KYTC contract 26-1101 bid tabulation
ASPHALT PAVEMENT & ROADWAY REHAB KY 245. Let by Kentucky Transportation Cabinet on January 29, 2026. 5 bids received; low bid $16,898,477 by Louisville Paving Company Inc, -6.7% against the engineer's estimate of $18,110,081.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 29 JAN 2026
- Pay items
- 196
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Louisville Paving Company Inc | $16,898,477 | Low | -7.0% |
| 2 | Flynn Brothers Contracting Inc | $17,489,935 | +4.0% | -3.0% |
| 3 | Scotty'S Contracting & Stone LLC | $18,218,435 | +8.0% | +1.0% |
| 4 | Cleary Construction Inc | $18,600,000 | +10% | +3.0% |
| 5 | Mac Construction & Excavating Inc | $19,983,000 | +18% | +10% |
Engineer's estimate: $18,110,081.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Louisville Paving Company Inc | 2. Flynn Brothers Contracting Inc | 3. Scotty'S Contracting & Stone LLC | 4. Cleary Construction Inc | 5. Mac Construction & Excavating Inc |
|---|---|---|---|---|---|---|---|---|
| 0010 | Crushed stone base | TON A A | 59,485 | $33.50 | $30.50 | $35.25 | $30.50 | $36.00 |
| 0020 | Lime stabilized roadbed | SQYD A A | 100,178 | $10.56 | $7.40 | $7.15 | $7.40 | $5.00 |
| 0030 | Lime | TON A A | 1,828 | $250.00 | $250.00 | $250.00 | $250.00 | $235.00 |
| 0040 | Traffic bound base | TON A A | 500 | $66.32 | $30.50 | $50.88 | $50.00 | $50.00 |
| 0050 | Asphalt seal aggregate | TON A A | 173 | $65.00 | $65.00 | $161.70 | $95.00 | $200.00 |
| 0060 | Asphalt seal coat | TON A A | 20 | $265.00 | $265.00 | $1,097.35 | $900.00 | $873.00 |
| 0070 | CL2 asph base 1.00D PG64-22 | TON A A | 9,295 | $76.00 | $77.35 | $78.50 | $76.50 | $105.00 |
| 0080 | CL3 asph base 1.00D PG64-22 | TON A A | 24,819 | $73.00 | $78.60 | $76.15 | $76.50 | $65.00 |
| 0090 | CL2 asph surf 0.38D PG64-22 | TON A A | 2,554 | $103.10 | $92.30 | $91.70 | $94.40 | $105.00 |
| 0100 | Asphalt material for tack | TON A A | 80.40 | $0.01 | $0.01 | $495.00 | $0.01 | $0.01 |
| 0110 | Asphalt curing seal | TON A A | 100 | $750.00 | $650.00 | $730.00 | $875.00 | $750.00 |
| 0120 | JPC pavement-11 in | SQYD A A | 1,171 | $151.24 | $151.24 | $151.24 | $151.24 | $155.00 |
| 0130 | JPC pavement-8 in | SQYD A A | 319 | $112.67 | $319.00 | $112.67 | $112.67 | $112.00 |
| 0140 | Remove pavement | SQYD A A | 42,036 | $3.91 | $5.00 | $2.85 | $2.00 | $1.50 |
| 0150 | Edge key | LF A A | 234.60 | $2.65 | $15.00 | $39.05 | $55.00 | $46.00 |
| 0160 | Sand for blotter | TON A A | 250 | $31.00 | $55.00 | $27.84 | $40.00 | $135.00 |
