KYTC contract 25-2164 bid tabulation
ASPHALT RESURFACING SHELBYVILLE ROAD (US 60). Let by Kentucky Transportation Cabinet on April 24, 2025, Jefferson, District 5. 5 bids received; low bid $1,102,400 by E & B Paving LLC, -20% against the engineer's estimate of $1,381,934.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 24 APR 2025
- Pay items
- 49
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | E & B Paving LLC | $1,102,400 | Low | -20% |
| 2 | Flynn Brothers Contracting Inc | $1,132,143 | +3.0% | -18% |
| 3 | Mac Construction & Excavating Inc | $1,159,562 | +5.0% | -16% |
| 4 | Hall Contracting of Kentucky Inc | $1,180,000 | +7.0% | -15% |
| 5 | Louisville Paving Company Inc | $1,181,000 | +7.0% | -15% |
Engineer's estimate: $1,381,934.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. E & B Paving LLC | 2. Flynn Brothers Contracting Inc | 3. Mac Construction & Excavating Inc | 4. Hall Contracting of Kentucky Inc | 5. Louisville Paving Company Inc |
|---|---|---|---|---|---|---|---|---|
| 0010 | Leveling & wedging PG64-22 | TON A | 880 | $78.00 | $74.60 | $90.00 | $80.00 | $86.00 |
| 0020 | Adjust manhole frame to grade | EACH A | 46 | $50.00 | $135.00 | $110.00 | $200.00 | $300.00 |
| 0030 | Temporary signs | SQFT A | 650 | $7.00 | $4.00 | $7.50 | $4.00 | $4.00 |
| 0040 | Maintain & control traffic | LS A | 1 | $155,869 | $122,775 | $6,438.38 | $76,097 | $64,000 |
| 0050 | Portable changeable message sign | EACH A | 2 | $700.00 | $1,500.00 | $535.00 | $1,000.00 | $636.00 |
| 0060 | Mobilization for mill & text | LS A | 1 | $2,000.00 | $1,000.00 | $2,000.00 | $1,000.00 | $2,000.00 |
| 0070 | Asphalt pave milling & texturing | TON A | 6,020 | $5.00 | $12.00 | $32.00 | $24.00 | $16.47 |
| 0080 | Arrow panel | EACH A | 2 | $475.00 | $400.00 | $321.00 | $500.00 | $424.00 |
| 0090 | Base failure repair | SQYD A | 270 | $88.38 | $75.00 | $77.00 | $100.00 | $75.00 |
| 0100 | Adjust water valve | EACH A | 46 | $109.51 | $162.00 | $42.92 | $75.00 | $100.00 |
| 0110 | Conduit-1 1/4 in | LF A | 50 | $12.64 | $13.65 | $12.64 | $12.64 | $12.64 |
| 0120 | Conduit-2 in | LF A | 15 | $16.37 | $17.68 | $16.37 | $16.37 | $16.37 |
| 0130 | Trenching and backfilling | LF A | 55 | $9.13 | $9.86 | $9.13 | $9.13 | $9.13 |
| 0140 | Piezoelectric sensor | EACH A | 5 | $2,460.68 | $2,657.53 | $2,460.68 | $2,460.68 | $2,460.68 |
| 0150 | Loop wire | LF A | 3,450 | $1.90 | $2.05 | $1.90 | $1.90 | $1.90 |
| 0160 | Loop saw slot and fill | LF A | 660 | $25.65 | $27.70 | $25.65 | $25.65 | $25.65 |
| 0170 | Pave striping-temp paint-4 in | LF A | 55,000 | $0.01 | $0.26 | $0.24 | $0.24 | $0.24 |
| 0180 | Pave striping-thermo-6 in W | LF A | 28,700 | $1.30 | $1.40 | $1.30 | $1.30 | $1.30 |
| 0190 | Pave striping-thermo-6 in W | LF A | 200 | $3.95 | $4.27 | $3.95 | $3.95 | $3.95 |
| 0200 | Pave striping-thermo-6 in Y | LF A | 23,400 | $1.30 | $1.40 | $1.30 | $1.30 | $1.30 |
| 0210 | Pave striping-thermo-12 in W | LF A | 1,745 | $2.60 | $2.81 | $2.60 | $2.60 | $2.60 |
