KYTC contract 26-4400 bid tabulation
ASPHALT PAVEMENT & ROADWAY REHAB ALGONQUIN PARKWAY (KY 2054). Let by Kentucky Transportation Cabinet on January 29, 2026. 5 bids received; low bid $2,981,600 by E & B Paving LLC, -1.7% against the engineer's estimate of $3,034,597.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 29 JAN 2026
- Pay items
- 94
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | E & B Paving LLC | $2,981,600 | Low | -2.0% |
| 2 | Hall Contracting of Kentucky Inc | $3,314,000 | +11% | +9.0% |
| 3 | Mac Construction & Excavating Inc | $3,449,901 | +16% | +14% |
| 4 | Flynn Brothers Contracting Inc | $3,505,175 | +18% | +16% |
| 5 | Louisville Paving Company Inc | $3,773,000 | +27% | +24% |
Engineer's estimate: $3,034,597.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. E & B Paving LLC | 2. Hall Contracting of Kentucky Inc | 3. Mac Construction & Excavating Inc | 4. Flynn Brothers Contracting Inc | 5. Louisville Paving Company Inc |
|---|---|---|---|---|---|---|---|---|
| 0010 | Dga base | TON A A | 298 | $24.00 | $44.00 | $40.00 | $36.15 | $201.00 |
| 0020 | Leveling & wedging PG64-22 | TON A A | 639 | $80.00 | $83.00 | $131.00 | $85.75 | $110.00 |
| 0030 | Asphalt material for tack | TON A A | 42.50 | $1.00 | $0.01 | $0.01 | $406.25 | $0.01 |
| 0040 | CL3 asph surf 0.38B PG64-22 | TON A A | 6,386 | $80.00 | $83.00 | $95.00 | $80.00 | $83.00 |
| 0050 | Mobilization for mill & text | LS A A | 1 | $24,000 | $15,000 | $9,500.00 | $1,345.00 | $25,000 |
| 0060 | Asphalt pave milling & texturing | TON A A | 6,920 | $10.00 | $14.00 | $18.00 | $24.70 | $14.80 |
| 0070 | Milling concrete pavement | TON A A | 65 | $25.00 | $23.35 | $0.01 | $64.25 | $45.00 |
| 0080 | Standard header curb | LF A A | 44 | $259.00 | $65.00 | $63.63 | $87.90 | $76.00 |
| 0090 | Standard barrier median type 3 | SQYD A A | 325 | $40.00 | $160.00 | $91.48 | $205.90 | $240.00 |
| 0100 | Standard barrier median type 3 | SQYD A A | 325 | $56.50 | $200.00 | $109.69 | $222.80 | $240.00 |
| 0110 | Remove concrete island | SQYD A A | 646 | $60.00 | $146.00 | $1.00 | $200.25 | $250.00 |
| 0115 | PCC pavement diamond grinding | SQYD A A | 6,467 | $2.75 | $7.80 | $3.37 | $5.90 | $1.50 |
| 0120 | Saw-clean-reseal tverse joint | LF A A | 2,275 | $1.59 | $1.90 | $2.00 | $4.35 | $2.00 |
| 0130 | Saw-clean-reseal longit joint | LF A A | 3,295 | $1.59 | $1.90 | $2.00 | $4.15 | $2.00 |
| 0140 | Remove trees or stumps | EACH A A | 1 | $2,300.00 | $1,400.00 | $3,000.00 | $3,454.25 | $6,500.00 |
| 0150 | Temporary signs | SQFT A A | 500 | $7.50 | $4.00 | $7.49 | $4.00 | $4.00 |
| 0160 | Maintain & control traffic | LS A A | 1 | $86,396 | $126,444 | $339,000 | $136,450 | $141,000 |
| 0170 | Portable changeable message sign | EACH A A | 2 | $530.00 | $2,200.00 | $3,210.00 | $690.00 | $2,504.00 |
| 0180 | Silt trap type C | EACH A A | 11 | $150.00 | $100.00 | $168.99 | $212.45 | $1,677.00 |
| 0190 | Clean silt trap type C | EACH A A | 11 | $30.00 | $150.00 | $30.46 | $157.15 | $1,600.00 |
| 0200 | Sidewalk-4 in concrete | SQYD A A | 124 | $185.00 | $262.00 | $284.56 | $291.00 | $107.00 |
| 0210 | Arrow panel | EACH A A | 2 | $318.00 | $1,000.00 | $1,926.00 | $460.00 | $1,696.00 |
| 0220 | Temp signal 2 phase | EACH A A | 1 | $1,500.00 | $425.00 | $6,625.00 | $3,797.50 | $3,500.00 |
| 0230 | Pave striping-temp paint-6 in | LF A A | 4,355 | $0.36 | $0.36 | $0.36 | $0.36 | $0.36 |
| 0240 | Pave striping-thermo-6 in W | LF A A | 38,914 | $1.30 | $1.30 | $1.30 | $1.30 | $1.30 |
| 0250 | Pave striping-thermo-6 in Y | LF A A | 38,429 | $1.30 | $1.30 | $1.30 | $1.30 | $1.30 |
| 0260 | Pave striping-thermo-12 in W | LF A A | 85 | $2.60 | $2.60 | $2.60 | $2.60 | $2.60 |
| 0270 | Pave striping-dur TY 1-6 in W | LF A A | 4,282 | $7.95 | $7.95 | $7.95 | $7.95 | $7.95 |
| 0280 | Pave striping-dur TY 1-6 in Y | LF A A | 3,711 | $7.95 | $7.95 | $7.95 | $7.95 | $7.95 |
| 0290 | Pave marking-thermo X-walk-6 in | LF A A | 3,422 | $3.95 | $3.95 | $3.95 | $3.95 | $3.95 |
| 0300 | Pave marking-thermo stop bar-24IN | LF A A | 1,115 | $12.95 | $12.95 | $12.95 | $12.95 | $12.95 |
| 0310 | Pave marking-thermo cross-hatch | SQFT A A | 3,833 | $4.95 | $4.95 | $4.95 | $4.95 | $4.95 |
| 0320 | Pave marking-thermo curv arrow | EACH A A | 112 | $115.00 | $115.00 | $115.00 | $115.00 | $115.00 |
| 0330 | Pave marking-thermo comb arrow | EACH A A | 6 | $165.00 | $165.00 | $165.00 | $165.00 | $165.00 |
| 0340 | Pave marking-thermo only | EACH A A | 1 | $295.00 | $295.00 | $295.00 | $295.00 | $295.00 |
| 0350 | Inlaid pavement marker-MW | EACH A A | 75 | $29.00 | $29.00 | $29.00 | $29.00 | $29.00 |
| 0360 | Inlaid pavement marker-MY | EACH A A | 18 | $29.00 | $29.00 | $29.00 | $29.00 | $29.00 |
| 0370 | Inlaid pavement marker-by | EACH A A | 559 | $29.00 | $29.00 | $29.00 | $29.00 | $29.00 |
| 0380 | Fuel adjustment | DOLL A A | 11,001 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0390 | Asphalt adjustment | DOLL A A | 27,631 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0400 | Full depth patching | SQFT A A | 11,641 | $17.00 | $23.00 | $17.00 | $21.70 | $40.03 |
| 0405 | Law enforcement officer | HOUR A A | 100 | $80.00 | $100.00 | $95.00 | $85.00 | $80.00 |
| 0410 | Pave marking thermo-bike | EACH A A | 112 | $205.00 | $205.00 | $205.00 | $205.00 | $205.00 |
| 0420 | Pave marking thermo-bike | EACH A A | 1 | $325.00 | $325.00 | $325.00 | $325.00 | $325.00 |
| 0430 | Remove traffic island | SQYD A A | 215 | $2.70 | $19.50 | $215.00 | $3.00 | $100.00 |
| 0440 | Pave mark thermo cone cap-solid yellow | SQFT A A | 254 | $6.95 | $6.95 | $6.95 | $6.95 | $6.95 |
| 0450 | Pave marking-thermo yield bar-36 in | LF A A | 31 | $28.00 | $28.00 | $28.00 | $28.00 | $28.00 |
| 0460 | Pavement marking-thermo letters | EACH A A | 12 | $195.00 | $195.00 | $195.00 | $195.00 | $195.00 |
| 0470 | Detectable warnings | SQFT A A | 114 | $45.00 | $31.00 | $48.42 | $54.25 | $40.00 |
| 0480 | Pave mark TY 1 tape cross-hatch | SQFT A A | 1,977 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 |
| 0490 | Pave mark-thermo-X-walk-24 in | LF A A | 107 | $12.95 | $12.95 | $12.95 | $12.95 | $12.95 |
| 0500 | Pave mark TY 1 tape-bike | EACH A A | 2 | $695.00 | $695.00 | $695.00 | $695.00 | $695.00 |
| 0510 | Pave mark TY 1 tape-bike | EACH A A | 2 | $325.00 | $325.00 | $325.00 | $325.00 | $325.00 |
| 0520 | Pave mark TY 1 tape-combo arrow | EACH A A | 2 | $655.00 | $655.00 | $655.00 | $655.00 | $655.00 |
| 0530 | Pave mark TY 1 tape-curv arrow | EACH A A | 2 | $525.00 | $525.00 | $525.00 | $525.00 | $525.00 |
| 0540 | Pave mark-thermo "bus" 8 FT | EACH A A | 1 | $575.00 | $575.00 | $575.00 | $575.00 | $575.00 |
| 0550 | Bike path | SQYD A A | 544 | $118.00 | $118.00 | $118.00 | $118.00 | $118.00 |
| 0560 | Pave marking thermo-bike lane arrow | EACH A A | 112 | $75.00 | $75.00 | $75.00 | $75.00 | $75.00 |
| 0570 | Pave mark thermo chevron | SQFT A A | 126 | $4.95 | $4.95 | $4.95 | $4.95 | $4.95 |
| 0580 | Pave mark TY 1 tape cone cap-solid Y | SQFT A A | 40 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 |