| 0170 | Joint adhesive | LF A A | 56,250 | $0.50 | $0.50 | $1.00 | $0.50 | $0.33 |
| 0180 | CL3 asph surf 0.38A PG64-22 | TON A A | 5,682 | $84.00 | $94.55 | $98.65 | $94.40 | $100.00 |
| 0190 | Pave mount infrared temp equipment | SF A A | 619,839 | $0.01 | $0.02 | $0.01 | $0.01 | $0.01 |
| 0200 | Electronic delivery MGMT system - agg | LS A A | 1 | $0.01 | $1.00 | $0.01 | $0.01 | $1,000.00 |
| 0210 | Crushed aggregate size no 2 | TON A A | 6,670 | $70.00 | $26.50 | $44.19 | $58.00 | $48.00 |
| 0220 | Crushed aggregate size no 2 | TON A A | 4 | $242.87 | $26.50 | $44.19 | $335.00 | $135.00 |
| 0230 | Perforated pipe-6 in | LF A A | 243 | $28.92 | $25.00 | $14.07 | $30.00 | $35.00 |
| 0240 | Non-perforated pipe-6 in | LF A A | 48 | $42.86 | $25.00 | $16.45 | $32.00 | $36.00 |
| 0250 | Perf pipe headwall TY 1-6 in | EACH A A | 1 | $1,947.00 | $750.00 | $828.42 | $615.00 | $900.00 |
| 0260 | Perf pipe headwall TY 2-6 in | EACH A A | 1 | $2,211.58 | $750.00 | $1,575.93 | $1,000.00 | $1,025.00 |
| 0270 | Perf pipe headwall TY 3-6 in | EACH A A | 2 | $4,425.16 | $750.00 | $1,376.53 | $1,500.00 | $1,150.00 |
| 0280 | Island curb and gutter | LF A A | 11,959.70 | $25.80 | $25.80 | $25.80 | $25.80 | $31.00 |
| 0290 | Island integral curb | LF A A | 199 | $26.91 | $26.91 | $26.90 | $26.91 | $33.00 |
| 0300 | Delineator for guardrail mono directional white | EACH A A | 62 | $14.86 | $14.86 | $14.86 | $14.86 | $14.86 |
| 0310 | Barricade-type III | EACH A A | 20 | $107.06 | $125.00 | $125.00 | $106.00 | $133.00 |
| 0320 | Cement concrete island | SQYD A A | 6,797 | $47.83 | $47.83 | $47.83 | $47.83 | $51.00 |
| 0330 | Paved ditch type 1 | SQYD A A | 52 | $195.37 | $195.37 | $195.37 | $195.37 | $225.00 |
| 0340 | Temp ditch | LF A A | 10,000 | $0.50 | $0.50 | $0.01 | $1.00 | $2.00 |
| 0350 | Clean temp ditch | LF A A | 5,000 | $0.50 | $1.00 | $0.01 | $0.01 | $1.00 |
| 0360 | Structure excav-unclassified | CUYD A A | 651 | $104.51 | $45.00 | $94.99 | $177.00 | $100.00 |
| 0370 | Granular embankment | CUYD A A | 5,926 | $65.94 | $47.00 | $36.98 | $65.00 | $51.00 |
| 0380 | Embankment in place | CUYD A A | 120,549 | $17.64 | $16.00 | $25.37 | $27.00 | $26.00 |
| 0390 | Water | MGAL A A | 100 | $0.01 | $5.00 | $0.01 | $0.01 | $4.58 |
| 0400 | Single vehicular chain link gate | EACH A A | 2 | $8,252.14 | $8,252.14 | $8,252.14 | $8,252.14 | $8,252.14 |
| 0410 | Double vehicular chain link gate | EACH A A | 1 | $11,539 | $11,539 | $11,539 | $11,539 | $11,539 |
| 0420 | Guardrail terminal section no 1 | EACH A A | 4 | $82.17 | $82.17 | $82.17 | $82.17 | $82.17 |
