYTC's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy