Libs Paving Company Inc: KYTC bid record

Libs Paving Company Inc submitted 21 bids on Kentucky Transportation Cabinet contracts in the data, from 24 AUG 2023 to 22 OCT 2026, and was the low bidder on 3 of them (14%). When it was not low, its total sat a median +10% above the low bid.

Owner
Kentucky Transportation Cabinet
Low bid volume
$2,202,839
Latest bid
22 OCT 2026
Data through
22 OCT 2026
21Bids
3Low bids
14Win rate, percent
+10%Median gap to the low bid when not low, 18 bids

By year

YearBidsLow bidsWin rate
2023300%
20249111%
20257229%
2026200%
Libs Paving Company Inc, KYTC: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 51119%
District 6100%
Libs Paving Company Inc, KYTC: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Mobilization for mill & textLS A A1412 (86%)$650.00$3,500.00
Temporary signsSQFT A A98 (89%)$4.00$6.05
Pave striping-temp paint-4 inLF A A88 (100%)$0.01$0.16
Mobilization for mill & textLS A87 (88%)$500.00$3,000.00
Asphalt adjustmentDOLL A A55 (100%)$1.00$1.00
Fuel adjustmentDOLL A A55 (100%)$1.00$1.00
Pave marking-thermo stop bar-24INLF A A54 (80%)$12.00$12.50
CL2 asph surf 0.38D PG64-22TON73 (43%)$80.00$102.95
Pave striping-perm paint-6 inLF A A53 (60%)$0.24$0.27
Asphalt pave milling & texturingTON82 (25%)$110.00$36.50
Maintain & control trafficLS A82 (25%)$5,000.00$11,500
Leveling & wedging PG64-22TON72 (29%)$80.00$94.00
Libs Paving Company Inc, KYTC: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Libs Paving Company Inc, KYTC: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
22 OCT 202626-3051ASPHALT RESURFACING ROUTT RD (KY 1531)6 of 6$127,369+25%
20 AUG 202626-3016ASPHALT RESURFACING OLD MOODY LN (KY 2856)2 of 6$228,790+7.0%
23 OCT 202525-3114ASPHALT RESURFACING FISHERVILLE RD (KY 148)4 of 8$770,828+5.0%
23 OCT 202525-3115ASPHALT RESURFACING SULPHUR BEDFORD RD (KY 3175)2 of 4$247,816+3.0%
23 OCT 202525-3117ASPHALT RESURFACING VARIOUS ROADS IN HENRY CO5 of 5$493,774+7.0%
24 JUL 202525-2292ASPHALT RESURFACING WEST MAIN STREET (US 31W SOUTHBOUND ONLY)6 of 6$1,341,686+32%
24 JUL 202525-3096ASPHALT RESURFACING LOWER RIVER RD (KY 1230)1 of 6$299,863Low, 1.0% under the second
24 JUL 202525-2113ASPHALT RESURFACING CASTLE HIGHWAY (US 421)1 of 5$1,197,576Low, 0.0% under the second
24 JUL 202525-3090ASPHALT RESURFACING VARIOUS ROADS IN OLDHAM CO3 of 4$533,375+7.0%
12 DEC 202424-2411District 5ASPHALT RESURFACING MT EDEN ROAD (KY 53)6 of 8$708,110+9.0%
12 DEC 202424-2414District 5ASPHALT RESURFACING HENRY COUNTY (US 421 & KY 241)2 of 8$279,647+3.0%
12 DEC 202424-3119District 5ASPHALT RESURFACING VARIOUS ROADS IN SHELBY CO1 of 8$705,400Low, 4.0% under the second
14 NOV 202424-3121District 5ASPHALT RESURFACING VARIOUS ROADS IN TRIMBLE CO3 of 5$260,610+4.0%
26 SEP 202424-3105District 5ASPHALT RESURFACING VARIOUS PROJECTS IN OLDHAM CO3 of 7$388,782+5.0%
22 AUG 202424-2282District 5ASPHALT RESURFACING KY 329 (JEFFERSON & OLDHAM COUNTIES)5 of 7$738,448+12%
20 JUN 202424-2188District 5ASPHALT RESURFACING BEECH GROVE ROAD (KY1494)6 of 6$139,947+23%
22 FEB 202424-2043District 6ASPHALT RESURFACING ENGLISH ROAD (KY 389)5 of 5$214,708+37%
22 FEB 202424-2040District 5ASPHALT RESURFACING RIVER ROAD (KY 389)7 of 7$288,230+31%
26 OCT 202323-3122District 5ASPHALT RESURFACING FRANKLINTON ROAD (KY 1360)4 of 4$256,047+26%
24 AUG 202323-3084District 5ASPHALT RESURFACING OLD HANNA ROAD (KY 1315)4 of 4$178,525+15%
24 AUG 202323-3085District 5ASPHALT RESURFACING GUM STREET (KY 1694)3 of 4$117,419+11%
Libs Paving Company Inc: latest KYTC bids in the data

How this record was read

KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; KYTC's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy