KYTC contract 26-2162 bid tabulation
ASPHALT RESURFACING JEFFERSON COUNTY (KY 61, KY 1703). Let by Kentucky Transportation Cabinet on October 22, 2026. 5 bids received; low bid $1,605,000 by Hall Contracting of Kentucky Inc, -13% against the engineer's estimate of $1,850,350.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 22 OCT 2026
- Pay items
- 58
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Hall Contracting of Kentucky Inc | $1,605,000 | Low | -13% |
| 2 | Louisville Paving Company Inc | $1,671,100 | +4.0% | -10% |
| 3 | Flynn Brothers Contracting Inc | $1,773,546 | +11% | -4.0% |
| 4 | Mac Construction & Excavating Inc | $1,781,021 | +11% | -4.0% |
| 5 | E & B Paving LLC | $1,846,615 | +15% | 0.0% |
Engineer's estimate: $1,850,350.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Hall Contracting of Kentucky Inc | 2. Louisville Paving Company Inc | 3. Flynn Brothers Contracting Inc | 4. Mac Construction & Excavating Inc | 5. E & B Paving LLC |
|---|---|---|---|---|---|---|---|---|
| 0010 | Leveling & wedging PG64-22 | TON A A | 857 | $84.50 | $99.00 | $87.25 | $101.00 | $85.00 |
| 0020 | CL3 asph surf 0.38B PG64-22 | TON A A | 1,580 | $88.50 | $100.00 | $81.95 | $101.00 | $95.00 |
| 0030 | Adjust manhole frame to grade | EACH A A | 23 | $225.00 | $300.00 | $285.00 | $160.00 | $800.00 |
| 0040 | Standard curb and gutter mod | LF A A | 60 | $62.47 | $78.09 | $92.45 | $167.00 | $160.00 |
| 0050 | Temporary signs | SQFT A A | 1,210 | $4.00 | $4.00 | $4.60 | $5.00 | $3.00 |
| 0060 | Maintain & control traffic | LS A A | 1 | $15,051 | $49,000 | $51,970 | $37,023 | $12,285 |
| 0070 | Maintain & control traffic | LS A A | 1 | $35,400 | $49,000 | $86,085 | $24,500 | $12,285 |
| 0080 | Maintain & control traffic | LS A A | 1 | $30,360 | $49,000 | $75,745 | $26,500 | $13,830 |
| 0090 | Portable changeable message sign | EACH A A | 6 | $750.00 | $1,272.00 | $650.00 | $1,000.00 | $500.00 |
| 0100 | Mobilization for mill & text | LS A A | 1 | $11,000 | $4,000.00 | $1,750.00 | $5,000.00 | $2,500.00 |
| 0110 | Mobilization for mill & text | LS A A | 1 | $11,000 | $4,000.00 | $1,750.00 | $5,000.00 | $2,500.00 |
| 0120 | Mobilization for mill & text | LS A A | 1 | $11,000 | $4,000.00 | $1,750.00 | $5,000.00 | $2,500.00 |
| 0130 | Asphalt pave milling & texturing | TON A A | 8,785 | $21.00 | $12.00 | $22.00 | $25.00 | $40.00 |
| 0140 | Edgeline rumble strips | LF A A | 16,265 | $0.26 | $0.26 | $0.42 | $0.42 | $1.05 |
| 0150 | Sidewalk-4 in concrete | SQYD A A | 60 | $87.34 | $87.34 | $240.00 | $220.00 | $455.00 |
| 0160 | Arrow panel | EACH A A | 6 | $250.00 | $848.00 | $424.00 | $600.00 | $300.00 |
| 0170 | Base failure repair | SQYD A A | 1,165 | $90.00 | $65.00 | $80.55 | $69.00 | $56.00 |
| 0180 | Adjust water valve | EACH A A | 29 | $100.00 | $300.00 | $115.00 | $35.00 | $243.00 |
| 0190 | Conduit-1 1/4 in | LF A A | 60 | $25.00 | $25.00 | $10.23 | $25.00 | $20.00 |
| 0200 | Conduit-2 in | LF A A | 10 | $34.00 | $34.00 | $14.17 | $34.00 | $20.00 |
| 0210 | Trenching and backfilling | LF A A | 65 | $9.00 | $9.00 | $15.00 | $9.00 | $50.00 |
| 0220 | Piezoelectric sensor | EACH A A | 3 | $3,000.00 | $3,000.00 | $3,500.00 | $3,000.00 | $500.00 |
| 0230 | Loop wire | LF A A | 1,250 | $1.54 | $1.54 | $0.50 | $1.54 | $5.00 |
| 0240 | Loop saw slot and fill | LF A A | 290 | $12.38 | $12.38 | $15.22 | $12.38 | $25.00 |
| 0250 | Remove and replace sidewalk | SQYD A A | 4 | $202.74 | $500.00 | $550.00 | $2,000.00 | $550.00 |