| 0220 | Pave striping-thermo-12 in Y | LF A | 165 | $2.60 | $2.81 | $2.60 | $2.60 | $2.60 |
| 0230 | Pave marking-thermo X-walk-6 in | LF A | 5,115 | $3.95 | $4.27 | $3.95 | $3.95 | $3.95 |
| 0240 | Pave marking-thermo stop bar-24IN | LF A | 1,636 | $12.95 | $13.99 | $12.95 | $12.95 | $12.95 |
| 0250 | Pave marking-thermo cross-hatch | SQFT A | 230 | $5.95 | $6.43 | $5.95 | $5.95 | $5.95 |
| 0260 | Pave marking-thermo STR arrow | EACH A | 4 | $125.00 | $135.00 | $125.00 | $125.00 | $125.00 |
| 0270 | Pave marking-thermo curv arrow | EACH A | 106 | $145.00 | $156.60 | $145.00 | $145.00 | $145.00 |
| 0280 | Pave marking-thermo comb arrow | EACH A | 6 | $165.00 | $178.20 | $165.00 | $165.00 | $165.00 |
| 0290 | Pave marking-thermo only | EACH A | 9 | $305.00 | $329.40 | $305.00 | $305.00 | $305.00 |
| 0300 | Fuel adjustment | DOLL A | 9,370 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0310 | Asphalt adjustment | DOLL A | 23,536 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0320 | Galvanized steel cabinet | EACH A | 1 | $1,107.55 | $1,196.15 | $1,107.55 | $1,107.55 | $1,107.55 |
| 0330 | Wood post | EACH A | 3 | $500.19 | $540.21 | $500.19 | $500.19 | $500.19 |
| 0340 | Electrical junction box type A | EACH A | 1 | $1,365.98 | $1,475.26 | $1,365.98 | $1,365.98 | $1,365.98 |
| 0350 | Law enforcement officer | HOUR A | 150 | $100.00 | $81.00 | $100.00 | $80.00 | $100.00 |
| 0360 | Electrical junction box-10 X 8 X 4 | EACH A | 1 | $544.99 | $588.59 | $544.99 | $544.99 | $544.99 |
| 0370 | Pave marking-thermo yield bar-36 in | LF A | 32 | $34.00 | $36.72 | $34.00 | $34.00 | $34.00 |
| 0380 | Pavement marking-thermo letters | EACH A | 12 | $200.00 | $216.00 | $200.00 | $200.00 | $200.00 |
| 0390 | CL3 asph surf 0.38A PG64-22 | TON A | 6,020 | $78.00 | $75.30 | $82.00 | $83.00 | $91.00 |
| 0400 | Adjust drainage structure | EACH A | 1 | $1,110.15 | $1,035.84 | $525.99 | $3,500.00 | $3,100.00 |
| 0410 | Detectable warnings | SQFT A | 40 | $173.52 | $64.80 | $65.50 | $85.00 | $36.00 |
| 0420 | Pave mark-thermo-X-walk-24 in | LF A | 2,310 | $12.95 | $13.99 | $12.95 | $12.95 | $12.95 |
| 0430 | Pave mark thermo chevron | SQFT A | 270 | $5.95 | $6.43 | $5.95 | $5.95 | $5.95 |
| 0440 | Pave marking-thermo dotted lane exten | LF A | 444 | $4.05 | $4.37 | $4.05 | $4.05 | $4.05 |
| 0450 | Pave marking-thermo elong route shield | EACH A | 2 | $3,400.00 | $3,672.00 | $3,400.00 | $3,400.00 | $3,400.00 |
| 0460 | Asphalt material for tack non-tracking | TON A | 64 | $1.00 | $235.00 | $0.01 | $0.01 | $0.01 |
| 0470 | Install radar presence detector type A | EACH A | 40 | $980.50 | $1,058.94 | $980.50 | $980.50 | $980.50 |
| 0480 | Electronic delivery MGMT system | LS A | 1 | $1.00 | $1.00 | $0.01 | $1.00 | $0.01 |
| 0490 | Demobilization | LS A | 1 | $21,196 | $17,820 | $26,616 | $17,742 | $22,971 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of April 24, 2025. Compiled by Mirage Metrics.