Flynn Brothers Contracting Inc: KYTC bid record
Flynn Brothers Contracting Inc submitted 116 bids on Kentucky Transportation Cabinet contracts in the data, from 27 JAN 2022 to 22 OCT 2026, and was the low bidder on 15 of them (13%). When it was not low, its total sat a median +13% above the low bid.
- Owner
- Kentucky Transportation Cabinet
- Low bid volume
- $20,402,864
- Latest bid
- 22 OCT 2026
- Data through
- 22 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 33 | 5 | 15% |
| 2023 | 16 | 3 | 19% |
| 2024 | 33 | 4 | 12% |
| 2025 | 22 | 3 | 14% |
| 2026 | 12 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 5 | 81 | 14 | 17% |
| District 4 | 10 | 0 | 0% |
| District 7 | 2 | 0 | 0% |
| District 6 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Pave marking-thermo stop bar-24IN | LF | 57 | 41 (72%) | $13.95 | $14.00 | |
| Fuel adjustment | DOL | 39 | 39 (100%) | $1.00 | $1.00 | |
| Asphalt adjustment | DOL | 39 | 39 (100%) | $1.00 | $1.00 | |
| Pave striping-temp paint-4 in | LF | 71 | 38 (54%) | $0.26 | $0.20 | |
| Temporary signs | SF | 77 | 36 (47%) | $4.00 | $6.50 | |
| Pave marking-thermo curv arrow | EACH | 44 | 36 (82%) | $145.00 | $125.00 | |
| Pave striping-thermo-6 in W | LF | 35 | 29 (83%) | $1.35 | $1.26 | |
| Pave marking-thermo X-walk-6 in | LF | 33 | 28 (85%) | $4.00 | $4.00 | |
| Asphalt material for tack non-tracking | TON | 56 | 26 (46%) | $631.28 | $535.00 | |
| Pave striping-perm paint-6 in | LF | 39 | 26 (67%) | $0.29 | $0.32 | |
| Pave striping-thermo-6 in Y | LF | 30 | 26 (87%) | $1.35 | $1.25 | |
| Loop wire | LF | 25 | 22 (88%) | $0.25 | $0.73 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Louisville Paving Company Inc | 111 | 78 of 111 |
| Mac Construction & Excavating Inc | 94 | 35 of 94 |
| E & B Paving LLC | 83 | 38 of 83 |
| Hall Contracting of Kentucky Inc | 64 | 32 of 64 |
| Mago Construction Company LLC | 45 | 38 of 45 |
| H G Mays Corporation | 13 | 11 of 13 |
| Hall Contracting of Kentucky Inc & Subsidiary | 12 | 10 of 12 |
| Libs Paving Company Inc | 11 | 3 of 11 |
| Scotty'S Contracting & Stone LLC | 9 | 7 of 9 |
| Wingham Paving Inc | 6 | 2 of 6 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 22 OCT 2026 | 26-2162 | ASPHALT RESURFACING JEFFERSON COUNTY (KY 61, KY 1703) | 3 of 5 | $1,773,546 | +11% | |
| 22 OCT 2026 | 26-3051 | ASPHALT RESURFACING ROUTT RD (KY 1531) | 3 of 6 | $112,783 | +11% | |
| 22 OCT 2026 | 26-2556 | ASPHALT RESURFACING DIXIE HIGHWAY (US 31W) | 6 of 6 | $1,181,182 | +13% | |
| 03 SEP 2026 | 26-2193 | ASPHALT RESURFACING JEFFERSON COUNTY (US 42 & US 60) | 5 of 5 | $260,677 | +39% | |
| 20 AUG 2026 | 26-3022 | ASPHALT RESURFACING VARIOUS ROADS IN BULLITT CO | 5 of 5 | $387,374 | +24% | |
| 23 APR 2026 | 26-4401 | ASPHALT RESURFACING EAST BROADWAY (US 150) | 4 of 5 | $1,989,315 | +14% | |
| 26 MAR 2026 | 26-2045 | ASPHALT RESURFACING ZONETON ROAD (KY 1116) | 5 of 6 | $257,245 | +22% | |
| 26 MAR 2026 | 26-2050 | ASPHALT RESURFACING BETHLEHEM ROAD (KY 22) | 5 of 6 | $585,687 | +14% | |
| 26 MAR 2026 | 26-2165 | ASPHALT RESURFACING LAGRANGE ROAD (KY 146) | 6 of 6 | $1,062,724 | +17% | |
| 26 MAR 2026 | 26-2113 | ASPHALT RESURFACING TAYLORSVILLE ROAD (KY 55) | 5 of 7 | $387,946 | +18% | |
| 29 JAN 2026 | 26-1101 | ASPHALT PAVEMENT & ROADWAY REHAB KY 245 | 2 of 5 | $17,489,935 | +4.0% | |
| 29 JAN 2026 | 26-4400 | ASPHALT PAVEMENT & ROADWAY REHAB ALGONQUIN PARKWAY (KY 2054) | 4 of 5 | $3,505,175 | +18% | |
| 11 DEC 2025 | 25-1128 | GRADE & DRAIN WITH ASPHALT SURFACE OUTER LOOP / FEGENBUSH LANE IMPROVEMENTS | 3 of 4 | $10,487,111 | +7.0% | |
| 23 OCT 2025 | 25-2367 | ASPHALT RESURFACING OLD BRIAR RIDGE ROAD (KY 3228) | 4 of 5 | $210,912 | +14% | |
| 23 OCT 2025 | 25-3114 | ASPHALT RESURFACING FISHERVILLE RD (KY 148) | 2 of 8 | $751,743 | +2.0% | |
| 23 OCT 2025 | 25-2285 | ASPHALT RESURFACING HURSTBOURNE PARKWAY (KY 1747) | 1 of 5 | $3,269,800 | Low, 2.0% under the second | |
| 23 OCT 2025 | 25-3118 | ASPHALT RESURFACING VARIOUS ROADS IN SPENCER CO | 3 of 5 | $489,659 | +10% | |
| 24 JUL 2025 | 25-2292 | ASPHALT RESURFACING WEST MAIN STREET (US 31W SOUTHBOUND ONLY) | 5 of 6 | $1,252,478 | +23% | |
| 24 JUL 2025 | 25-3096 | ASPHALT RESURFACING LOWER RIVER RD (KY 1230) | 3 of 6 | $323,171 | +8.0% | |
| 24 JUL 2025 | 25-3095 | ASPHALT RESURFACING VARIOUS ROADS IN BULLITT CO | 3 of 5 | $732,012 | +7.0% | |
| 05 JUN 2025 | 25-2218 | ASPHALT RESURFACING PRESTON HIGHWAY (KY 61) | 3 of 5 | $934,242 | +7.0% | |
| 22 MAY 2025 | 25-2216 | ASPHALT RESURFACING CEDAR GROVE ROAD (KY 480) | 4 of 6 | $93,194 | +41% | |
| 24 APR 2025 | 25-2062 | District 5 | ASPHALT RESURFACING OLD PRESTON HIGHWAY (XX 61) | 4 of 5 | $120,263 | +15% |
| 24 APR 2025 | 25-2163 | District 5 | ASPHALT RESURFACING N PRESTON HIGHWAY (KY 61) | 4 of 5 | $676,793 | +10% |
| 24 APR 2025 | 25-2164 | District 5 | ASPHALT RESURFACING SHELBYVILLE ROAD (US 60) | 2 of 5 | $1,132,143 | +3.0% |
How this record was read
KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; KYTC's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.