| 0430 | Guardrail end treatment type 1 | EACH A A | 6 | $3,932.41 | $3,932.41 | $3,932.41 | $3,932.41 | $3,932.41 |
| 0440 | Guardrail end treatment type 2M | EACH A A | 4 | $1,912.36 | $1,912.36 | $1,912.36 | $1,912.36 | $1,912.36 |
| 0450 | Remove guardrail | LF A A | 3,355 | $4.07 | $4.07 | $4.07 | $4.07 | $4.07 |
| 0460 | Temp guardrail | LF A A | 500 | $23.02 | $23.02 | $23.03 | $23.02 | $23.02 |
| 0470 | Right-of-way monument type 1 | EACH A A | 25 | $186.29 | $186.29 | $233.60 | $186.29 | $186.29 |
| 0480 | Witness post | EACH A A | 25 | $153.18 | $153.18 | $176.63 | $153.18 | $153.18 |
| 0490 | Fill and cap sinkhole | EACH A A | 2 | $4,472.25 | $3,250.00 | $16,977 | $15,000 | $10,000 |
| 0500 | Clearing and grubbing | LS A A | 1 | $52,133 | $85,000 | $117,000 | $80,000 | $500,000 |
| 0510 | Concrete-class B | CUYD A A | 336.60 | $562.41 | $650.00 | $553.35 | $913.44 | $760.00 |
| 0520 | Temporary signs | SQFT A A | 700 | $5.00 | $5.00 | $7.50 | $5.00 | $7.50 |
| 0530 | Fabric-geotextile class 1 | SQYD A A | 18,450 | $3.82 | $1.33 | $2.08 | $3.00 | $2.00 |
| 0540 | Fabric-geotextile class 2 | SQYD A A | 18,133 | $1.88 | $1.20 | $1.94 | $2.75 | $2.00 |
| 0550 | Handrail-type A-1 | LF A A | 328 | $83.00 | $86.00 | $86.00 | $108.00 | $86.00 |
| 0560 | Maintain & control traffic | LS A A | 1 | $50,000 | $250,000 | $318,135 | $187,000 | $600,000 |
| 0570 | Diversions (by-pass detours) | LS A A | 1 | $292,588 | $415,000 | $413,581 | $370,000 | $317,022 |
| 0580 | Diversions (by-pass detours) | LS A A | 1 | $5,921.20 | $25,000 | $10,959 | $50,000 | $40,000 |
| 0590 | Diversions (by-pass detours) | LS A A | 1 | $6,560.59 | $15,000 | $18,762 | $30,000 | $30,000 |
| 0600 | Diversions (by-pass detours) | LS A A | 1 | $6,560.59 | $25,000 | $7,420.00 | $30,000 | $30,000 |
| 0610 | Diversions (by-pass detours) | LS A A | 1 | $6,560.59 | $15,000 | $12,554 | $30,000 | $30,000 |
| 0620 | Truck mounted attenuator | EACH A A | 1 | $25,440 | $21,100 | $36,240 | $31,800 | $67,200 |
| 0630 | Portable changeable message sign | EACH A A | 4 | $8,480.00 | $7,025.00 | $8,205.00 | $9,010.00 | $10,600 |
| 0640 | Edgeline rumble strips | LF A A | 18,923 | $0.87 | $0.40 | $0.60 | $0.40 | $0.40 |
| 0650 | Temp silt fence | LF A A | 10,000 | $1.66 | $1.97 | $2.61 | $2.75 | $2.00 |
| 0660 | Silt trap type A | EACH A A | 65 | $1.00 | $150.00 | $112.88 | $350.00 | $350.00 |
| 0670 | Silt trap type B | EACH A A | 65 | $1.00 | $150.00 | $275.20 | $150.00 | $150.00 |
| 0680 | Silt trap type C | EACH A A | 65 | $1.00 | $150.00 | $192.96 | $345.00 | $200.00 |