| 0590 | Pave marking-thermo shared lane marking | EACH A A | 2 | $225.00 | $225.00 | $225.00 | $225.00 | $225.00 |
| 0600 | SBM alum sheet signs .080 in | SQFT A A | 614.33 | $35.00 | $41.00 | $47.17 | $37.97 | $47.17 |
| 0610 | Steel post type 1 | LF A A | 1,157 | $35.00 | $36.00 | $31.52 | $37.98 | $31.52 |
| 0620 | Install span mounted sign | EACH A A | 1 | $650.00 | $650.00 | $2,610.87 | $705.25 | $2,610.87 |
| 0630 | Remove sign | EACH A A | 38 | $100.00 | $150.00 | $102.85 | $108.50 | $102.85 |
| 0640 | Remove and relocate sheet signs | EACH A A | 26 | $400.00 | $300.00 | $550.88 | $434.00 | $550.88 |
| 0650 | Barcode sign inventory | EACH A A | 130 | $20.00 | $15.00 | $25.71 | $21.70 | $25.71 |
| 0660 | Bracket 4 FT | EACH A A | 8 | $1,500.00 | $1,500.00 | $600.00 | $1,627.50 | $1,500.00 |
| 0670 | Bracket 8 FT | EACH A A | 12 | $1,700.00 | $1,700.00 | $900.00 | $1,844.50 | $1,700.00 |
| 0680 | Bracket 12 FT | EACH A A | 8 | $1,900.00 | $1,900.00 | $1,000.00 | $2,061.50 | $1,900.00 |
| 0690 | Fused connector kit | EACH A A | 25 | $250.00 | $250.00 | $285.00 | $271.25 | $250.00 |
| 0700 | Trenching and backfilling | LF A A | 255 | $65.60 | $65.60 | $35.00 | $71.18 | $65.60 |
| 0710 | Wire-no. 12 | LF A A | 13,410 | $1.18 | $1.18 | $2.25 | $1.28 | $1.18 |
| 0720 | Cable-no. 14/5C | LF A A | 4,420 | $1.83 | $1.83 | $5.25 | $1.99 | $1.83 |
| 0730 | Cable-no. 14/7C | LF A A | 13,040 | $2.22 | $2.22 | $6.25 | $2.41 | $2.22 |
| 0740 | Messenger-10800 LB | LF A A | 2,055 | $15.00 | $15.00 | $13.25 | $16.28 | $15.00 |
| 0750 | Messenger-15400 LB | LF A A | 410 | $15.00 | $15.00 | $15.00 | $16.28 | $15.00 |
| 0760 | Install steel strain pole | EACH A A | 28 | $15,000 | $15,000 | $5,250.00 | $16,275 | $15,000 |
| 0770 | Install pedestrian head-LED | EACH A A | 56 | $1,000.00 | $1,000.00 | $800.00 | $1,085.00 | $1,000.00 |
| 0780 | Install LED signal-3 section | EACH A A | 68 | $800.00 | $800.00 | $1,225.00 | $868.00 | $800.00 |
| 0790 | Install LED signal- 4 section | EACH A A | 6 | $900.00 | $900.00 | $1,500.00 | $976.50 | $900.00 |
| 0800 | Install coordinating unit | EACH A A | 7 | $2,500.00 | $2,500.00 | $300.00 | $2,712.50 | $2,500.00 |
| 0810 | Install pedestrian detector | EACH A A | 56 | $500.00 | $500.00 | $600.00 | $542.50 | $500.00 |
| 0820 | Traffic signal pole base | CUYD A A | 114.50 | $300.00 | $300.00 | $2,640.00 | $325.50 | $300.00 |
| 0830 | Install signal pedestal | EACH A A | 5 | $5,500.00 | $5,500.00 | $4,750.00 | $5,967.50 | $5,500.00 |
| 0840 | Tether wire | LF A A | 2,465 | $10.00 | $10.00 | $9.00 | $10.85 | $10.00 |
| 0850 | LED luminaire | EACH A A | 28 | $1,500.00 | $1,500.00 | $1,500.00 | $1,627.50 | $1,500.00 |
| 0860 | PVC conduit-1 1/4 in-schedule 80 | LF A A | 174 | $1.07 | $1.07 | $8.00 | $1.16 | $1.07 |
| 0870 | PVC conduit-2 in-schedule 80 | LF A A | 505 | $1.47 | $1.47 | $10.00 | $1.59 | $1.47 |
| 0880 | Install signal controller-TY atc | EACH A A | 7 | $9,000.00 | $9,000.00 | $15,000 | $9,765.00 | $9,000.00 |
| 0890 | Remove signal equipment | EACH A A | 7 | $28,563 | $29,500 | $6,500.00 | $30,991 | $28,563 |
| 0900 | Install radar presence detector type A | EACH A A | 29 | $1,500.00 | $1,500.00 | $1,200.00 | $1,627.50 | $1,500.00 |
| 0910 | Mobilization | LS A A | 1 | $135,000 | $111,816 | $160,000 | $83,105 | $161,500 |
| 0920 | Demobilization | LS A A | 1 | $42,000 | $49,716 | $50,000 | $54,393 | $58,047 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of January 29, 2026. Compiled by Mirage Metrics.