| 0260 | Pave striping-temp paint-6 in | LF A A | 94,900 | $0.10 | $0.10 | $0.17 | $0.17 | $1.02 |
| 0270 | Pave striping-thermo-6 in W | LF A A | 50,000 | $0.82 | $0.82 | $0.90 | $0.90 | $1.05 |
| 0280 | Pave striping-thermo-6 in Y | LF A A | 44,900 | $0.82 | $0.82 | $0.90 | $0.90 | $1.05 |
| 0290 | Pave striping-thermo-12 in W | LF A A | 1,590 | $1.85 | $1.85 | $1.80 | $1.80 | $1.10 |
| 0300 | Pave striping-thermo-12 in Y | LF A A | 375 | $1.85 | $1.85 | $1.80 | $1.80 | $1.10 |
| 0310 | Pave striping-dur TY 1-6 in W | LF A A | 385 | $6.77 | $6.77 | $9.00 | $9.00 | $1.05 |
| 0320 | Pave striping-dur TY 1-6 in Y | LF A A | 515 | $6.77 | $6.77 | $9.00 | $9.00 | $1.05 |
| 0330 | Pave marking-thermo R 6 FT | EACH A A | 4 | $120.56 | $120.56 | $65.00 | $65.00 | $1.20 |
| 0340 | Pave marking-R/R xbucks 16 in | LF A A | 80 | $12.00 | $12.00 | $9.00 | $9.00 | $1.20 |
| 0350 | Pave marking-thermo X-walk-6 in | LF A A | 3,760 | $2.12 | $2.12 | $2.95 | $2.95 | $1.20 |
| 0360 | Pave marking-thermo stop bar-24IN | LF A A | 942 | $9.00 | $9.00 | $10.50 | $10.50 | $1.25 |
| 0370 | Pave marking-thermo cross-hatch | SQFT A A | 1,810 | $2.50 | $2.50 | $3.75 | $3.75 | $1.50 |
| 0380 | Pave marking-thermo STR arrow | EACH A A | 2 | $90.00 | $90.00 | $95.00 | $95.00 | $1.50 |
| 0390 | Pave marking-thermo curv arrow | EACH A A | 110 | $90.00 | $90.00 | $105.00 | $105.00 | $1.20 |
| 0400 | Pave marking-thermo comb arrow | EACH A A | 2 | $135.00 | $135.00 | $150.00 | $150.00 | $1.20 |
| 0410 | Pave marking-thermo only | EACH A A | 7 | $173.90 | $173.90 | $275.00 | $275.00 | $1.50 |
| 0420 | Remove pavement marker type V | EACH A A | 684 | $7.00 | $6.50 | $10.85 | $6.50 | $5.14 |
| 0430 | Fuel adjustment | DOLL A A | 14,874 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0440 | Asphalt adjustment | DOLL A A | 37,360 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0450 | Galvanized steel cabinet | EACH A A | 1 | $2,133.00 | $2,133.00 | $1,000.00 | $2,133.00 | $500.00 |
| 0460 | Wood post | EACH A A | 2 | $600.00 | $600.00 | $500.35 | $600.00 | $1,000.00 |
| 0470 | Electrical junction box type A | EACH A A | 1 | $2,156.00 | $2,156.00 | $3,500.00 | $2,156.00 | $2,500.00 |
| 0480 | Law enforcement officer | HOUR A A | 275 | $85.00 | $80.00 | $85.00 | $85.00 | $60.00 |
| 0490 | Pave mark thermo cone cap-solid yellow | SQFT A A | 560 | $6.20 | $6.20 | $5.00 | $5.00 | $5.00 |
| 0500 | Pave marking-thermo yield bar-36 in | LF A A | 140 | $55.00 | $55.00 | $28.00 | $28.00 | $2.50 |
| 0510 | CL3 asph surf 0.38A PG64-22 | TON A A | 7,205 | $88.50 | $100.00 | $86.35 | $101.00 | $100.00 |
| 0520 | Detectable warnings | SQFT A A | 40 | $40.32 | $40.32 | $64.50 | $45.00 | $45.00 |
| 0530 | Pave mark-thermo-X-walk-24 in | LF A A | 1,390 | $8.00 | $8.00 | $11.50 | $11.50 | $1.50 |
| 0540 | Pave mark thermo chevron | SQFT A A | 205 | $6.00 | $6.00 | $3.50 | $3.50 | $2.00 |
| 0550 | Pave marking-thermo dotted lane exten | LF A A | 950 | $2.80 | $2.80 | $1.95 | $1.95 | $1.50 |
| 0560 | Asphalt material for tack non-tracking | TON A A | 52 | $0.01 | $0.01 | $483.75 | $0.01 | $1.00 |
| 0570 | Install radar presence detector type A | EACH A A | 31 | $1,074.00 | $1,074.00 | $1,545.00 | $1,074.00 | $50.00 |
| 0580 | Demobilization | LS A A | 1 | $24,086 | $25,079 | $27,500 | $27,000 | $35,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of October 22, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.