| 0690 | Clean silt trap type A | EACH A A | 65 | $1.00 | $35.00 | $0.01 | $1.00 | $35.00 |
| 0700 | Clean silt trap type B | EACH A A | 65 | $1.00 | $35.00 | $0.01 | $1.00 | $35.00 |
| 0710 | Clean silt trap type C | EACH A A | 65 | $1.00 | $35.00 | $0.01 | $1.00 | $35.00 |
| 0720 | Staking | LS A A | 1 | $130,000 | $95,000 | $125,119 | $165,000 | $290,000 |
| 0730 | Remove lighting | LS A A | 1 | $3,500.00 | $3,500.00 | $12,000 | $3,500.00 | $3,500.00 |
| 0740 | Erosion control blanket | SQYD A A | 8,808 | $1.90 | $1.71 | $1.85 | $1.71 | $1.71 |
| 0750 | Temp mulch | SQYD A A | 208,188 | $0.22 | $0.24 | $0.20 | $0.24 | $0.24 |
| 0760 | Temp seeding and protection | SQYD A A | 155,364 | $0.30 | $0.30 | $0.30 | $0.30 | $0.30 |
| 0770 | Initial fertilizer | TON A A | 11 | $700.00 | $988.00 | $1,500.00 | $988.00 | $988.00 |
| 0780 | Maintenance fertilizer | TON A A | 7 | $700.00 | $988.00 | $1,500.00 | $988.00 | $988.00 |
| 0790 | Seeding and protection | SQYD A A | 193,600 | $0.34 | $0.44 | $0.42 | $0.44 | $0.44 |
| 0800 | Sodding | SQYD A A | 627 | $8.50 | $10.20 | $10.00 | $10.20 | $10.20 |
| 0810 | Agricultural limestone | TON A A | 110 | $130.00 | $94.00 | $85.00 | $94.00 | $94.00 |
| 0820 | Pave striping-temp paint-6 in | LF A A | 95,382 | $0.25 | $0.25 | $0.50 | $0.25 | $0.25 |
| 0830 | Pave striping-thermo-6 in W | LF A A | 28,823 | $1.25 | $1.25 | $2.50 | $1.25 | $1.25 |
| 0840 | Pave striping-thermo-6 in Y | LF A A | 19,731 | $1.25 | $1.25 | $2.50 | $1.25 | $1.25 |
| 0850 | Pave striping-thermo-12 in W | LF A A | 1,131 | $2.50 | $2.50 | $5.00 | $2.50 | $2.50 |
| 0860 | Pave striping-thermo-12 in Y | LF A A | 348 | $3.25 | $3.25 | $6.50 | $3.25 | $3.25 |
| 0870 | Pave striping-temp rem tape-B | LF A A | 5,000 | $2.75 | $2.75 | $5.50 | $2.75 | $2.75 |
| 0880 | Pave striping-temp rem tape-W | LF A A | 5,000 | $2.25 | $2.25 | $4.50 | $2.25 | $2.25 |
| 0890 | Pave striping-temp rem tape-Y | LF A A | 5,000 | $2.25 | $2.25 | $4.50 | $2.25 | $2.25 |
| 0900 | Pave marking-thermo stop bar-24IN | LF A A | 80 | $13.00 | $13.00 | $26.00 | $13.00 | $13.00 |
| 0910 | Pave marking-thermo cross-hatch | SQFT A A | 524 | $4.95 | $4.95 | $9.90 | $4.95 | $4.95 |
| 0920 | Pave marking-thermo curv arrow | EACH A A | 64 | $115.00 | $115.00 | $230.00 | $115.00 | $115.00 |
| 0930 | Pave marking-thermo only | EACH A A | 3 | $295.00 | $295.00 | $590.00 | $295.00 | $295.00 |
| 0940 | Pavement marker TY iva-by temp | EACH A A | 1,013 | $7.00 | $7.00 | $14.00 | $7.00 | $7.00 |
| 0950 | Inlaid pavement marker-MW | EACH A A | 340 | $28.00 | $28.00 | $56.00 | $28.00 | $28.00 |
| 0960 | Inlaid pavement marker-MY | EACH A A | 160 | $28.00 | $28.00 | $56.00 | $28.00 | $28.00 |
| 0970 | Inlaid pavement marker-by | EACH A A | 125 | $28.00 | $28.00 | $56.00 | $28.00 | $28.00 |
| 0980 | Inlaid pavement marker-B Y/R | EACH A A | 4 | $28.00 | $28.00 | $56.00 | $28.00 | $28.00 |
| 0990 | Fuel adjustment | DOLL A A | 118,671 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 1000 | Asphalt adjustment | DOLL A A | 165,572 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 1010 | Object marker TY 3 | EACH A A | 4 | $46.15 | $46.15 | $46.15 | $46.15 | $46.15 |
| 1020 | Pave mark thermo cone cap-solid yellow | SQFT A A | 101 | $6.95 | $6.95 | $13.90 | $6.95 | $6.95 |
| 1030 | G/R steel W beam-S face (7 FT post) | LF A A | 3,050 | $32.68 | $32.68 | $32.68 | $32.68 | $32.68 |
| 1040 | Pave marking-thermo yield bar-36 in | LF A A | 19 | $29.00 | $29.00 | $58.00 | $29.00 | $29.00 |
| 1050 | Water blasting existing stripe | LF A A | 9,460 | $0.82 | $0.82 | $1.64 | $0.82 | $0.82 |
| 1060 | Turf reinforcement mat 1 | SQYD A A | 7,979 | $5.50 | $5.33 | $8.50 | $5.33 | $5.33 |
| 1070 | Pave mark thermo-lane reduction arrow | EACH A A | 4 | $395.00 | $395.00 | $790.00 | $395.00 | $395.00 |
| 1080 | Pave striping-chevron markings | SQFT A A | 302 | $4.95 | $4.95 | $9.90 | $4.95 | $4.95 |
| 1090 | Chain link fence | LF A A | 2,309 | $61.19 | $61.19 | $61.19 | $61.19 | $61.19 |
| 1100 | Pipeline inspection | LF A A | 755 | $3.31 | $3.31 | $3.31 | $3.31 | $3.31 |
| 1110 | Utility coordination | LS A A | 1 | $1.00 | $50,000 | $25,897 | $25,000 | $10,000 |
| 1120 | Pave mark-thermo polymer mod combo arrow | EACH A A | 4 | $350.00 | $350.00 | $700.00 | $350.00 | $350.00 |
| 1130 | Entrance pipe-12 in | LF A A | 43 | $73.68 | $90.00 | $95.79 | $105.00 | $70.00 |
| 1140 | Entrance pipe-15 in | LF A A | 262 | $103.59 | $73.00 | $97.83 | $115.00 | $80.00 |
| 1150 | Entrance pipe-18 in | LF A A | 151 | $95.20 | $116.00 | $116.50 | $125.00 | $90.00 |
| 1160 | Entrance pipe-24 in | LF A A | 138 | $121.88 | $120.00 | $128.52 | $145.00 | $105.00 |
| 1170 | Culvert pipe-15 in | LF A A | 100 | $211.63 | $130.00 | $111.17 | $165.00 | $115.00 |
| 1180 | Culvert pipe-18 in | LF A A | 282 | $169.00 | $175.00 | $190.42 | $305.00 | $200.00 |
| 1190 | Culvert pipe-24 in | LF A A | 97 | $243.00 | $200.00 | $265.34 | $185.00 | $265.00 |
| 1200 | Culvert pipe-30 in | LF A A | 69 | $283.00 | $160.00 | $256.35 | $195.00 | $270.00 |
| 1210 | Culvert pipe-66 in | LF A A | 104 | $360.00 | $325.00 | $446.05 | $385.00 | $550.00 |
| 1220 | Storm sewer pipe-15 in | LF A A | 919 | $116.00 | $135.00 | $230.83 | $205.00 | $200.00 |
| 1230 | Storm sewer pipe-18 in | LF A A | 49 | $196.00 | $175.00 | $308.24 | $210.00 | $210.00 |
| 1240 | Pipe culvert headwall-15 in | EACH A A | 1 | $2,325.00 | $1,900.00 | $2,060.00 | $4,000.00 | $1,700.00 |
| 1250 | Pipe culvert headwall-18 in | EACH A A | 1 | $2,350.00 | $1,900.00 | $2,266.00 | $4,500.00 | $1,800.00 |
| 1260 | Pipe culvert headwall-66 in | EACH A A | 2 | $18,500 | $22,750 | $16,274 | $25,000 | $15,000 |
| 1270 | Sloped box outlet type 1-18 in | EACH A A | 3 | $2,750.00 | $2,650.00 | $3,500.00 | $5,500.00 | $3,000.00 |
| 1280 | Sloped box outlet type 1-24 in | EACH A A | 1 | $3,570.00 | $3,500.00 | $4,200.00 | $6,000.00 | $4,200.00 |
| 1290 | S & F box inlet-outlet-18 in | EACH A A | 2 | $3,400.00 | $3,225.00 | $3,600.00 | $6,500.00 | $2,800.00 |
| 1300 | S & F box inlet-outlet-24 in | EACH A A | 1 | $4,725.00 | $3,925.00 | $5,000.00 | $7,500.00 | $3,600.00 |
| 1310 | S & F box inlet-outlet-30 in | EACH A A | 3 | $7,000.00 | $5,950.00 | $7,000.00 | $8,000.00 | $5,800.00 |
| 1320 | Curb box inlet type A | EACH A A | 11 | $5,771.00 | $6,500.00 | $6,800.00 | $10,750 | $8,500.00 |
| 1330 | Drop box inlet type 1 | EACH A A | 5 | $5,910.00 | $8,050.00 | $6,000.00 | $10,000 | $7,000.00 |
| 1340 | Drop box inlet type 12A | LF A A | 6 | $2,675.00 | $975.00 | $1,500.00 | $3,000.00 | $2,500.00 |
| 1350 | Cap drop box inlet | EACH A A | 2 | $2,015.00 | $850.00 | $2,000.00 | $4,000.00 | $5,300.00 |
| 1360 | Junction box-30 in | EACH A A | 1 | $3,470.00 | $2,450.00 | $4,000.00 | $4,500.00 | $4,500.00 |
| 1370 | Channel lining class II | TON A A | 8 | $383.00 | $50.00 | $96.30 | $85.00 | $175.00 |
| 1380 | Channel lining class III | TON A A | 126 | $135.00 | $50.00 | $107.71 | $95.00 | $100.00 |
| 1390 | Fabric-geotextile class 2 for pipe | SQYD A A | 2,492 | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 |
| 1400 | Cored hole drainage box con- 18 in | EACH A A | 2 | $750.00 | $1,875.00 | $1,500.00 | $2,850.00 | $1,900.00 |
| 1410 | Cored hole drainage box con-15 in | EACH A A | 2 | $750.00 | $1,875.00 | $1,500.00 | $2,750.00 | $1,850.00 |
| 1420 | Junction box-66 in | EACH A A | 2 | $10,700 | $10,600 | $10,500 | $9,500.00 | $10,000 |
| 1430 | Remove concrete masonry | CUYD A A | 25.90 | $1,522.00 | $350.00 | $290.00 | $290.00 | $300.00 |
| 1440 | Foundation preparation | LS A A | 1 | $145,188 | $25,000 | $12,000 | $12,000 | $39,000 |
| 1450 | Concrete-class A | CUYD A A | 96.50 | $832.00 | $1,650.00 | $1,240.00 | $1,240.00 | $1,400.00 |
| 1460 | Steel reinforcement | LB A A | 14,606 | $1.50 | $1.95 | $1.63 | $1.63 | $1.53 |
| 1470 | Remove concrete masonry | CUYD A A | 38.70 | $1,147.50 | $350.00 | $290.00 | $290.00 | $300.00 |
| 1480 | Foundation preparation | LS A A | 1 | $83,710 | $15,000 | $12,000 | $8,500.00 | $27,000 |
| 1490 | Concrete-class A | CUYD A A | 50.10 | $1,329.00 | $1,795.00 | $1,949.00 | $1,949.00 | $1,700.00 |
| 1500 | Steel reinforcement | LB A A | 5,719 | $1.48 | $1.95 | $1.62 | $1.62 | $1.53 |
| 1510 | Foundation preparation | LS A A | 1 | $634,045 | $995,000 | $627,661 | $450,000 | $970,000 |
| 1520 | Concrete-class A | CUYD A A | 615.10 | $847.00 | $1,610.00 | $1,027.00 | $1,027.00 | $1,380.00 |
| 1530 | Steel reinforcement | LB A A | 108,608 | $1.50 | $1.95 | $1.54 | $1.54 | $1.53 |
| 1540 | SBM alum sheet signs .080 in | SQFT A A | 361 | $42.48 | $42.48 | $42.48 | $42.48 | $42.48 |
| 1550 | SBM alum sheet signs .125 in | SQFT A A | 118 | $46.46 | $46.46 | $46.46 | $46.46 | $46.46 |
| 1560 | Steel post type 1 | LF A A | 780 | $27.53 | $27.53 | $27.53 | $27.53 | $27.53 |
| 1570 | Steel post mile markers | EACH A A | 4 | $354.95 | $354.95 | $354.95 | $354.95 | $354.95 |
| 1580 | Class A concrete for signs | CUYD A A | 0.23 | $3,725.75 | $3,725.74 | $3,725.74 | $3,725.74 | $3,725.74 |
| 1590 | Remove & relocate signs | EACH A A | 6 | $467.82 | $467.82 | $467.82 | $467.82 | $467.82 |
| 1600 | GMSS type D | EACH A A | 11 | $459.59 | $459.59 | $459.59 | $459.59 | $459.59 |
| 1610 | Barcode sign inventory | EACH A A | 88 | $31.43 | $31.43 | $31.43 | $31.43 | $31.43 |
| 1620 | Cable-no. 14/5C | LF A A | 185 | $3.00 | $3.00 | $5.95 | $3.00 | $3.00 |
| 1630 | Messenger-10800 LB | LF A A | 275 | $10.00 | $10.00 | $9.14 | $10.00 | $10.00 |
| 1640 | Install steel strain pole | EACH A A | 4 | $10,500 | $10,500 | $2,749.00 | $10,500 | $10,500 |
| 1650 | Traffic signal pole base | CUYD A A | 17 | $350.00 | $350.00 | $3,054.00 | $350.00 | $350.00 |
| 1660 | Tether wire | LF A A | 275 | $10.00 | $10.00 | $7.80 | $10.00 | $10.00 |
| 1670 | Install | EACH A A | 2 | $7,750.00 | $7,750.00 | $3,705.00 | $7,750.00 | $7,750.00 |
| 1680 | Remove signal equipment | EACH A A | 1 | $3,500.00 | $3,500.00 | $5,569.00 | $3,500.00 | $3,500.00 |
| 1690 | Pole 40 FT MTG HT | EACH A A | 5 | $4,500.00 | $4,500.00 | $3,238.00 | $4,500.00 | $4,500.00 |
| 1700 | Bracket 15 FT | EACH A A | 5 | $1,200.00 | $1,200.00 | $963.00 | $1,200.00 | $1,200.00 |
| 1710 | Pole base | EACH A A | 5 | $1,500.00 | $1,500.00 | $2,820.00 | $1,500.00 | $1,500.00 |
| 1720 | Transformer base | EACH A A | 5 | $1,400.00 | $1,400.00 | $1,670.00 | $1,400.00 | $1,400.00 |
| 1730 | Fused connector kit | EACH A A | 16 | $250.00 | $250.00 | $265.00 | $250.00 | $250.00 |
| 1740 | Trenching and backfilling | LF A A | 950 | $6.00 | $6.00 | $4.52 | $6.00 | $6.00 |
| 1750 | Wire-no. 12 | LF A A | 900 | $1.50 | $1.50 | $1.13 | $1.50 | $1.50 |
| 1760 | Wire-no. 6 | LF A A | 3,825 | $2.75 | $2.75 | $3.55 | $2.75 | $2.75 |
| 1770 | Remove lighting | LS A A | 1 | $3,500.00 | $3,500.00 | $12,000 | $3,500.00 | $3,500.00 |
| 1780 | Electrical junction box type A | EACH A A | 2 | $2,750.00 | $3,500.00 | $2,000.00 | $2,750.00 | $2,750.00 |
| 1790 | Bore and jack conduit | LF A A | 100 | $50.00 | $50.00 | $62.00 | $50.00 | $50.00 |
| 1800 | LED luminaire | EACH A A | 5 | $700.00 | $700.00 | $865.00 | $700.00 | $700.00 |
| 1810 | PVC conduit-1 1/4 in-schedule 80 | LF A A | 950 | $8.00 | $8.00 | $6.92 | $8.00 | $8.00 |
| 1820 | PVC conduit-2 in-schedule 80 | LF A A | 100 | $10.00 | $10.00 | $9.63 | $10.00 | $10.00 |
| 1830 | W encasement steel bored range 4 | LF A A | 85 | $595.00 | $1,000.00 | $600.00 | $700.00 | $860.00 |
| 1840 | W fire hydrant assembly | EACH A A | 1 | $10,065 | $10,000 | $9,207.00 | $11,500 | $11,000 |
| 1850 | W fire hydrant remove | EACH A A | 1 | $2,737.00 | $3,500.00 | $2,000.00 | $1,250.00 | $2,000.00 |
| 1860 | W pipe DCTL iron RSTRND joint 06 in | LF A A | 150 | $83.00 | $162.05 | $189.00 | $185.00 | $150.00 |
| 1870 | W pipe PVC special | LF A A | 1,520 | $191.00 | $143.35 | $142.00 | $195.00 | $180.00 |
| 1880 | W plug existing main | EACH A A | 3 | $780.00 | $1,500.00 | $3,065.00 | $5,000.00 | $5,000.00 |
| 1890 | W serv PE/PLST long side 1 in | EACH A A | 2 | $13,820 | $6,500.00 | $7,166.00 | $15,000 | $8,000.00 |
| 1900 | W serv PE/PLST short side 1 in | EACH A A | 1 | $12,070 | $11,000 | $10,110 | $14,000 | $3,000.00 |
| 1910 | W tie-in 06 inch | EACH A A | 1 | $14,820 | $8,500.00 | $15,200 | $5,500.00 | $5,000.00 |
| 1920 | W tie-in 08 inch | EACH A A | 2 | $10,425 | $8,500.00 | $14,255 | $8,500.00 | $5,400.00 |
| 1930 | W valve 06 inch | EACH A A | 2 | $2,325.00 | $4,500.00 | $2,366.00 | $2,750.00 | $2,500.00 |
| 1940 | W valve 08 inch | EACH A A | 5 | $3,420.00 | $5,000.00 | $3,300.00 | $4,000.00 | $3,500.00 |
| 1950 | Mobilization | LS A A | 1 | $500,000 | $800,000 | $516,741 | $856,701 | $900,000 |
| 1960 | Demobilization | LS A A | 1 | $253,479 | $275,000 | $257,463 | $264,000 | $300,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of January 29, 2026. Compiled by Mirage Metrics.